Caminada Headlands Back Barrier Marsh Creation (BA-171)
Priority Project List: 23
Sponsors: CPRA, EPA
Parishes: Lafourche
Reports
Monitoring Plan for Caminada Headland Back Barrier Marsh Restoration (BA-0171)PDF1.1 MB
Caminada Headland Back Barrier Marsh Creation (BA-171) Final Fact SheetPDF1.1 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF5.8 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF33.7 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF9.2 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF12.3 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF2.0 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF61.8 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF5.6 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF7.2 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF4.7 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF1.3 MB
Project Completion Report Caminada Headland Back Barrier Marsh Creation Project (BA-0171)PDF4.4 MB
Caminada Headland Back Barrier Marsh Creation Project 95% Design ReportPDF2.2 MB
Appendix C: Geotechnical Investigation Data Report Caminada Headlands Back Barrier Marsh Creation ProjectPDF31.7 MB
Coastal Protection and Restoration Authority Quarterly Progress Report May 2020PDF3.1 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF718.4 KB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF295.6 KB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF3.1 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF6.7 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF11.9 MB
Caminada Headlands Back Barrier Marsh Creation BA-0171 Bid PackagePDF19.9 MB
BA-171 Landrights DocumentsPDF306.9 KB
BA-171 Landrights DocumentsPDF11.8 MB
BA-171 Landrights DocumentsPDF2.9 MB
BA-171 Landrights DocumentsPDF2.4 MB
BA-171 Landrights DocumentsPDF2.6 MB
BA-171 Landrights DocumentsPDF14.1 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF1.4 MB
BA-171 Landrights DocumentsPDF446.1 KB
BA-171 Landrights DocumentsPDF7.4 MB
BA-171 Landrights DocumentsPDF
BA-171 Landrights DocumentsPDF5.5 MB
BA-171 Landrights DocumentsPDF1.7 MB
BA-171 Annex B Monument Data SheetPDF139.8 KB
BA-171 Final Permit Mod 9-26-2019PDF
BA-171 Coastal Use PermitPDF49.3 KB
BA-171 Final Permit 6-18-19PDF1.5 MB
BA-171 Water Quality CertificationPDF306.7 KB
Draft Design Report Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193)PDF7.1 MB
BA-171 Bid Package Environmental DocumentsPDF4.6 MB
Geotechnical Engineering Report Caminada Headlands Back Barrier Marsh Creation Increment I (BA-171) Marsh Fill Settlement Re-EvaluationPDF2.3 MB
Final Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-0193)PDF
Final Geotechnical Data Report Field and Laboratory Data Collection Phase Caminada Headlands Back Barrier Marsh Creation Increment II (BA-193) Offshore Borrow InvestigationPDF
Survey Methodology Report Topographic and Magnetometer Surveys of the Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193)PDF
Caminada Headlands Back Barrier Marsh Creation Increment II Project (BA-193) Topographic, Bathymetric, and Magnetometer Surveys February - April 2017PDF15.9 MB
Section 4 Survey DrawingsPDF
Annex C NomogramPDF146.2 KB
Section 3 Survey Point DataPDF1.6 MB
Section 2 Survey Field NotesPDF
Caminada Headlands Back Barrier Marsh Creation Project (BA-171) 2015 Methodology ReportPDF297.9 KB
Annex A CPRA Maps and Scope of Services for Topographic, Bathymetric, Magnetometer, and Geophysical Surveys for Caminada Headlands Back Barrier Marsh Creation Project (BA-171)PDF3.6 MB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB
Map
There are no maps associated with this project
Data
There is no data associated with this project
Wetland Value Assessment
  • Project Area (acres): 928
  • Average Annual Habitat Units*: 269
  • Acres Created / Restored: 379
  • Acres Protected: 0
  • Total Net Acres: 379

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

About This Site

The Louisiana Coastal Wetlands Planning Protection and Restoration Act Program web site contains information and links relating to coastal restoration projects in coastal Louisiana. This site is funded by CWPPRA and is maintained by the USGS National Wetlands Research Center.