MRGO - Background Info
•  1956: Approved by Congress
•  1958-65: Construction $92 Million
•  Authorized dimensions:
–  650’ surface width,  500’ bottom width
–  36’ depth
–  76 miles
•  311 million yd3 of dredged volume