West Belle Pass Barrier Headland Restoration (TE-52)
Priority Project List: 16
Sponsors: COE, NMFS
Parishes: Lafourche
Reports
Louisiana Barrier Island Comprehensive Monitoring Program—Mapping habitats in beach, dune, and intertidal environments along the Louisiana Gulf of Mexico shoreline, 2008 and 2015–16: U.S. Geological Survey Open-File Report 2020–1030PDF12.4 MB
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic MapsPDF5.5 MB
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Methods and ResultsPDF4.4 MB
Louisiana Barrier Island Comprehensive Monitoring Program 2015-2019 Coastal Surface-Sediment Characterization Analysis: Regional Sediment Characteristic Change MapsPDF5.9 MB
2018 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52)PDF3.3 MB
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52)PDF
2014 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52)PDF5.3 MB
Operation, Maintenance and Rehabilitation Plan for the West Belle Pass Barrier Headland Restoration Project (TE-52)PDF
TE-52 Water Quality CertificationPDF31.2 KB
West Belle Pass Headland Restoration (TE-52): Phase I InvestigationsPDF996.8 KB
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015PDF43.0 MB
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in LouisianaPDF6.3 MB
State of the Coast 2018: Assessing the Western Caminada-Moreau Headland's Shoreline, Elevational, Vegetative, and Avian response to Beach, Dune and Marsh CreationPDF3.9 MB
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and ProductsPDF627.7 KB
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and ProductsPDF717.8 KB
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution MapsPDF1.5 MB
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Bid Tabulation SheetPDF819.6 KB
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid PackagePDF124.1 KB
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid PackagePDF832.8 KB
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid PackagePDF788.8 KB
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid PackagePDF2.3 MB
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52)PDF3.9 MB
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-0052)PDF10.7 MB
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change AssessmentPDF
State of Louisiana Coastal Protection and Restoration Authority Topographic and Bathymetric Survey of the West Belle Pass Barrier Headland Restoration (TE-0052) Project Lafourche Parish, LouisianaPDF10.2 MB
West Belle Pass Barrier Headland Restoration Vegetative PlantingPDF886.9 KB
2015 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-52)PDF7.7 MB
West Belle Pass Barrier Headland Restoration (TE-52) Project - Bathymetric and Topographic SurveyPDF33.5 MB
TE-52 2015 Operations, Maintenance, and Monitoring ReportPDF
TE-52 Environmental AssessmentPDF4.9 MB
TE-52 Project Completion ReportPDF378.0 KB
TE-52 Monitoring PlanPDF804.7 KB
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita PhotographyPDF4.2 MB
Project Manager's Technical Fact Sheet (HTML)html10.0 KB
Map
There are no maps associated with this project
Data
There is no data associated with this project
Wetland Value Assessment
  • Project Area (acres): 411
  • Average Annual Habitat Units*: 203
  • Acres Created / Restored: 291
  • Acres Protected: 14
  • Total Net Acres: 305

* Habitat Units represent a numerical combination of habitat quality (Habitat Suitability Index) and habitat quantity (acres) within a given area at a given point in time. Average Annual Habitat Units represent the average number of Habitat Units within any given year over the project life for a given area.

About This Site

The Louisiana Coastal Wetlands Planning Protection and Restoration Act Program web site contains information and links relating to coastal restoration projects in coastal Louisiana. This site is funded by CWPPRA and is maintained by the USGS National Wetlands Research Center.