Anticipated benefits and costs of CWPPRA restoration projects in the Barataria Basin.
Projects |
Total Created / Restored & Protected (acres) |
Total Fully funded Cost Estimate |
GIWW to Clovelly (BA-2) |
8,629 |
$8,174,525 |
Naomi Outfall Management (BA-3C) |
633 |
$1,686,865 |
West Pointe A La Hache Outfall Management (BA-4C) |
1,087 |
$894,137 |
Lake Salvador Shore Protection Demonstration (BA-15) |
* |
$1,457,637 |
Barataria Bay Waterway Marsh Creation (BA-19) |
445 |
$1,639,537 |
Bayou Lafourche Siphon Phase I (PBA-20)*** |
428 |
$1,000,000 |
Jonathan Davis Wetland Protection (PBA-35) |
510 |
$3,418,802 |
Bayou Perot/Bayou Rigolets Marsh Restoration (XBA-65A) |
1,065** |
$1,848,037 |
Bayou LšOurs Ridge Hydrologic Restoration (PBA-34) |
737 |
$589,871 |
Barataria Waterway West Side Shore Protection (PBA-12) |
232 |
$2,192,418 |
Myrtle Grove Siphon (PBA-48A)**** |
1,119 |
$4,500,000 |
Fourchon Hydrologic Restoration (BA-18)***** |
N/A |
$6,999 |
Barataria Basin Total |
14,885 |
$27,408,828 |
* Acreage not calculated for CWPPRA demonstration projects.
** Anticipated benefits will be revised pending re-allocation of CWPPRA funds for project as originally designed.
*** Cost estimate is based on the PPLV engineering and design phase of the project. Benefits are based on all project phases with a total fully funded cost of $24,487,337.
**** Cost estimate is based on the PPLV engineering and design phase of the project. Benefits are based on all project phases with a total fully funded cost of $15,526,000.
***** Project deauthorized. Cost estimates reflect final expenditures.