Anticipated benefits and costs of CWPPRA restoration projects in the Barataria Basin.

Projects

Total Created / Restored & Protected (acres)

Total Fully funded Cost Estimate

GIWW to Clovelly (BA-2)

8,629

$8,174,525

Naomi Outfall Management (BA-3C)

633

$1,686,865

West Pointe A La Hache Outfall Management (BA-4C)

1,087

$894,137

Lake Salvador Shore Protection Demonstration (BA-15)

*

$1,457,637

Barataria Bay Waterway Marsh Creation (BA-19)

445

$1,639,537

Bayou Lafourche Siphon Phase I (PBA-20)***

428

$1,000,000

Jonathan Davis Wetland Protection (PBA-35)

510

$3,418,802

Bayou Perot/Bayou Rigolets Marsh Restoration (XBA-65A)

1,065**

$1,848,037

Bayou LšOurs Ridge Hydrologic Restoration (PBA-34)

737

$589,871

Barataria Waterway West Side Shore Protection (PBA-12)

232

$2,192,418

Myrtle Grove Siphon (PBA-48A)****

1,119

$4,500,000

Fourchon Hydrologic Restoration (BA-18)*****

N/A

$6,999

Barataria Basin Total

14,885

$27,408,828

* Acreage not calculated for CWPPRA demonstration projects.

** Anticipated benefits will be revised pending re-allocation of CWPPRA funds for project as originally designed.

*** Cost estimate is based on the PPLV engineering and design phase of the project. Benefits are based on all project phases with a total fully funded cost of $24,487,337.

**** Cost estimate is based on the PPLV engineering and design phase of the project. Benefits are based on all project phases with a total fully funded cost of $15,526,000.

***** Project deauthorized. Cost estimates reflect final expenditures.