River Reintroduction Into Maurepas Swamp (Transferred) (PO-29)
Priority Project List: 11
Sponsors: CPRA, EPA
Parishes: Ascension, St. James, St. John the Baptist
Reports
Hydraulic and Water Quality Modeling of Proposed River Reintroduction into Maurepas Swamp (PO-0029)PDF11.4 MB
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029)PDF387.5 KB
Water Quality Modeling of Proposed River Reintroduction Into Maurepas Swamp (PO-0029)PDF6.3 MB
Swamp Community Wetland Value Assessment. PO-0029 River Reintroduction into Maurepas Swamp.PDF9.3 MB
River Reintroduction Into Maurepas Swamp (PO-0029). Draft Environmental Information Document.PDF
Topographic Survey in the Outfall Management Area of the Mississippi River Reintroduction into the Maurepas Swamp (PO-29) St. John the Baptist and St. James Parish, LouisianaPDF
River Reintroduction into Maurepas Swamp Project (PO-0029) Preliminary Operations, Maintenance, Monitoring, and Adaptive Management PlanPDF1.3 MB
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, LouisianaPDF9.1 MB
River Reintroduction into Maurepas Swamp (PO-0029) Project OverviewPDF773.3 KB
River Reintroduction into Maurepas Swamp Frequently Asked QuestionsPDF255.0 KB
River Reintroduction into Maurepas Swamp Public Meeting March 26, 2018PDF6.4 MB
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project UpdatePDF8.8 MB
Governor's Advisory Commission Diversion Sub-Committee October 3, 2017 River Reintroduction Into Maurepas SwampPDF4.8 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design ReportPDF4.8 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural CalculationsPDF7.5 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural CalculationsPDF13.5 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural CalculationsPDF
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural CalculationsPDF33.0 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent PlansPDF4.5 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent PlansPDF
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent PlansPDF2.5 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent PlansPDF1.1 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent PlansPDF3.2 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF887.9 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF1.8 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF3.7 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF3.7 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF5.5 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF9.7 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF2.8 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF2.0 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF2.1 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF1.2 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF4.9 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design ReportPDF2.8 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix B Percent SpecificationsPDF4.3 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As BuiltsPDF971.2 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As BuiltsPDF645.2 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix G Mech. Sluice Gate CalculationsPDF34.4 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix F 95 Percent Cost Estimate Back UpPDF5.0 MB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF95.9 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF95.5 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF97.4 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF92.8 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF94.9 KB
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River HydrographsPDF77.3 KB
Performance measures for a Mississippi River reintroduction into the forested wetlands of Maurepas SwampPDF4.9 MB
PO-29 Assessment of an Alternative Siphon System Intake - FiguresPDF2.8 MB
PO-29 Assessment of an Alternative Siphon System IntakePDF1.0 MB
PO-29 Hydraulic Feasibility Study - 1 of 7PDF2.1 MB
PO-29 Hydraulic Feasibility Study - 2 of 7PDF5.8 MB
PO-29 Hydraulic Feasibility Study - 3 of 7PDF
PO-29 Hydraulic Feasibility Study - 4 of 7PDF31.4 MB
PO-29 Hydraulic Feasibility Study - 5 of 7PDF
PO-29 Hydraulic Feasibility Study - 6 of 7PDF4.5 MB
PO-29 Hydraulic Feasibility Study - 7 of 7PDF5.4 MB
PO-29 Ecosystem Health of the Maurepas Swamp: Feasibility and Projected Benefits of a Freshwater DiversionPDF1,017.6 KB
PO-29 Report on Maurepas Restoration Project - Report on Maurepas Restoration ProjectPDF1.6 MB
PO-29 Report on Maurepas Restoration Project - Attachment A - Draft Project Development Plan January 6, 2000PDF46.3 KB
PO-29 Report on Maurepas Restoration Project - Attachment B - Site mapsPDF622.6 KB
PO-29 Report on Maurepas Restoration Project - Attachment C Draft Hydrologic Modeling May 30, 2001PDF4.6 MB
PO-29 Report on Maurepas Restoration Project - Attachment D Cost EstimatesPDF41.8 KB
PO-29 Report on Maurepas Restoration Project - Attachment E Draft Swamp EcologyPDF341.6 KB
PO-29 Report on Maurepas Restoration Project - Attachment F Draft Water Quality AnalysisPDF2.2 MB
PO-29 Report on Maurepas Restoration Project - Attachment G WVA Revised Project Information Sheet May 2001PDF5.5 MB
PO-29 Report on Maurepas Restoration Project - Wetland Value Assessment Community ModelPDF3.9 MB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB
Data
There is no data associated with this project
Wetland Value Assessment
  • Project Area (acres): 36121
  • Average Annual Habitat Units*: 8486
  • Acres Created / Restored: 0
  • Acres Protected: 5438
  • Total Net Acres: 5438

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

About This Site

The Louisiana Coastal Wetlands Planning Protection and Restoration Act Program web site contains information and links relating to coastal restoration projects in coastal Louisiana. This site is funded by CWPPRA and is maintained by the USGS National Wetlands Research Center.