TABLE 27
CWPPRA restoration projects in the Calcasieu/Sabine Basin.
Restoration Objectives |
||||||
Projects |
Sponsor |
Project Type |
Reduce Saltwater From Canals, Channels, & Gulf |
Prevent Shore or Bank Erosion |
Prevent Erosion of Interior Marsh |
Create Marsh |
Cameron-Creole Maintenance (C/S-4A) |
NRCS |
HR |
||||
Brown Lake (C/S-9) |
NRCS |
MM |
||||
Sweet Lake/Willow Lake Hydrologic Restoration (C/S-11B) |
NRCS |
HR |
||||
Cameron-Creole Watershed (FCS-17) |
USFWS |
HR |
||||
Sabine Refuge Erosion Protection (FCS-18) |
USFWS |
SP |
||||
West Hackberry Plantings Demonstration (FCS-19) |
NRCS |
VP |
||||
East Mud Lake (PCS-24) |
NRCS |
MM |
||||
Highway 384 (PCS-25) |
NRCS |
MM |
||||
Clear Marais (PCS-27) |
USACE |
SP |
||||
Replace Hog Island, W. Cove Control Structure (XCS-47/48i) |
USFWS |
MM |
||||
Perry Ridge Shore Protection (PCS-26i) |
NRCS |
SP |
||||
Plowed Terraces Demonstration (XCS-56) |
NRCS |
MC |
||||
Compost Demonstration (XCS-36) |
EPA |
MC |
HR = hydrologic restoration
MM = marsh management
SP = shoreline protection