TABLE 18

CWPPRA restoration projects in the Terrebonne Basin.

Restoration Objectives

Projects

Sponsor

Project Type

Better Utilize Atchafalaya Flow

Prevent Barrier Island Erosion

Restore Interior Marsh Hydrology

Create, Restore, and Protect Localized Regions

Grand Bayou/GIWW Freshwater Diversion (XTE-49)

USFWS

FD

check

check

Falgout Canal Plantings Demonstration (TE-17)

NRCS

VP

check

Timbalier Island Plantings Demonstration (TE-18)

NRCS

VP

check

Eastern Isles Dernieres Restoration Phase 0 (TE-20)

EPA

BI

check

Point Au Fer Canal Plugs (PTE-22/24)

NMFS

SP

check

West Bell Pass Headland (PTE-27)

USACE

DM

check

Eastern Isles Dernieres Phase 1 (XTE-41/PTE-15A)

EPA

BI

check

East Timbalier Island Restoration (XTE-67)

NMFS

BI

check

Lake Chapeau Marsh Creation (PTE-23/26A/33)

NMFS

HR

check

check

Whiskey Island Restoration (PTE-15Bi)

EPA

BI

check

Brady Canal Hydrologic Restoration (PTE-26B)

NRCS

HR

check

Raccoon Island Breakwaters Demonstration (PTE-15)

NRCS

BI

check

East Timbalier Sediment Restoration (XTE-45/67B)

NMFS

BI

check

Flotant Marsh Fencing Demonstration (XTE-54B)

NRCS

SP

check

FD = freshwater diversion
VP = vegetative planting
BI = barrier island restoration