North Lake Mechant Landbridge Restoration (TE-44) Overview
Priority Project List: 10
Parishes: Terrebonne
Reports:
TE-44 General Project Fact Sheet (PDF 4.06 MB)
TE-44 General Project Fact Sheet - High Quality (PDF 12.0 MB)
TE-44 2004 Operations, Maintenance, and Monitoring Report (PDF 825 KB)
TE-44 Monitoring Report (PDF 2.28 MB)
TE-44 Construction Unit 1 Ecological Review (PDF 3.50 MB)
TE-44 Ecological Review (PDF 746 KB)
TE-44 Construction Unit 2 Ecological Review (PDF 746 KB)
TE-44 Project Managers' Technical Fact Sheet (HTML)
TE-44 General Project Fact Sheet (PDF 4.06 MB)
TE-44 General Project Fact Sheet - High Quality (PDF 12.0 MB)
TE-44 2004 Operations, Maintenance, and Monitoring Report (PDF 825 KB)
TE-44 Monitoring Report (PDF 2.28 MB)
TE-44 Construction Unit 1 Ecological Review (PDF 3.50 MB)
TE-44 Ecological Review (PDF 746 KB)
TE-44 Construction Unit 2 Ecological Review (PDF 746 KB)
TE-44 Project Managers' Technical Fact Sheet (HTML)
Maps:
| North Lake Mechant Landbridge Restoration (TE-44) 2002 Land-Water Analysis (PDF 34.0 MB) |
|
| North Lake Mechant Landbridge Restoration (TE-44) 2002 Land-Water Analysis Poster Map (36x30) (PDF 299 MB) |
| Project Area (acres): | 7571 |
| Average Annual Habitat Units*: | 367 |
| Acres Created / Restored: | 408 |
| Acres Protected: | 196 |
| Total Net Acres: | 604 |
*
Habitat Units represent a numerical combination of
habitat quality (Habitat Suitability Index) and habitat quantity (acres)
within a given area at a given point in time. Average Annual Habitat Units
represent the average number of Habitat Units within any given year over
the project life for a given area.

