TABLE 15
CWPPRA restoration projects in the Barataria Basin.
Restoration Objectives |
||||||||
Projects |
Sponsor |
Project Type |
restore Fluvial Inputs |
Prevent Barrier Island Erosion |
Restore Hydrology |
Reduce Salinity Stress |
Prevent Shore Erosion |
Create Wetlands |
GIWW to Clovelly (BA-2) |
NRCS |
HR |
||||||
Naomi Outfall Management (BA-3C) |
NRCS |
OM |
||||||
West Point A La Hache Outfall Mgmt. (BA-4C) |
NRCS |
OM |
||||||
Lake Salvador Shore Protection Demonstration (BA-15) |
NMFS |
SP |
||||||
Barataria Bay Waterway Marsh Creation (BA-19) |
USACE |
MC |
||||||
Bayou Lafourche Siphon Phase I (PBA-20) |
EPA |
FD |
||||||
Jonathan Davis Wetland Protection (PBA-35) |
NRCS |
HR |
||||||
Bayou Perot/Bayou Rigolets Marsh Restoration (XBA-65A)* |
NMFS |
MC |
||||||
Bayou LšOurs Ridge Hydrologic Restoration (PBA-34) |
NRCS |
HR |
||||||
Barataria Waterway West Side Shore Protection (PBA-12) |
NRCS |
SP |
||||||
Myrtle Grove Siphon (PBA-48A) |
NMFS |
SD |
||||||
Fourchon Hydrologic Restoration (BA-18) |
NMFS |
HR |