PROJECT STATUS REPORT as of 22-Nov-2024
PROJECT DATA
PROJECT: Bayou Boeuf Pump Station DEAUTHORIZED |
PRIORITY LIST: 6 | PROJECT NO: 0669 | CWPPRA NO: XTE-32i | DNR NO: TE-33 |
PROJECT TYPE: Hydrologic Restoration | NET ACRES BENEFITTED: |
REGION: 3 | BASIN: Terrebonne | PARISH: St. Martin |
LEAD AGENCY: EPA |
LOCAL SPONSOR: DEPT. OF NATURAL RESOURCES, STATE OF LA |
MILESTONES:
CSA EXECUTION: | ||||
DESIGN COMPLETION: | ||||
CONSTRUCTION START: | ||||
CONSTRUCTION COMPLETION: | ||||
ESCROW AMENDMENT | No: | |||
MONITORING PLAN APPROVAL: | ||||
O and M PLAN APPROVAL: | ||||
DEAUTHORIZATION DATE: | 23-Jul-1998 | |||
CASH FLOW PROECTS: | ||||
Phase 1 Approval: | 24-Apr-1997 | ( Actual ) | ||
Phase 2 Approval: |
LEGISLATIVE DISTRICTS:
CONGRESSIONAL DISTRICT: | 6 | William Cassidy |
STATE SENATE DISTRICT: | 17 | Rick Ward III |
STATE HOUSE DISTRICT: | 51 | Joe Harrison |
Point of Contact:
ENVIRONMENTAL PROTECTION AGENCY
REGION 6
Karen McCormick EPA R6 (WQ-EC) 1445 Ross Avenue Dallas, TX 75202-2733 |
|
PROJECT STATUS REPORT as of 22-Nov-2024
Bayou Boeuf Pump Station DEAUTHORIZED
PROJECT LOCATION:
The project is located in Bayou Boeuf at Amelia, LA.
PROJECT DESCRIPTION:
The project does not include design or construction/maintenance, etc. This project was verbally redefined at a meeting during the week of April 21, 1997 between EPA, COE and LA DNR and Mr. Martin Cancienne, to include project scoping/coordination, ecological characterization, and related activities leading to a determination of restoration/enchancement/maintenance needs which could be formulated into alternative recommendations for design features. These recommendations would be made available to the Corps for use in its eventual construction/operation of the Bayou Boeuf and related pump station(s) connected to flood protection activities under the WRDA. Part of the purpose of this project is to link the wetlands protection/restoration objectives of the Breaux Act with flood protection and navigation needs generally covered by WRDA. The project should provide a linkage between the lower Atchafalaya Re-evaluation Study and CWPPRA. The project components consists of implementing long term water management strategy for Verret Basin, and evaluate long term river water delivery strategy from Atchafalaya to Terrebonne Wetlands.
PROJECT STATUS: (Project Status Last Updated: 01-Jan-1990 )
This was a 3-phased project. Priority List 6 authorized funding of $150,000; Priority List 7 was scheduled to fund $250,000; and Priority List 8 was scheduled to fund $100,000. Total project cost was estimated to be $500,000. By letter dated November 18, 1997, EPA notified the Technical Committee that they and LA DNR agree to deauthorize the project. Deauthorization was approved at the July 23, 1998 Task Force meeting.
FUND STATUS:
The current project estimate is $3,452 , which includes $3,452 for construction first costs, and $0 and $0 for 20 years of monitoring and operations and maintenance, respectively.
LaCoast.gov | Project Managers' Technical Factsheet |