Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-23) Overview

Priority Project List: 3

Sponsors: USFWS, LDNR

Parishes: Cameron

Reports:
CS-23 General Project Fact Sheet (PDF 1.90 MB)
CS-23 General Project Fact Sheet - High Quality (PDF 20.0 MB)
CS-23 Monitoring Plan (PDF 717 KB)
CS-23 2004 Operations, Maintenance, and Monitoring Report (PDF 5.03 MB)
CS-23 2005 Operations, Maintenance, and Monitoring Report (PDF 4.87 MB)
CS-23 Summary Data and Graphics (PDF 4.15 MB)
CS-23 Project Completion Report (PDF 177 KB)
CS-23 2005/2006 Annual Inspection Report (PDF 1.20 MB)
CS-23 2006/2007 Annual Inspection Report (PDF 567 KB)
CS-23 Project Managers' Technical Fact Sheet (HTML)

Maps:
Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-23) 2000 Land-Water Analysis
(PDF 15.5 MB)
Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-23) 2000 Land-Water Analysis
(PDF 6.91 MB)
CS-23 2000 Photomosaic 8.5x11
(PDF 8.27 MB)

Data:
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 Mosaic
The Replace Hog Island Gully, West Cove and Headquarters Canal Structures (CS-23) 2000 Land/Water

Wetland Value Assessment:
Project Area (acres): 42247
Average Annual Habitat Units*: 491
   
Acres Created / Restored: 367
Acres Protected: 586
Total Net Acres: 953
* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.