CWPPRA

PPL 22 Candidate Voting Results - Technical Committee

At the April 19, 2012 CWPPRA Technical Committee meeting, 10 projects and 4 demonstration projects were selected as Priority Project List (PPL) 22 candidates to be evaluated for Phase 0 analysis, which will be considered later for final selection of projects that will be approved for Phase I (Planning and Engineering and Design). Typically 3 demonstrations projects are selected, but after continuous tied votes for the demonstrations projects, the Technical Committee decided to move all 4 demonstration projects forward.

Projects moving forward are highlighted in blue below.

CWPPRA PPL 22 Candidate Vote - Technical Committee

Region
Basin
Type
Project
COE
EPA
FWS
NMFS
NRCS
STATE
No. of Votes
Sum of Point Score
2
BA
MC
Bayou Dupont Sediment Delivery -- Marsh Creation 3
 
10
5
1
8
10
5
34
3
TE
MC
North Catfish Lake Marsh Creation
7
 
7
9
9
2
5
34
4
ME
FD/TR
Front Ridge Freshwater Introduction & Terracing
3
2
 
2
10
7
5
24
2
BS
TR/MC
Terracing & Marsh Creation South of Big Mar
 
 
9
6
6
6
4
27
2
BA
BI
Elmer's Island Restoration
2
 
4
10
 
8
4
24
3
TE
FD/TR
Grand Bayou Freshwater Enhancement/ Introduction & Terraces
 
4
8
4
 
4
4
20
4
CS
MC
Cameron Meadows Marsh Creation & Nourishment
 
 
2
8
4
3
4
17
3
TV
TR/VP
South Vermilion Bay Terracing & Planting
 
3
 
3
2
1
4
9
2
BS
MC/TR
Lake Lery Marsh Creation & Terracing
4
 
10
7
 
 
3
21
2
BA
MC/SP
Northeast Turtle Bay Marsh Creation & Critical Area Shoreline Protection
8
 
6
 
7
 
3
21
3
TV
FD/SP
Cote Blanche Freshwater & Sediment Introduction & Shoreline Protection
10
 
1
 
5
 
3
16
1
PO
MC
Triangle-Restoring Cypress-Tupelo Swamp & Marsh
1
9
 
 
 
5
3
15
4
ME
MC
East Pecan Island Marsh Creation -- Increment 1
 
8
 
 
 
9
2
17
1
PO
MC/SP
New Orleans Landbridge Shoreline Stabilization & Marsh Creation
9
 
3
 
 
 
2
12
4
CS
MC
West Cove Marsh Creation & Nourishment
6
5
 
 
 
 
2
11
1
PO
HR
Small Mississippi River Reintroduction into LaBranche Wetlands
 
7
 
 
3
 
2
10
3
TE
MC
Lake Tambour Marsh Creation
5
 
 
 
 
 
1
5
2
MR
FD/MC
Pass a Loutre Crevasse
 
1
 
 
 
 
1
1
3
AT
FD
West Wax Lake Wetlands Diversion
 
 
 
 
1
 
1
1
2
MR
HR
Pass a Loutre Hydrologic Restoration
 
 
 
 
 
 
0
0
4
CW
MC
Coastwide Competitive Voluntary Canal Backfiling
 
6
 
5
 
 
2
11

CWPPRA PPL 22 Demonstration Candidate Vote - Technical Committee

Project
COE
EPA
FWS
NMFS
NRCS
STATE
No. of Votes
Sum of Point Score
CREPS: Coastal Restoration & Energy Production System
 
1
1
1
3
3
5
9
Bioengineering of Shorelines & Canal Banks using Live Stakes
1
2
2
 
1
1
5
7
Hay Bale Demo
3
 
3
2
2
 
4
10
Reconnection of Hydrologically Isolated Wetlands
2
3
 
3
 
2
4
10

NOTES:
- Projects are sorted by: (1) "No. of Votes" and (2) "Sum of Point Score"

###


See what's new on the CWPPRA Web site! Visit LaCoast.gov

Tell Us What you Think

We welcome your comments! Contact us at lacoast@nwrccom.cr.usgs.gov

Spread the Word

Tell your friends they can receive this free newsflash by subscribing at:
http://www.lacoast.gov/news/newsletter.htm

For More Program Information:

Subscribe to WaterMarks, the CWPPRA magazine, by contacting lacoast@nwrccom.cr.usgs.gov
To view on-line issues visit
http://www.lacoast.gov/WaterMarks

CWPPRA Managing Agencies:

Other Related Coastal Restoration Web Sites:


 

Unsubscribe

This newsflash has been sent to you because you are either a participant in our program or you have provided your e-mail address to us in a request to receive it. If you prefer not to receive this newsflash, you can unsubscribe by sending an email to:
ListServer@nwrccom.cr.usgs.gov.
with "unsubscribe cwppra" as the subject without the quotation marks.