TABLE 29

Anticipated benefits and costs of CWPPRA restoration projects in the Calcasieu/Sabine Basin.

Projects

Total Created / Restored & Protected (acres)

Total Fully funded Cost Estimate

Cameron-Creole Maintenance (C/S-4A)

2,602

$3,729,926

Brown Lake (C/S-9)

282

$3,236,971

Sweet Lake/Willow Lake Hydrologic Restoration (C/S-11B)

247

**$2,299,769

Cameron-Creole Watershed (FCS-17)

600

$754,646

Sabine Refuge Erosion Protection (FCS-18)

5,542

$1,847,666

West Hackberry Plantings Demonstration (FCS-19)

*

$211,099

East Mud Lake (PCS-24)

1,520

$2,925,580

Highway 384 (PCS-25)

150

$714,771

Clear Marais (PCS-27)

1,067

$3,687,824

Replace Hog Island, W. Cove Control Structure (XCS-47/48i)

953

$4,605,297

Perry Ridge Shore Protection (PCS-26i)

1,203

$2,223,518

Plowed Terraces Demonstration (XCS-56)

*

$299,690

Compost Demonstration (XCS-36)

*

$380,594

Calcasieu/Sabine Basin Total

14,166

$26,917,351

* Acreage not calculated for CWPPRA demonstration projects.

** Cost estimate based on the PPLV phase of project. Benefits based on all project phases with a total fully funded cost of $4,763,000.