TABLE 29
Anticipated benefits and costs of CWPPRA restoration projects in the Calcasieu/Sabine Basin.
Projects |
Total Created / Restored & Protected (acres) |
Total Fully funded Cost Estimate |
Cameron-Creole Maintenance (C/S-4A) |
2,602 |
$3,729,926 |
Brown Lake (C/S-9) |
282 |
$3,236,971 |
Sweet Lake/Willow Lake Hydrologic Restoration (C/S-11B) |
247 |
**$2,299,769 |
Cameron-Creole Watershed (FCS-17) |
600 |
$754,646 |
Sabine Refuge Erosion Protection (FCS-18) |
5,542 |
$1,847,666 |
West Hackberry Plantings Demonstration (FCS-19) |
* |
$211,099 |
East Mud Lake (PCS-24) |
1,520 |
$2,925,580 |
Highway 384 (PCS-25) |
150 |
$714,771 |
Clear Marais (PCS-27) |
1,067 |
$3,687,824 |
Replace Hog Island, W. Cove Control Structure (XCS-47/48i) |
953 |
$4,605,297 |
Perry Ridge Shore Protection (PCS-26i) |
1,203 |
$2,223,518 |
Plowed Terraces Demonstration (XCS-56) |
* |
$299,690 |
Compost Demonstration (XCS-36) |
* |
$380,594 |
Calcasieu/Sabine Basin Total |
14,166 |
$26,917,351 |
* Acreage not calculated for CWPPRA demonstration projects.
** Cost estimate based on the PPLV phase of project. Benefits based on all project phases with a total fully funded cost of $4,763,000.