TABLE 21
CWPPRA restoration projects in the Teche/Vermilion Basin.
Restoration Objectives |
|||||||
Projects |
Sponsor |
Project Type |
Maximize Atchafalaya Input and Flooding Regions |
Address Critical Shoreline Breakup and Retreat |
Address Marsh Loss "Hot Spots" |
Minimize "Moderate" Shoreline Erosion |
Create Marsh |
Vermilion River Cutoff (FTV-3) |
USACE |
SP |
|||||
Boston Canal/Vermilion Bay (PTV-18) |
NRCS |
SP/ST/VP |
|||||
Cote Blanche Hydrologic Restoration (TV-4) |
NRCS |
SP/HR |
|||||
Little Vermilion Bay Sediment Trapping (PTV-19) |
NMFS |
ST |
SP = shoreline protection
ST = sediment trapping