TABLE 21

CWPPRA restoration projects in the Teche/Vermilion Basin.

Restoration Objectives

Projects

Sponsor

Project Type

Maximize Atchafalaya Input and Flooding Regions

Address Critical Shoreline Breakup and Retreat

Address Marsh Loss "Hot Spots"

Minimize "Moderate" Shoreline Erosion

Create Marsh

Vermilion River Cutoff (FTV-3)

USACE

SP

check

Boston Canal/Vermilion Bay (PTV-18)

NRCS

SP/ST/VP

check

Cote Blanche Hydrologic Restoration (TV-4)

NRCS

SP/HR

check

check

Little Vermilion Bay Sediment Trapping (PTV-19)

NMFS

ST

check

check

SP = shoreline protection
ST = sediment trapping