Project List with Parishes

Number Project Name Approval Year Parish
LA-03b Coastwide Nutria Control Program 2002 West Baton Rouge
TV-09 Boston Canal/Vermilion Bay Bank Protection 1992 Vermilion
TV-16 Cheniere Au Tigre Sediment Trapping Demonstration 1997 Vermilion
LA-03b Coastwide Nutria Control Program 2002 Vermilion
ME-08 Dewitt-Rollover Vegetative Plantings Demonstration (Deauthorized) 1991 Vermilion
TV-18 Four Mile Canal Terracing and Sediment Trapping 2000 Vermilion
ME-13 Freshwater Bayou Bank Stabilization 1996 Vermilion
TV-11b Freshwater Bayou Bank Stabilization - Belle Isle Canal to Lock 2000 Vermilion
ME-04 Freshwater Bayou Wetland Protection 1992 Vermilion
TV-17 Lake Portage Land Bridge 1999 Vermilion
TV-12 Little Vermilion Bay Sediment Trapping 1996 Vermilion
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Vermilion
TV-13a Oaks/Avery Canal Hydrologic Restoration, Increment 1 1997 Vermilion
ME-14 Pecan Island Terracing 1998 Vermilion
LA-06 Shoreline Protection Foundation Improvements Demonstration 2004 Vermilion
ME-23 South Pecan Island Freshwater Introduction 2006 Vermilion
ME-22 South White Lake Shoreline Protection 2003 Vermilion
ME-12 Southwest Shore White Lake Demonstration (Deauthorized) 1993 Vermilion
TV-03 Vermilion River Cutoff Bank Protection 1991 Vermilion
TE-28 Brady Canal Hydrologic Restoration 1993 Terrebonne
TE-66 Central Terrebonne Freshwater Enhancement 2009 Terrebonne
LA-03b Coastwide Nutria Control Program 2002 Terrebonne
TE-17 Falgout Canal Planting Demonstration 1991 Terrebonne
LA-05 Floating Marsh Creation Demonstration 2003 Terrebonne
TE-43 GIWW Bank Restoration of Critical Areas in Terrebonne 2001 Terrebonne
TE-20 Isles Dernieres Restoration East Island 1991 Terrebonne
TE-24 Isles Dernieres Restoration Trinity Island 1992 Terrebonne
TE-26 Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island 1993 Terrebonne
TE-19 Lower Bayou LaCache Hydrologic Restoration (Deauthorized) 1991 Terrebonne
TE-51 Madison Bay Marsh Creation and Terracing 2007 Terrebonne
TE-41 Mandalay Bank Protection Demonstration 2000 Terrebonne
TE-37 New Cut Dune and Marsh Restoration 2000 Terrebonne
TE-32a North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 1997 Terrebonne
TE-44 North Lake Mechant Landbridge Restoration 2001 Terrebonne
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Terrebonne
TE-34 Penchant Basin Natural Resources Plan, Increment 1 1997 Terrebonne
TE-22 Point Au Fer Canal Plugs 1992 Terrebonne
TE-29 Raccoon Island Breakwaters Demonstration 1996 Terrebonne
TE-48 Raccoon Island Shoreline Protection/Marsh Creation 2002 Terrebonne
TE-47 Ship Shoal: Whiskey West Flank Restoration 2002 Terrebonne
TE-39 South Lake De Cade Freshwater Introduction 2000 Terrebonne
TE-45 Terrebonne Bay Shore Protection Demonstration 2001 Terrebonne
TE-36 Thin Mat Floating Marsh Enhancement Demonstration 1998 Terrebonne
TE-40 Timbalier Island Dune and Marsh Creation 2000 Terrebonne
TE-18 Timbalier Island Planting Demonstration 1991 Terrebonne
TE-46 West Lake Boudreaux Shoreline Protection and Marsh Creation 2002 Terrebonne
TE-50 Whiskey Island Back Barrier Marsh Creation 2004 Terrebonne
TE-27 Whiskey Island Restoration 1993 Terrebonne
LA-03b Coastwide Nutria Control Program 2002 Tangipahoa
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Tangipahoa
LA-03b Coastwide Nutria Control Program 2002 St. Tammany
PO-21 Eden Isles East Marsh Restoration (Deauthorized) 1994 St. Tammany
PO-06 Fritchie Marsh Restoration 1992 St. Tammany
PO-33 Goose Point/Point Platte Marsh Creation 2004 St. Tammany
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. Tammany
AT-02 Atchafalaya Sediment Delivery 1992 St. Mary
TE-49 Avoca Island Diversion and Land Building 2003 St. Mary
TV-20 Bayou Sale Shoreline Protection 2004 St. Mary
AT-03 Big Island Mining 1992 St. Mary
AT-04 Castille Pass Channel Sediment Delivery 2000 St. Mary
LA-03b Coastwide Nutria Control Program 2002 St. Mary
TV-04 Cote Blanche Hydrologic Restoration 1993 St. Mary
LA-05 Floating Marsh Creation Demonstration 2003 St. Mary
TE-35 Marsh Creation East of the Atchafalaya River - Avoca Island (Deauthorized) 1997 St. Mary
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. Mary
TV-15 Sediment Trapping at "The Jaws" 1997 St. Mary
TE-33 Bayou Boeuf Pump Station (Deauthorized) 1997 St. Martin
LA-03b Coastwide Nutria Control Program 2002 St. Martin
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. Martin
LA-03b Coastwide Nutria Control Program 2002 St. John the Baptist
LA-05 Floating Marsh Creation Demonstration 2003 St. John the Baptist
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. John the Baptist
PO-29 River Reintroduction into Maurepas Swamp 2002 St. John the Baptist
LA-03b Coastwide Nutria Control Program 2002 St. James
BA-25b Mississippi River Reintroduction Into Bayou Lafourche 1996 St. James
BA-34 Mississippi River Reintroduction Into Northwest Barataria Basin 2001 St. James
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. James
PO-20 Red Mud Demonstration (Deauthorized) 1993 St. James
PO-29 River Reintroduction into Maurepas Swamp 2002 St. James
PO-17 Bayou LaBranche Wetland Creation 1991 St. Charles
LA-03b Coastwide Nutria Control Program 2002 St. Charles
LA-05 Floating Marsh Creation Demonstration 2003 St. Charles
PO-28 LaBranche Wetlands Terracing, Planting, and Shoreline Protection 2000 St. Charles
BA-15 Lake Salvador Shore Protection Demonstration 1993 St. Charles
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. Charles
PO-26 Opportunistic Use of the Bonnet Carre Spillway 2000 St. Charles
PO-25 Bayou Bienvenue Pump Station Diversion and Terracing (Deauthorized) 1999 St. Bernard
PO-27 Chandeleur Islands Marsh Restoration 2000 St. Bernard
LA-03b Coastwide Nutria Control Program 2002 St. Bernard
PO-24 Hopedale Hydrologic Restoration 1999 St. Bernard
PO-32 Lake Borgne and MRGO Shoreline Protection 2003 St. Bernard
PO-30 Lake Borgne Shoreline Protection 2001 St. Bernard
PO-19 Mississippi River Gulf Outlet (MRGO) Disposal Area Marsh Protection 1993 St. Bernard
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 St. Bernard
PO-09a Violet Freshwater Distribution (Deauthorized) 1993 St. Bernard
BA-38 Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration 2002 Plaquemines
BS-13 Bayou Lamoque Freshwater Diversion 2006 Plaquemines
MR-08 Beneficial Use of Hopper Dredged Material Demonstration (Deauthorized) 1994 Plaquemines
MR-13 Benneys Bay Diversion 2001 Plaquemines
BS-18 Bertrandville Siphon 2009 Plaquemines
BS-15 Bohemia Missisippi River Reintroduction 2008 Plaquemines
BS-03a Caernarvon Diversion Outfall Management 1992 Plaquemines
PO-27 Chandeleur Islands Marsh Restoration 2000 Plaquemines
MR-06 Channel Armor Gap Crevasse 1993 Plaquemines
LA-03b Coastwide Nutria Control Program 2002 Plaquemines
BA-33 Delta Building Diversion at Myrtle Grove 2001 Plaquemines
BS-10 Delta Building Diversion North of Fort St. Philip 2001 Plaquemines
BS-11 Delta Management at Fort St. Philip 2001 Plaquemines
MR-09 Delta Wide Crevasses 1997 Plaquemines
MR-10 Dustpan Maintenance Dredging Operation for Marsh Creation in the Mississippi River Delta Demonstration 1997 Plaquemines
LA-05 Floating Marsh Creation Demonstration 2003 Plaquemines
BS-07 Grand Bay Crevasse (Deauthorized) 1994 Plaquemines
BA-68 Grand Liard Marsh and Ridge Restoration 2009 Plaquemines
BA-42 Lake Hermitage Marsh Creation 2006 Plaquemines
BA-39 Mississippi River Sediment Delivery System - Bayou Dupont 2003 Plaquemines
MR-12 Mississippi River Sediment Trap 2003 Plaquemines
BA-24 Myrtle Grove Siphon 1996 Plaquemines
BA-03c Naomi Outfall Management 1996 Plaquemines
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Plaquemines
BA-35 Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 2002 Plaquemines
MR-07 Pass-a-Loutre Crevasse (Deauthorized) 1993 Plaquemines
MR-11 Periodic Introduction of Sediment and Nutrients at Selected Diversion Sites Demonstration (Deauthorized) 2000 Plaquemines
BA-40 Riverine Sand Mining/Scofield Island Restoration 2005 Plaquemines
MR-14 Spanish Pass Diversion 2004 Plaquemines
BS-09 Upper Oak River Freshwater Siphon, Phase 1 (Deauthorized) 1999 Plaquemines
MR-15 Venice Ponds Marsh Creation and Crevasses 2006 Plaquemines
MR-03 West Bay Sediment Diversion 1991 Plaquemines
BA-04c West Pointe a la Hache Outfall Management 1993 Plaquemines
BA-47 West Pointe a la Hache Outfall Management 2008 Plaquemines
BS-12 White Ditch Diversion Restoration and Outfall Management 2005 Plaquemines
BS-04a White's Ditch Outfall Management (Deauthorized) 1993 Plaquemines
PO-34 Alligator Bend Marsh Restoration and Shoreline Protection 2007 Orleans
PO-22 Bayou Chevee Shoreline Protection 1996 Orleans
PO-16 Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 1991 Orleans
PO-18 Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 1992 Orleans
LA-03b Coastwide Nutria Control Program 2002 Orleans
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Orleans
LA-03b Coastwide Nutria Control Program 2002 Livingston
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Livingston
BA-22 Bayou L'Ours Ridge Hydrologic Restoration (Deauthorized) 1994 Lafourche
LA-03b Coastwide Nutria Control Program 2002 Lafourche
BA-33 Delta Building Diversion at Myrtle Grove 2001 Lafourche
TE-25 East Timbalier Island Sediment Restoration, Phase 1 1993 Lafourche
TE-30 East Timbalier Island Sediment Restoration, Phase 2 1994 Lafourche
LA-05 Floating Marsh Creation Demonstration 2003 Lafourche
TE-31 Flotant Marsh Fencing Demonstration (Deauthorized) 1994 Lafourche
BA-18 Fourchon Hydrologic Restoration (Deauthorized) 1991 Lafourche
BA-02 GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration 1991 Lafourche
TE-10 Grand Bayou/GIWW Freshwater Diversion (Deauthorized) 1996 Lafourche
BA-29 LA Highway 1 Marsh Creation (Deauthorized) 2000 Lafourche
BA-37 Little Lake Shoreline Protection/ Dedicated Dredging Near Round Lake 2002 Lafourche
BA-25b Mississippi River Reintroduction Into Bayou Lafourche 1996 Lafourche
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Lafourche
TE-52 West Belle Pass Barrier Headland Restoration 2007 Lafourche
TE-23 West Belle Pass Headland Restoration 1992 Lafourche
LA-03b Coastwide Nutria Control Program 2002 Lafayette
LA-03b Coastwide Nutria Control Program 2002 Jefferson Davis
BA-27c Barataria Basin Landbridge Shoreline Protection, Phase 3 2000 Jefferson
BA-27d Barataria Basin Landbridge Shoreline Protection, Phase 4 2002 Jefferson
BA-27 Barataria Basin Landbridge Shoreline Protection, Phases 1 and 2 1998 Jefferson
BA-26 Barataria Bay Waterway East Side Shoreline Protection 1997 Jefferson
BA-23 Barataria Bay Waterway West Side Shoreline Protection 1994 Jefferson
BA-19 Barataria Bay Waterway Wetland Restoration 1991 Jefferson
BA-48 Bayou Dupont Marsh and Ridge Creation 2008 Jefferson
BA-21 Bayou Perot/Bayou Rigolettes Marsh Restoration (Deauthorized) 1993 Jefferson
LA-03b Coastwide Nutria Control Program 2002 Jefferson
BA-36 Dedicated Dredging on the Barataria Basin Landbridge 2002 Jefferson
BA-33 Delta Building Diversion at Myrtle Grove 2001 Jefferson
BA-30 East/West Grand Terre Islands Restoration (Transfered) 2000 Jefferson
LA-05 Floating Marsh Creation Demonstration 2003 Jefferson
BA-20 Jonathan Davis Wetland Protection 1992 Jefferson
BA-39 Mississippi River Sediment Delivery System - Bayou Dupont 2003 Jefferson
BA-03c Naomi Outfall Management 1996 Jefferson
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Jefferson
BA-41 South Shore of the Pen Shoreline Protection and Marsh Creation 2005 Jefferson
BA-28 Vegetative Plantings of a Dredged Material Disposal Site on Grand Terre Island 1998 Jefferson
LA-03b Coastwide Nutria Control Program 2002 Iberville
LA-03b Coastwide Nutria Control Program 2002 Iberia
TV-21 East Marsh Island Marsh Creation 2005 Iberia
TV-14 Marsh Island Hydrologic Restoration 1997 Iberia
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Iberia
TV-13a Oaks/Avery Canal Hydrologic Restoration, Increment 1 1997 Iberia
TV-19 Weeks Bay Marsh Creation and Shore Protection/Commercial Canal Freshwater Redirection 2000 Iberia
LA-03b Coastwide Nutria Control Program 2002 East Baton Rouge
CS-29 Black Bayou Culverts Hydrologic Restoration 2000 Cameron
CS-27 Black Bayou Hydrologic Restoration 1997 Cameron
CS-09 Brown Lake Hydrologic Restoration 1992 Cameron
CS-17 Cameron Creole Plugs 1991 Cameron
ME-09 Cameron Prairie National Wildlife Refuge Shoreline Protection 1991 Cameron
CS-49 Cameron-Creole Freshwater Introduction 2009 Cameron
CS-04a Cameron-Creole Maintenance 1993 Cameron
LA-03b Coastwide Nutria Control Program 2002 Cameron
CS-26 Compost Demonstration (Deauthorized) 1994 Cameron
CS-20 East Mud Lake Marsh Management 1992 Cameron
CS-32 East Sabine Lake Hydrologic Restoration 2001 Cameron
ME-16 Freshwater Introduction South of Highway 82 2000 Cameron
ME-21b Grand Lake Shoreline Protection, O&M Only [CIAP] 2002 Cameron
ME-21a Grand Lake Shoreline Protection, Tebo Point 2002 Cameron
ME-19 Grand-White Lakes Landbridge Protection 2001 Cameron
CS-21 Highway 384 Hydrologic Restoration 1992 Cameron
CS-31 Holly Beach Sand Management 2002 Cameron
ME-11 Humble Canal Hydrologic Restoration 1999 Cameron
ME-17 Little Pecan Bayou Hydrologic Restoration 2000 Cameron
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Cameron
CS-25 Plowed Terraces Demonstration 1994 Cameron
CS-23 Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully 1993 Cameron
ME-18 Rockefeller Refuge Gulf Shoreline Stabilization 2001 Cameron
CS-18 Sabine National Wildlife Refuge Erosion Protection 1991 Cameron
CS-28-1 Sabine Refuge Marsh Creation Cycle 1 1999 Cameron
CS-28-3 Sabine Refuge Marsh Creation Cycle 3 1999 Cameron
CS-28-2 Sabine Refuge Marsh Creation, Cycle 2 1999 Cameron
CS-28-4 Sabine Refuge Marsh Creation, Cycle 4 1999 Cameron
CS-28-5 Sabine Refuge Marsh Creation, Cycle 5 1999 Cameron
ME-20 South Grand Chenier Hydrologic Restoration Project 2002 Cameron
ME-24 Southwest LA Gulf Shoreline Nourishment and Protection 2007 Cameron
CS-11b Sweet Lake/Willow Lake Hydrologic Restoration 1996 Cameron
CS-19 West Hackberry Vegetative Planting Demonstration 1991 Cameron
CS-27 Black Bayou Hydrologic Restoration 1997 Calcasieu
CS-09 Brown Lake Hydrologic Restoration 1992 Calcasieu
CS-22 Clear Marais Bank Protection 1992 Calcasieu
LA-03b Coastwide Nutria Control Program 2002 Calcasieu
CS-30 GIWW - Perry Ridge West Bank Stabilization 2000 Calcasieu
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Calcasieu
CS-24 Perry Ridge Shore Protection 1994 Calcasieu
LA-03b Coastwide Nutria Control Program 2002 Assumption
BA-25b Mississippi River Reintroduction Into Bayou Lafourche 1996 Assumption
LA-03a Nutria Harvest for Wetland Restoration Demonstration 1997 Assumption
LA-03b Coastwide Nutria Control Program 2002 Ascension
BA-25b Mississippi River Reintroduction Into Bayou Lafourche 1996 Ascension
PO-29 River Reintroduction into Maurepas Swamp 2002 Ascension
LA-03b Coastwide Nutria Control Program 2002 Acadia

PPL stands for "Priority Project List"

Project names use the following abreviations to indicate the location:

AT Atchafalaya Basin
BA Barataria Basin
BS Breton Sound Basin
CS Calcasieu / Sabine Basin
LA Coastal Lousiana
ME Mermentau Basin
MR Mississippi River Delta Basin
PO Lake Pontchartrain Basin
TE Terrebonne Basin Basin
TV Teche / Vermilion Basin