TABLE 18
CWPPRA restoration projects in the Terrebonne Basin.
Restoration Objectives |
||||||
Projects |
Sponsor |
Project Type |
Better Utilize Atchafalaya Flow |
Prevent Barrier Island Erosion |
Restore Interior Marsh Hydrology |
Create, Restore, and Protect Localized Regions |
Grand Bayou/GIWW Freshwater Diversion (XTE-49) |
USFWS |
FD |
|
|
||
Falgout Canal Plantings Demonstration (TE-17) |
NRCS |
VP |
|
|||
Timbalier Island Plantings Demonstration (TE-18) |
NRCS |
VP |
|
|||
Eastern Isles Dernieres Restoration Phase 0 (TE-20) |
EPA |
BI |
|
|||
Point Au Fer Canal Plugs (PTE-22/24) |
NMFS |
SP |
|
|||
West Bell Pass Headland (PTE-27) |
USACE |
DM |
|
|||
Eastern Isles Dernieres Phase 1 (XTE-41/PTE-15A) |
EPA |
BI |
|
|||
East Timbalier Island Restoration (XTE-67) |
NMFS |
BI |
|
|||
Lake Chapeau Marsh Creation (PTE-23/26A/33) |
NMFS |
HR |
|
|
||
Whiskey Island Restoration (PTE-15Bi) |
EPA |
BI |
|
|||
Brady Canal Hydrologic Restoration (PTE-26B) |
NRCS |
HR |
|
|||
Raccoon Island Breakwaters Demonstration (PTE-15) |
NRCS |
BI |
|
|||
East Timbalier Sediment Restoration (XTE-45/67B) |
NMFS |
BI |
|
|||
Flotant Marsh Fencing Demonstration (XTE-54B) |
NRCS |
SP |
|
FD = freshwater diversion
VP = vegetative planting
BI = barrier island restoration