CWPPRA restoration projects in the Terrebonne Basin.
Restoration Objectives |
||||||
Projects |
Sponsor |
Project Type |
Better Utilize Atchafalaya Flow |
Prevent Barrier Island Erosion |
Restore Interior Marsh Hydrology |
Create, Restore, and Protect Localized Regions |
Grand Bayou/GIWW Freshwater Diversion (XTE-49) |
USFWS |
FD |
||||
Falgout Canal Plantings Demonstration (TE-17) |
NRCS |
VP |
||||
Timbalier Island Plantings Demonstration (TE-18) |
NRCS |
VP |
||||
Eastern Isles Dernieres Restoration Phase 0 (TE-20) |
EPA |
BI |
||||
Point Au Fer Canal Plugs (PTE-22/24) |
NMFS |
SP |
||||
West Bell Pass Headland (PTE-27) |
USACE |
DM |
||||
Eastern Isles Dernieres Phase 1 (XTE-41/PTE-15A) |
EPA |
BI |
||||
East Timbalier Island Restoration (XTE-67) |
NMFS |
BI |
||||
Lake Chapeau Marsh Creation (PTE-23/26A/33) |
NMFS |
HR |
||||
Whiskey Island Restoration (PTE-15Bi) |
EPA |
BI |
||||
Brady Canal Hydrologic Restoration (PTE-26B) |
NRCS |
HR |
||||
Raccoon Island Breakwaters Demonstration (PTE-15) |
NRCS |
BI |
||||
East Timbalier Sediment Restoration (XTE-45/67B) |
NMFS |
BI |
||||
Flotant Marsh Fencing Demonstration (XTE-54B) |
NRCS |
SP |
FD = freshwater diversion
VP = vegetative planting
BI = barrier island restoration