Publications > Reports

CWPPRA Project Reports


Filter by:
Year:   Report Type:

ReportTypePublished
Cameron Creole Grand Bayou Marsh Creation (CS-54) CWPPRA Project FWS Construction Outreach Report (PDF)Project Report10/7/2019
PO-104 Bayou Bonfouca Marsh Creation FWS Cwppra Outreach Report (PDF)Project Report10/7/2019
TE-72 Lost Lake Marsh Creation and Hydrologic Restoration CWPPRA Project FWS Outreach Report (PDF)Project Report10/7/2019
BA-171 Finding of No Significant Impact and Final Supplement to the Environmental Assessment (PDF)Environmental Assessment8/26/2019
2019 Monitoring Plan for Cole's Bayou Marsh Restoration (PDF)OMM Plan8/1/2019
BA-171 Appendix A Combined (PDF)Environmental Assessment7/8/2019
BA-171 Appendix B Finding of No Significant Impact and Final Environmental Assessment (PDF)Environmental Assessment7/8/2019
BA-171 Final Supplement to the Environmental Assessment (PDF)Environmental Assessment6/5/2019
State of Louisiana Coastal Protection and Restoration Authority of Louisiana General: Quality Assurance Project Plan (QAPP) (PDF)General Programmatic Document6/1/2019
BS-38 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BS-38 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
BS-37 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BS-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
BA-217 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
BA-217 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
CS-85 General Project Fact Sheet (PDF)General Project Fact Sheet5/9/2019
CS-85 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/9/2019
2019 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report5/7/2019
2019 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report5/7/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
Brady Canal Hydrologic Restoration - 2018 Maintenance Event Bid Document (PDF)BID DOCUMENTS4/16/2019
2019 Operations, Maintenance, and Monitoring Final Report for Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (PDF)OM&M Report4/1/2019
2018 Operations, Maintenance and Monitoring Report for Barataria Barrier Island Comples: Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF)OM&M Report4/1/2019
2019 Annual Inspection Report for Jonathan Davis Wetland Restoration Project (PDF)Inspection Report3/26/2019
Borrow Area Geotechnical Services. West Fourchon Marsh Creation and Nourishment Project (TE-134). Lafourche Parish, Louisiana. (PDF)GEOTECHNICAL REPORT3/13/2019
2018 Operations, Maintenance, and Monitoring Close-out Report for Brady Canal Hydrologic Restoration (TE-28) (PDF)OM&M Report3/1/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
Coastal Protection and Restoration Authority Board Meeting FY19 2nd Quarter Report/2018 Year In Review (PowerPoint Presentation)MEETING PRESENTATIONS AND MINUTES1/16/2019
Operation, Maintenance and Rehabilitation Plan for the Penchant Basin Natural Resource Plan, Increment 1 Project (TE-34) (PDF)OMM Plan1/8/2019
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Bayou Dupont Marsh and Ridge Creation - Vegetative Plantings Project (BA-0048) (PDF)BID DOCUMENTS12/19/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
Northwest Turtle Bay Marsh Creation Project Bid Package (PDF)BID DOCUMENTS12/14/2018
2018 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF)OM&M Report12/1/2018
2018 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report11/19/2018
2018 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF)OM&M Report11/1/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Tabulation Sheet (PDF)BID DOCUMENTS10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Coastal Protection and Restoration Authority Board Meeting October 24, 2018, Southwest Louisiana Regional Update (PDF)MEETING PRESENTATIONS AND MINUTES10/24/2018
Project Completion Report: Lake Chapeau Sediment Input and Hydrologic Restoration (TE-26) (PDF)Project Completion Report10/1/2018
2018 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report9/25/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) Final Maintenance Bid Package (PDF)BID DOCUMENTS9/20/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Project Completion Report: Sign and Timber Pile Cap Replacement Project (PDF)Project Completion Report9/10/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
Oaks/Avery Hydrologic Restoration, Increment 1; Rock Maintenance (PDF)BID DOCUMENTS9/5/2018
TE-117 Borrow Area and Access Corridor Deliverable (Borrow Area Geophysical Survey) (PDF)SURVEY REPORT9/1/2018
Lake Chapeau (TE-26) 2018 Maintenance Project As-Built Drawings (PDF)AS-BUILT8/21/2018
Island Road Marsh Creation and Nourishment (TE-117) Phase II Final Geotechnical Engineering Report (Supplementary Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT8/17/2018
2018 Annual Inspection Report North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report8/8/2018
2018 Operations, Maintenance, and Monitoring Close-Out Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF)OM&M Report8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 – Updated Shoreline Compilation and Change Assessment, 1880s to 2015 (PDF)CONTRACTED STUDY8/1/2018
Topographic Survey in the Outfall Management Area of the Mississippi River Reintroduction into the Maurepas Swamp (PO-29) St. John the Baptist and St. James Parish, Louisiana (PDF)SURVEY REPORT7/18/2018
Project Completion Report for Hydrologic Restoration and Vegetative Plantings in the Des Allemands Swamp (BA-34-2) (PDF)Project Completion Report7/12/2018
Little Lake BA-37 As-Built Drawings (Revised Perpendicular Rock Dike Alignment) (PDF)AS-BUILT7/2/2018
Project Completion Report for Little Lake Shoreline Protection and Marsh Creation Segment 1 & 2 Demolition and Perpendicular Rock Dike Construction (PDF)Project Completion Report7/1/2018
Project Completion Report: Raccoon Island Breakwater Rehabilitation Project (TE-48) (PDF)Project Completion Report7/1/2018
2018 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Non-rock Alternatives to Shoreline Protection Demonstration Project (PDF)OM&M Report6/27/2018
East Mud Lake Hydrologic Restoration Project (CS-0020) - Final Maintenance - Bid Tabulation Sheet (PDF)BID DOCUMENTS6/21/2018
Lake Chapeau Sediment Input and Hydrologic Restoration (TE-0026) 2018 Maintenance Event Bid Tabulation Sheet (PDF)BID DOCUMENTS6/7/2018
State of the Coast 2018: Assessing the Western Caminada-Moreau Headland's Shoreline, Elevational, Vegetative, and Avian response to Beach, Dune and Marsh Creation (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
State of the Coast 2018: Lessons Learned from Two Decades of Barrier Island Restoration in Louisiana (PDF)MEETING PRESENTATION6/1/2018
2018 Operations, Maintenance, and Monitoring Report for Holly Beach Sand Management (CS-0031) (PDF)OM&M Report6/1/2018
2018 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration (PDF)OM&M Report6/1/2018
2018 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF)OM&M Report6/1/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Pontchartrain and Brenton Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: Overview of Coastal Protection and Restoration in the Mermentau and Calcasieu/Sabine Basins, Louisiana (PDF)MEETING PRESENTATION5/31/2018
State of the Coast 2018: NFWF Projects and Path Forward (PDF)MEETING PRESENTATION5/30/2018
Wave Monitoring Data Processing and Calculation of Wave Transmission Coefficients (PDF)DATA COLLECTION5/22/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) Bid Tabulation (PDF)BID DOCUMENTS5/17/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
East Mud Lake Hydrologic Restoration Project (CS-0200) Final Maintenance - Bid Package (PDF)BID DOCUMENTS5/10/2018
TE-48 Raccoon Island Breakwater Rehabilitation As-Built Drawings (PDF)AS-BUILT5/8/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Tabulation (PDF)BID DOCUMENTS5/3/2018
BA-206 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
CS-81 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
BS-32 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
PO-181 General Project Fact Sheet (PDF)General Project Fact Sheet5/1/2018
BA-206 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
CS-81 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
BS-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
PO-181 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/1/2018
Raccoon Island Maintenance/Construction Feature Removal Project (TE-48) Project Completion Report (PDF)Project Completion Report5/1/2018
Island Road (TE-117) Geotechnical Investigation Data Report Addendum 1 (Borrow Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT4/24/2018
TE-48 Raccoon Island Feature Removal As-Built Drawings (PDF)AS-BUILT4/17/2018
Mandatory Pre -Bid Conference for the Cole’s Bayou Marsh Restoration Project (TV-0063) (PDF)MEETING PRESENTATION4/12/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Bayou Bonfouca Marsh Creation - Vegetative Plantings Project (PO-0104) (PDF)BID DOCUMENTS4/11/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
Cole's Bayou Marsh Restoration (TV-0063) Survey Data (PDF)SURVEY REPORT4/6/2018
2018 Operations, Maintenance, and Monitoring Closeout Report for Atchafalaya Sediment Delivery (AT-02) (PDF)OM&M Report4/1/2018
2018 Operations, Maintenance, and Monitoring Closeout Report for Big Island Mining (AT-03) (PDF)OM&M Report4/1/2018
River Reintroduction into Maurepas Swamp Public Meeting March 26, 2018 (PDF)MEETING PRESENTATION3/26/2018
River Reintroduction into Maurepas Swamp Frequently Asked Questions (PDF)General Programmatic Document3/26/2018
River Reintroduction into Maurepas Swamp (PO-0029) Project Overview (PDF)General Programmatic Document3/26/2018
2017 Annual Inspection Report for Barataria Barrier Island Complex Project: Pelican Island and Pass La Mer to Chaland Pass Restoration (PDF)Inspection Report3/23/2018
2017 Annual Inspection Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (PDF)Inspection Report3/23/2018
2017 Annual Inspection Report for Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)Inspection Report3/22/2018
2017 Annual Inspection Report for Bayou Sauvage Refuge Restoration Phase I (PDF)Inspection Report3/21/2018
2017 Annual Inspection Report for Grand Liard Marsh and Ridge Restoration (BA-68) (PDF)Inspection Report3/21/2018
2017 Annual Inspection Report for Lake Borgne Shoreline Protection Project (PDF)Inspection Report3/21/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Cole's Bayou Marsh Restoration Project (TV-0063) Bid Package (PDF)BID DOCUMENTS3/20/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
Little Lake Shoreline Protection & Marsh Creation – Segment 1&2 Demolition & Perpendicular Rock Dike Construction Project (BA-0037) Bid Package (PDF)BID DOCUMENTS3/15/2018
2017 Annual Inspection Report for Hopedale Hydrologic Restoration (PDF)Inspection Report3/14/2018
2017 Annual Inspection Report for Jonathan Davis Wetland Protection (PDF)Inspection Report3/12/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Project Bid Package (PDF)BID DOCUMENTS3/6/2018
West Belle Pass Barrier Headland Restoration Project – 2018 Maintenance Event Bid Tabulation Sheet (PDF)BID DOCUMENTS3/6/2018
Survey Report BA-0038-1 Pelican Island (PDF)SURVEY REPORT2/28/2018
Survey Report BA-0076 NRDA Chenier Ronquille (PDF)SURVEY REPORT2/28/2018
Survey Report BA-0040 Scofield Island (PDF)REFERENCE LITERATURE2/28/2018
A Standard Operating Procedures Manual for The Coastwide Reference Monitoring System-Wetlands: Methods for Site Establishment, Data Collection, and Quality Assurance/Quality Control. (PDF)General Programmatic Document2/21/2018
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp As Built (PDF)AS-BUILT2/18/2018
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp Project (BA-34-2) As-Built Survey Report (PDF)AS-BUILT2/5/2018
Monitoring Plan for Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing (BA-0164) (PDF)OMM Plan2/1/2018
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS1/10/2018
Project Completion Report for the GIWW to Clovelly Restoration (BA-02) 2015 Maintenance Project (PDF)Project Completion Report1/5/2018
2017 Operations, Maintenance, and Monitoring Report for Channel Armor Gap Crevasse (MR-06) (PDF)OM&M Report1/1/2018
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF)CONTRACTED STUDY1/1/2018
Final Report Senate Resolution No. 154 of the 2017 Regular Session (PDF)CONTRACTED STUDY1/1/2018
2017 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report12/4/2017
Coastal Protection and Restoration Authority of Louisiana (CPRA) 2017 Operations, Maintenance, and Monitoring Report: Final Closeout Report for Bio-engineered Oyster Reef Demonstration Project (LA-0008) (PDF)OM&M Report12/1/2017
2017 Operations, Maintenance, and Monitoring Report for Dedicated Dredging on the Barataria Basin Landbridge (BA-36) (PDF)OM&M Report12/1/2017
2017 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 2 (PO-18) (PDF)OM&M Report12/1/2017
2017 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF)Inspection Report11/15/2017
Operation, Maintenance and Rehabilitation Plan for the New Cut Dune and Marsh Restoration Project (TE-37) (PDF)OMM Plan11/14/2017
Operation, Maintenance and Rehabilitation Plan for the Whiskey Island Back Barrier Island Marsh Creation Project (TE-50) (PDF)OMM Plan11/13/2017
2017 Annual Inspection Report for Fritchie Marsh Restoration (PDF)Inspection Report11/9/2017
2017 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report11/9/2017
2017 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF)Inspection Report11/7/2017
2017 Annual Inspection Report for Barataria Bay Waterway West Shoreline Protection (PDF)Inspection Report11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
TV-63 Cole's Bayou Marsh Restoration Project. Coastal Wetland Planning, Protection, and Restoration Act PPL 21. Final (95%) Design Report. (PDF)DESIGN REPORT11/7/2017
2017 Annual Inspection Report for Caernarvon Outfall Management (BS-03a) (PDF)Inspection Report11/1/2017
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report10/31/2017
2017 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging near Round Lake (BA-37) (PDF)Inspection Report10/31/2017
2017 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report10/31/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Coastal Protection and Restoration Authority Board Meeting October 18, 2017 Southeast Louisiana Project Update (PDF)MEETING PRESENTATION10/18/2017
Governor's Advisory Commission Diversion Sub-Committee October 3, 2017 River Reintroduction Into Maurepas Swamp (PDF)MEETING PRESENTATION10/3/2017
2017 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (PDF)OM&M Report10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS10/1/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
2017 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3, & 4 (Construction Units 1, 2, 3, 4, 5, 6, 7, & 8) (PDF)Inspection Report9/7/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF)OM&M Report9/1/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for Coastwide Vegetative Planting Project (LA-0039) (PDF)OM&M Report9/1/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part B – Sediment Sample Distribution Maps (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2015 Characterization of Surficial Sediments in the Early Lafourche Delta, Late Lafourche Delta, Modern Delta, and Chandeleur Islands Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM) Phase 2 - 2016 Characterization of Surficial Sediments in the Western and Eastern Chenier Plain and Atchafalaya and Wax Lake Delta Regions: Part A - Data Collection, Sample Processing and Products (PDF)DATA COLLECTION8/18/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
Coastal Protection and Restoration Authority Board Meeting, August 17, 2017 South Central and South West Louisiana Regional Update (PDF)MEETING PRESENTATION8/16/2017
2017 Annual Inspection Report for Mississippi Sediment Delivery System - Bayou Dupont (PDF)Inspection Report8/8/2017
Coastal Protection and Restoration Authority of Louisiana 2017 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-0052) (PDF)OM&M Report8/1/2017
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Bayou Dupont Marsh and Ridge Creation (BA-0048) (PDF)OMM Plan8/1/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
Coastal Protection and Restoration Authority Board Meeting Coastal Protection and Restoration Authority Construction Update July 19, 2017 (PDF)MEETING PRESENTATION7/19/2017
2017 Annual Inspection Report for GIWW Bank Restoration Project - Segment 4 (TE-43) (PDF)Inspection Report7/13/2017
2017 Annual Inspection Report for Penchant Basin Natural Resource Plan, Increment No. 1 (TE-34) (PDF)Inspection Report7/12/2017
2017 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF)Inspection Report7/12/2017
Oyster Bayou Handout (PDF)FACT SHEET7/12/2017
2017 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report7/11/2017
Decommission of Data Collection Platforms for LA-0016 Non-Rock Alternatives Shoreline Protection Demonstration Project (PDF)General Programmatic Document7/1/2017
2016 Operations, Maintenance, and Monitoring Report for West Bay Sediment Diversion (MR-03) (PDF)OM&M Report7/1/2017
2016/2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-2) Permanent Pipeline (PDF)Inspection Report6/15/2017
2016-2017 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-28-4&5) (PDF)Inspection Report6/15/2017
CS-66 Environmental Assessment 2017 (PDF)Environmental Assessment6/7/2017
Performance measures for a Mississippi River reintroduction into the forested wetlands of Maurepas Swamp (PDF)CONTRACTED STUDY6/1/2017
2016/2017 Annual Inspection Report for East Marsh Island Marsh Creation Project (TV-21) (PDF)Inspection Report5/16/2017
Monitoring Plan for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF)OMM Plan5/8/2017
Coastal Protection and Restoration Authority 2017 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (BA-0002) (PDF)Inspection Report5/1/2017
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF)DATA COLLECTION4/4/2017
(TE-43) Bank Restoration of Critical Areas - Segment No. 4, (EB-10) GIWW Breach Closure Project - Segment No. 6, and (TE-34) Penchant Basin Natural Resource Plan - Increment 1 Data Collection Report (PDF)DATA COLLECTION4/4/2017
2016/2017 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project (CS-21) (PDF)Inspection Report3/23/2017
2015 Annual Inspection Report for Delta Wide Crevasses (MR-0009) (PDF)Inspection Report3/21/2017
State of Louisiana Coastal Protection and Restoration Authority Topographic and Bathymetric Survey of the West Belle Pass Barrier Headland Restoration (TE-0052) Project Lafourche Parish, Louisiana (PDF)SURVEY REPORT3/9/2017
2016/2017 Annual Inspection Report for Black Bayou Culverts Hydrologic Restoration Project (CS-29) (PDF)Inspection Report3/7/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
Louisiana Barrier Island Comprehensive Monitoring Program (BICM): Phase 2 - Shoreline Compilation and Change Assessment (PDF)CONTRACTED STUDY2/28/2017
LA-284 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
LA-284 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
PO-179 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
PO-179 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
PO-178 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
PO-178 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
TE-138 General Project Fact Sheet (PDF)General Project Fact Sheet2/21/2017
TE-138 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/21/2017
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BA-35) (PDF)OM&M Report2/1/2017
Island Road Marsh Creation/Nourishment (TE-117) Geotechnical Investigation Data Report (Supplementary Marsh Creation Area Phase II Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT2/1/2017
BA-37 Survey Data - Bathymetric Data (PDF)SURVEY REPORT1/19/2017
Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana (PDF)SURVEY REPORT1/19/2017
West Belle Pass Barrier Headland Restoration Vegetative Planting (PDF)BID DOCUMENTS1/19/2017
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Grand Liard Marsh and Ridge Restoration Project Completion Report (PDF)Project Completion Report12/23/2016
Little Lake Shoreline Protection/Dedicataed Dredging Near Round Lake Project BA-37 Lafourche Parish, Louisiana Marsh Creation Area Grid Survey & Rock Dike Jetty Creation Survey (PDF)SURVEY REPORT12/14/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System-Bayou Dupont (BA-0039) (PDF)OM&M Report12/1/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Bayou Sauvage National Wildlife Refuge Hydrologic Restoration, Phase 1 (PO-16) (PDF)OM&M Report11/1/2016
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Notice of Award (PDF)BID DOCUMENTS11/1/2016
PO-104 Bayou Bounfouca Aerial Photos (PDF)DESIGN REPORT10/19/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Tabulation Sheet (PDF)BID DOCUMENTS10/13/2016
Bayou Dupont Sediment Delivery Marsh Creation #3 and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS10/6/2016
Northwest Turtle Bay Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/1/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Cameron Creole Levee Lakeshore Protection Project Maintenance Bid Package (PDF)BID DOCUMENTS9/29/2016
Oyster Bayou Marsh Creation and Terracing Bid Tabulation Sheet (PDF)BID DOCUMENTS9/9/2016
2016 Annual Inspection Report for Delta Management at Fort St. Philip (BS-0011) (PDF)Inspection Report9/9/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Lost Lake Marsh Creation and Hydrologic Restoration Bid Package (PDF)BID DOCUMENTS9/7/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Coastal Protection and Restoration Authority Board Meeting August 31, 2016 Southwest Louisiana Regional Update (PDF)MEETING PRESENTATION8/31/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery - Marsh Creation #3 and Terracing Bid Package (PDF)BID DOCUMENTS8/30/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
Bayou Dupont Sediment Delivery Marsh Creation Fact Sheet (PDF)FACT SHEET8/1/2016
2016 Operations, Maintenance and Monitoring Report for Oaks/Avery Canals Hydrologic Restoration (PDF)OM&M Report8/1/2016
State of Louisiana Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Caernarvon Diversion Outfall Management (BS-03a) (PDF)OM&M Report7/28/2016
2016 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF)Inspection Report7/25/2016
PO-0104 Notice to Proceed (PDF)BID DOCUMENTS7/15/2016
2016/2017 Annual Inspection Report for East Sabine Lake Hydrologic Restoration Project (CS-32) (PDF)Inspection Report7/14/2016
2016 Annual Inspection Report for South Shore of the Pen Shoreline Protection and Marsh Creation (PDF)Inspection Report7/11/2016
Monitoring Plan for Hydrologic Restoration and Vegetative Planting in the Lac des Allemands Swamp (BA-34-2) (PDF)OMM Plan7/1/2016
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Lake Hermitage Marsh Creation (BA-42) (PDF)OMM Plan7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Bathymetric Survey Assessment for Louisiana Barrier Island Comprehensive Monitoring Program (BICMs) --- Raccoon Island to East Timbalier Island, Louisiana (PDF)SURVEY REPORT7/1/2016
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for Cameron - Creole Watershed Grand Bayou Marsh Creation (CS-0054) (PDF)OMM Plan7/1/2016
Coastwide Vegetative Planting - East Grand Terre Project -Addendum 1 (PDF)BID DOCUMENTS6/27/2016
PO-104 Bayou Bonfouca Notice of Award (PDF)BID DOCUMENTS6/27/2016
2015/2016 Annual Inspection Report for Sabine Refuge Marsh Creation Project (PDF)Inspection Report6/22/2016
2015/2016 Annual Inspection Report for Lake Portage Land Bridge Project (PDF)Inspection Report6/16/2016
2016 Annual Inspection Report for Barataria Bay Waterway East Shoreline Protection (PDF)Inspection Report6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
New Orleans Region Construction Projects, June 15, 2016 (PDF)MEETING PRESENTATION6/15/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project Phase 1, 2, 3 & 4 (Construction Units 1, 2, 3, 4, 5, and 6) (PDF)Inspection Report6/14/2016
2016 Annual Inspection Report for Naomi Outfall Management (PDF)Inspection Report6/9/2016
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)CONTRACTED STUDY6/3/2016
State of Louisiana Coastal Protection and Restoration Authority Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)CONTRACTED STUDY6/3/2016
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)SURVEY REPORT6/3/2016
Static Survey of AT02-SM-01 Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) St. Mary Parish, Louisiana (PDF)SURVEY REPORT6/3/2016
2016 Operations, Maintenance, and Monitoring Report for Humble Canal Hydrologic Restoration (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for GIWW - Perry Ridge West Bank Stabilization (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for Little Vermilion Bay Sediment Trapping (PDF)OM&M Report6/1/2016
2016 Operations, Maintenance, and Monitoring Report for West Belle Pass Headland Restoration (TE-23) (PDF)OM&M Report6/1/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Oyster Bayou Marsh Creation and Terracing Bid Package (PDF)BID DOCUMENTS5/26/2016
Bayou Bonfouca Marsh Creation Addendum 4 (PDF)BID DOCUMENTS5/23/2016
2016 Annual Inspection Report for Little Lake Shoreline Protection/ Dedicated Dredging Near Round Lake (BA-37) (PDF)Inspection Report5/19/2016
Bayou Bonfouca Marsh Creation Addendum 2 (PDF)BID DOCUMENTS5/17/2016
Bayou Bonfouca Marsh Creation Addendum 3 (PDF)BID DOCUMENTS5/16/2016
PO-0104 Pre-bid Attendance Record (PDF)BID DOCUMENTS5/16/2016
Bayou Bonfouca Marsh Creation Addendum 1 (PDF)BID DOCUMENTS5/13/2016
Black Bayou Culverts Bid Instructions (PDF)BID DOCUMENTS5/12/2016
Black Bayou Culverts Bid Terms and Conditions - Attachment A (PDF)BID DOCUMENTS5/12/2016
Black Bayou Culverts Hydrologic Restoration Bid Specifications - Attachment B (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
Lake Chapeau Sediment input and Hydrologic Restoration Project (TE-0026) - 2018 Maintenance Event Bid Package (PDF)BID DOCUMENTS5/8/2016
2015/2016 Annual Inspection Report for Sediment Trapping At The Jaws Project (PDF)Inspection Report5/5/2016
2016 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF)Inspection Report5/3/2016
2016 Annual Inspection Report for Goose Point/Point Platte Marsh Creation Project (PDF)Inspection Report4/28/2016
2016 Annual Inspection Report for South Lake Decade Freshwater Introduction Project (TE-39) (PDF)Inspection Report4/27/2016
Island Road Marsh Creation and Nourishment Project No. (TE-117) Data Collection Report (PDF)DATA COLLECTION4/27/2016
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF)Inspection Report4/26/2016
2016 Annual Inspection Report for Raccoon Island Shoreline Protection/ Marsh Creation Project and Raccoon Island Breakwater Demonstration Project (PDF)Inspection Report4/26/2016
2015/2016 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project (PDF)Inspection Report4/21/2016
2016 Annual Inspection Report for West Lake Boudreaux Shoreline Protection and Marsh Creation Project (TE-46) (PDF)Inspection Report4/15/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
GIWW To Clovelly Hydrologic Restoration 2015 Maintenance (BA-02) Bid Package (PDF)BID DOCUMENTS4/5/2016
Coastwide Vegetative Planting - East Grand Terre Project Plans (PDF)BID DOCUMENTS4/1/2016
Coastwide Vegetative Planting East Grant Terre Project Specifications (PDF)BID DOCUMENTS4/1/2016
2015/2016 Annual Inspection Report for Freshwater Bayou Wetlands Project (PDF)Inspection Report3/4/2016
Bayou Bonfouca Marsh Creation Plan Set with Seal (PDF)BID DOCUMENTS2/29/2016
Bayou Bonfouca Marsh Creation Bid Specifications with Seal (PDF)BID DOCUMENTS2/29/2016
Bayou Bonfouca Louisiana Uniform Public Work Bid Forms (PDF)BID DOCUMENTS2/29/2016
Island Road Marsh Creation and Nourishment Project (TE-117) Final Plan Set (PDF)DESIGN REPORT2/29/2016
Lost Lake Marsh Creation and Hydrologic Restoration Louisiana Department of Wildlife and Fisheries Fill Material License WLF201626 (PDF)PERMITS2/15/2016
South Grand Chenier Marsh Creation Design Report February 2016 (PDF)DESIGN REPORT2/1/2016
2016 Operations, Maintenance and Monitoring Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island GUlly (PDF)OM&M Report2/1/2016
Coastal Protection and Restoration Authority 2016 Operations, Maintenance, and Monitoring Report for Clear Marais Shoreline Protection (CS-0022) (PDF)OM&M Report2/1/2016
BA-37 Survey Report Segment 2 (PDF)SURVEY REPORT2/1/2016
BA-37 Survey Report Segment 1 (PDF)SURVEY REPORT2/1/2016
No Name Bayou Marsh Creation U S Army Corps of Engineers Permit MVN 2015-2171 WB (PDF)PERMITS1/21/2016
CONTROLS ON THE SUCCESSFUL USE OF DREDGED SEDIMENTS FOR THE RESTORATION AND REHABILITATION OF BRACKISH MARSHES ON THE BARATARIA BASIN LANDBRIDGE (PDF)CONTRACTED STUDY12/31/2015
2015/2016 Annual Inspection Report for Freshwater Introduction South of Highway 82 Project (PDF)Inspection Report11/5/2015
South Shore of the Pen Shoreline Protection and Marsh Creation Operation, Maintenance, and Rehabilitation Plan (PDF)OMM Plan11/4/2015
TE-28 2015 Annual Inspection Report (PDF)Inspection Report11/4/2015
Coastal Zone Consistency Soil Borings No Name Bayou Marsh Creation (PDF)PERMITS11/3/2015
2015 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-0045) (PDF)OM&M Report11/1/2015
Operation, Maintenance and Rehabilitation Plan for the GIWW Bank Restoration of Critical Areas - Segment No. 4 (TE-43) (PDF)OMM Plan11/1/2015
2015/2016 Annual Inspection Report for Cote Blanche Hydrologic Restoration Project (PDF)Inspection Report10/19/2015
Coastal Protection and Restoration Authority 2015 Short Summary Report for Highway 384 Hydrologic Restoration (CS-0021) (PDF)DATA COLLECTION10/15/2015
Bayou Bonfouca Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/15/2015
2015 Operations, Maintenance, and Monitoring Report for East Mud Lake Marsh Management CS-20 (PDF)OM&M Report10/1/2015
TE-48 and TE-29 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
TE-48 and TE-29 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
BA-37 2015 Annual Inspection Report (PDF)Inspection Report10/1/2015
CS-20 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2015
2015 Annual Inspection Report for Lake Chapeau Sediment Input and Hydrologic Restoration Project (PDF)Inspection Report9/28/2015
TE-43 2015 Annual Inspection Report (PDF)Inspection Report9/21/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
2015 Annual Inspection Report for Barataria Landbridge (PDF)Inspection Report9/10/2015
Coastal Protection and Restoration Authority of Louisiana Monitoring Plan for South Lake Lery Shoreline and Marsh Restoration BS-0016 (PDF)OMM Plan9/1/2015
TE-22 2015 Annual Inspection Report (PDF)Inspection Report8/28/2015
TE-34 2015 Annual Inspection Report (PDF)Inspection Report8/28/2015
BA-23 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
BA-26 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
BA-02 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
AT-02 2015 Inspection Report (PDF)Inspection Report8/24/2015
BA-03c 2015 Annual Inspection Report (PDF)Inspection Report8/24/2015
TV-17 2014/2015 Annual Inspection Report (PDF)Inspection Report8/20/2015
2014/2015 Annual Inspection Report for Lake Portage Land Bridge Project (TV-0017) (PDF)Inspection Report8/20/2015
2015 Operations, Maintenance, and Monitoring Report for Bayou Chevee Shoreline Protection (PO-22) (PDF)OM&M Report8/10/2015
TE-52 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2015
2015 Operations, Maintenance, and Monitoring Report for West Belle Pass Barrier Headland Restoration (TE-52) (PDF)OM&M Report8/1/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Royal Engineers (PDF)Project Completion Report7/27/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Jansen, Inc. (PDF)Project Completion Report7/27/2015
Non-Rock Alternatives to Shoreline Protection Demonstration Project Completion Report Living Shoreline Solutions, Inc. (PDF)Project Completion Report7/27/2015
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Engineering Services (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT7/17/2015
Island Road Marsh Creation and Nourishment (TE-117) Geotechnical Data Report (Exploratory Marsh Creation Area Geotechnical Investigation) (PDF)GEOTECHNICAL REPORT7/15/2015
2014/2015 Annual Inspection Report for Pecan Island Terracing Project (ME-0014) (PDF)Inspection Report6/30/2015
ME-14 2014/2015 Annual Inspection Report (PDF)Inspection Report6/30/2015
PO-06 2015 Annual Inspection Report (PDF)Inspection Report6/29/2015
TV-14 2014/2015 Annual Inspection Report Report (PDF)Inspection Report6/25/2015
2014/2015 Annual Inspection Report for Marsh Island Hydrologic Restoration Project (TV-0014) (PDF)Inspection Report6/25/2015
2014/2015 Annual Inspection Report for Four Mile Canal Terracing and Sediment Trapping Project TV-0018 (PDF)Inspection Report6/24/2015
TV-18 2014/2015 Annual Inspection Report (PDF)Inspection Report6/24/2015
CS-28-2 2014/2015 Annual Inspection Report (PDF)Inspection Report6/8/2015
2014/2015 Annual Inspection Report for Sabine Refuge Marsh Creation Project (CS-0028-2) (PDF)Inspection Report6/8/2015
BS-11 2015 Annual Inspection Report (PDF)Inspection Report6/2/2015
PO-33 2015 Annual Inspection Report (PDF)Inspection Report6/2/2015
CS-59 Environmental Assessment (PDF)Environmental Assessment6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Vermilion River Cutoff Bank Protection (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Black Bayou Hydrologic Restoration (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for East Sabine Lake Hydrologic Restoration (PDF)OM&M Report6/1/2015
2015 Operations, Maintenance, and Monitoring Report for Freshwater Introduction South of Highway 82 (PDF)OM&M Report6/1/2015
2015 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 4 and 5. (PDF)OMM Plan6/1/2015
GIWW to Clovelly Hydrologic Restoration 2015 Maintenance Project (PDF)AS-BUILT6/1/2015
2014/2015 Annual Inspection Report for Hwy 384 Hydrologic Restoration Project CS-0021 (PDF)Inspection Report5/11/2015
CS-21 2014/2015 Annual Inspection Report (PDF)Inspection Report5/11/2015
Raccoon Island Shoreline Protection/Marsh Creation (TE-48) Project, Terrebonne Parish, Louisiana Survey Report (PDF)SURVEY REPORT5/5/2015
ME-19 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
TV-03 2015 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2015
Bayou Bonfouca Marsh Creation Biological Evaluation (PDF)CONTRACTED STUDY5/1/2015
2014/2015 Annual Inspection Report for Sediment Trapping At The Jaws Project (TV-0015) (PDF)Inspection Report4/30/2015
TV-15 2014/2015 Annual Inspection Report (PDF)Inspection Report4/30/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
Cole's Bayou Marsh Restoration 30% Design Report (PDF)DESIGN REPORT4/29/2015
2016 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report4/20/2015
TE-44 2015 Annual Inspection Report (PDF)Inspection Report4/8/2015
2015 Monitoring Plan for Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration (BE-0035) (PDF)OMM Plan4/1/2015
2015 Monitoring Plan for Pelican Island and Pass La Mer to Chaland Pass Restoration (BA-0038) (PDF)OMM Plan4/1/2015
2014/2015 Annual Inspection Report for East Marsh Island Marsh Creation Project TV-0021 (PDF)Inspection Report3/30/2015
TV-21 2014/2015 Annual Inspection Report (PDF)Inspection Report3/30/2015
LA-09 Project Completion Report (PDF)Project Completion Report3/26/2015
West Belle Pass Barrier Headland Restoration (TE-52) Project - Bathymetric and Topographic Survey (PDF)SURVEY REPORT2/25/2015
Geotechnical Investigation Data Report PO-104 Bayou Bonfouca Marsh Creation Project Expanded Borrow Area Investigation (PDF)GEOTECHNICAL REPORT2/24/2015
Island Road Marsh Creation and Nourishment Permit MVN 2014-2677 WB (PDF)PERMITS1/23/2015
Survey Plan Methodology Report January 22, 2015 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Amendment 2 Vermilion Parish, La (PDF)SURVEY REPORT1/22/2015
2014/2015 Annual Inspection Report for Holly Beach Sand Management CS-0031 (PDF)Inspection Report12/12/2014
Island Road Marsh Creation and Nourishment Coastal Use Permit P20141474 (PDF)PERMITS12/5/2014
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Equipment Access, Pipeline Corridor, and Borrow Area, Vermilion Parish, Louisiana (PDF)SURVEY REPORT12/3/2014
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF)CONTRACTED STUDY12/2/2014
Cole's Bayou Marsh Hydrodynamic Modeling Report (PDF)CONTRACTED STUDY12/2/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
CS-28-1 CS-28-2 CS-28-3 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2014
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF)OM&M Report12/1/2014
2014 Operations, Maintenance, and Monitoring Report for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028) (CS-0028-1) (CS-0028-3) (PDF)OM&M Report12/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #2 (PDF)PERMITS11/24/2014
Grand Lake Shoreline Protection Tebo Point Water Quality Certification WQC 140602-01 (PDF)PERMITS11/21/2014
CS-31 2014/2015 Annual Inspection Report (PDF)Inspection Report11/12/2014
CS-23 2014/2015 Annual Inspection Report (PDF)Inspection Report11/12/2014
2014/2015 Annual Inspection Report for Replace Sabine Refuge Water Control Structures at Headquarters Canal, West Cove Canal, and Hog Island Gully (CS-0023) (PDF)Inspection Report11/12/2014
Joint Permit Application for Island Road Marsh Creation and Nourishment Exploratory Geotech at Fill Site (PDF)PERMITS11/6/2014
Island Road Marsh Creation and Nourishment CAD Package for Exploratory Geotech at Fill Site (PDF)PERMITS11/1/2014
Highway 384 Hydrologic Restoration Project Maintenance Event Bid Package (PDF)BID DOCUMENTS11/1/2014
GIWW Bank Restoration of Critical Areas in Terrebonne Project Completion Report (PDF)Project Completion Report10/17/2014
LA-08 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2014
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF)OMM Plan10/1/2014
2014 Monitoring Plan for Sabine Refuge Marsh Creation Cycles 1 and 3 (CS-0028-1), (CS-0028-3) (PDF)OMM Plan10/1/2014
2014 Operations, Maintenance, and Monitoring Report for Bioengineered Oyster Reef Demonstration Project (LA-08) (PDF)OM&M Report10/1/2014
2014 Operations, Maintenance, and Monitoring Report for Jonathan Davis Wetland Restoration (BA-20) (PDF)OM&M Report9/1/2014
2014 Operations, Maintenance, and Monitoring Report for Bayou LaBranche Wetland Creation (PO-17) (PDF)OM&M Report9/1/2014
BA-20 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
PO-24 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
PO-17 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2014
Operations, Maintenance, and Rehabilitation Plan for Oyster Bayou Marsh Restoration Project (CS-59) (PDF)OMM Plan9/1/2014
Bayou Bonfouca Borrow Area Survey (PDF)SURVEY REPORT8/8/2014
Final Design Report Cole's Bayou Marsh Restoration Project (TV-63) (PDF)GEOTECHNICAL REPORT8/4/2014
TE-26 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2014
PO-33 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/23/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #5 (07/21/2014) (PDF)PERMITS7/21/2014
PO-33 2014 Annual Inspection Report (PDF)Inspection Report7/16/2014
2014 Annal Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report7/11/2014
BA-48 Coastal Protection & Restoration Authority Quarterly Progress Report July 2014 (PDF)General Programmatic Document7/1/2014
Coastal Protection and Restoration Authority Whiskey Island Back Barrier Marsh Creation Project Final Report TE-50 (PDF)SURVEY REPORT6/20/2014
BS-11 Delta Management at Fort St. Philip (BS-11) 2014 Annual Inspection Report (PDF)Inspection Report6/17/2014
2014 Annual Inspection Report for West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)Inspection Report6/4/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #4 (06/03/2014) (PDF)PERMITS6/3/2014
CS-18 2014 Operations, Maintenance, and Monitoring and Final Close Out Report (PDF)OM&M Report6/1/2014
CS-24 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
ME-04 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
TV-04 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
TV-09 2014 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Freshwater Bayou Canal Wetland Protection (ME-0004) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Boston Canal/Vermilion Bay Shoreline Stabilization Project (TV-0009) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Perry Ridge Shore Protection (CS-0024) (PDF)OM&M Report6/1/2014
2014 Operations, Maintenance, and Monitoring Report for Marsh Island Hydrologic Restoration TV-0014 (PDF)OM&M Report6/1/2014
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2014 Post-Construction Survey;Monitoring Report (PDF)SURVEY REPORT6/1/2014
October 23, 2014 Task Force Meeting Funding Transfer Presentation ME-21 Grand Lake Shoreline Protection Project (PDF)MEETING PRESENTATION5/22/2014
Lost Lake Marsh Creation and Hydrologic Restoration Finding of No Significant Impact (PDF)Environmental Assessment5/6/2014
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment5/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment5/1/2014
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report (PDF)DESIGN REPORT5/1/2014
2014 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report4/28/2014
Grand Liard Marsh and Ridge Restoration Permit Modifications #3 (04/14/2014) (PDF)PERMITS4/14/2014
TV-21 Addendum 1 (PDF)BID DOCUMENTS4/4/2014
Shell Beach South Marsh Creation Plan View and Surveys (PDF)GEOTECHNICAL REPORT4/1/2014
TE-48 Phase B Project Completion Report (PDF)Project Completion Report3/31/2014
GIWW Bank Restoration of Critical Areas in Terrebonne As Built Plans (PDF)AS-BUILT3/26/2014
TV-21 Bid Documents (PDF)BID DOCUMENTS3/10/2014
2014 Annual Inspection Report for Terrebonne Bay Shore Protection Demonstration (PDF)Inspection Report3/1/2014
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP Modification #1 (PDF)PERMITS2/24/2014
BA-36 Monitoring Plan (PDF)OMM Plan2/1/2014
BA-68 Addendum 4 (PDF)BID DOCUMENTS1/27/2014
BA-68 Addendum 3 (PDF)BID DOCUMENTS1/15/2014
TV-03 Monitoring Plan (PDF)OMM Plan1/15/2014
TV-13a Monitoring Plan (PDF)OMM Plan1/15/2014
TE-43 Construction Update 1-25-2014 Photos (PDF)AS-BUILT1/15/2014
ME-19 Monitoring Plan (2014 Update) (PDF)OMM Plan1/14/2014
BA-68 Addendum 2 (PDF)BID DOCUMENTS1/8/2014
BA-40 Addendum 2 (PDF)BID DOCUMENTS1/7/2014
BA-40 Addendum 3 (PDF)BID DOCUMENTS1/7/2014
TV-12 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-11 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-14 Monitoring Plan (Update 2014) (PDF)OMM Plan1/2/2014
CS-27 Monitoring Plan (PDF)OMM Plan1/2/2014
ME-04 Monitoring Plan (PDF)OMM Plan1/2/2014
Operation, Maintenance and Rehabilitation Plan for the West Belle Pass Barrier Headland Restoration Project (TE-52) (PDF)OMM Plan1/1/2014
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF)DATA COLLECTION12/20/2013
Draft Data Report Field and Laboratory Data Collection Phase Cole's Bayou Marsh Restoration Project (TV-63) (PDF)DATA COLLECTION12/20/2013
BA-68 Addendum 1 (PDF)BID DOCUMENTS12/20/2013
TV-09 Monitoring Plan (PDF)OMM Plan12/19/2013
MR-09 Addendum 4 (PDF)BID DOCUMENTS12/16/2013
ME-16 Monitoring Plan (PDF)OMM Plan12/12/2013
TV-14 Monitoring Plan (PDF)OMM Plan12/12/2013
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF)OMM Plan12/12/2013
ME-09 Monitoring Plan (PDF)OMM Plan12/12/2013
CS-30 Monitoring Plan (PDF)OMM Plan12/12/2013
CS-24 Monitoring Plan (PDF)OMM Plan12/12/2013
Perry Ridge Shore Protection (CS-24) Monitoring Plan (PDF)OMM Plan12/12/2013
LA-16 Information Packet (PDF)Project Report12/11/2013
MR-09 Addendum 3 (PDF)BID DOCUMENTS12/5/2013
BA-40 Addendum 1 (PDF)BID DOCUMENTS12/3/2013
BA-02 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2013
2013 Operations, Maintenance, and Monitoring Report for GIWW (Gulf Intracoastal Waterway) to Clovelly Hydrologic Restoration (BA-02) (PDF)OM&M Report12/1/2013
2013 Operations, Maintenance, and Monitoring Report for West Lake Boudreaux Shoreline Protection and Marsh Creation (TE-46) (PDF)OM&M Report12/1/2013
BA-40 Bid Plans (PDF)BID DOCUMENTS11/26/2013
BA-40 Bid Specifications (PDF)BID DOCUMENTS11/26/2013
MR-09 Addendum 2 (PDF)BID DOCUMENTS11/26/2013
BA-76 Finding of No Significant Impact (PDF)Project Report11/26/2013
BA-76 Environmental Assessment (PDF)Environmental Assessment11/25/2013
BA-76 Environmental Assessment Appendix A (PDF)Environmental Assessment11/25/2013
Notice to Proceed for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation Project (BA-48) (PDF)BID DOCUMENTS11/25/2013
Signed Contract with Weeks Marine (PDF)BID DOCUMENTS11/22/2013
BA-68 Appendix B (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix E (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix F (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix G (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix H (PDF)BID DOCUMENTS11/19/2013
BA-68 Appendix I (PDF)BID DOCUMENTS11/19/2013
BA-68 Bid Plans (PDF)BID DOCUMENTS11/19/2013
BA-68 Bid Specifications (PDF)BID DOCUMENTS11/19/2013
MR-09 Addendum 1 (PDF)BID DOCUMENTS11/12/2013
MR-09 Bid Plans (PDF)BID DOCUMENTS11/5/2013
MR-09 Bid Specifications (PDF)BID DOCUMENTS11/5/2013
Original Bid - Recommendation of Award to Weeks Marine, Inc. (PDF)BID DOCUMENTS10/29/2013
Moffatt & Nichol Re-Bid Recommendation Letter (PDF)BID DOCUMENTS10/28/2013
Original Bid - Bid Tabulation Sheet for Mississippi River Long Distance Sediment Pipeline and Bayou Dupont Marsh and Ridge Creation (PDF)BID DOCUMENTS10/22/2013
Re-Bid Addendum No. 1 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS10/16/2013
Coastal Protection and Restoration Authority Project Completion Report for Brady Canal Hydrologic Restoration (TE-01) 2012 Maintenance Report (PDF)Project Completion Report10/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix D Structural Calculations (PDF)DESIGN REPORT9/25/2013
Labranche Central Marsh Creation U S Army Corps of Engineers Permit MVN2013-1950 EBB (PDF)PERMITS9/20/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix A Percent Plans (PDF)DESIGN REPORT9/18/2013
Lost Lake Marsh Creation and Hydrologic Restoration U S Army Corps of Engineers Permit MVN-2011-00954-WPP (PDF)PERMITS9/3/2013
CS-20 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix E MS River Hydrographs (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix F 95 Percent Cost Estimate Back Up (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix G Mech. Sluice Gate Calculations (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix H I-10 As Builts (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix B Percent Specifications (PDF)DESIGN REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
Mississippi River Reintroduction Into Maurepas Swamp 95% Design Report - Appendix C Geotechnical Design Report (PDF)GEOTECHNICAL REPORT9/1/2013
TE-52 Project Completion Report (PDF)Project Completion Report8/21/2013
Survey Plan Methodology Report August 21, 2013 State of Louisiana, Coastal Protection and Restoration Authority (CPRA) Cole's Bayou Marsh Restoration (TV-0063) Vermilion Parish, La (PDF)SURVEY REPORT8/21/2013
TE-45 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2013
2013 Operations, Maintenance, and Monitoring Report for Mississippi River Sediment Delivery System - Bayou Dupont (BA-39) (PDF)OM&M Report8/1/2013
2013 Operations, Maintenance, and Monitoring Report for Terrebonne Bay Shore Protection Demonstration (TE-45) (PDF)OM&M Report8/1/2013
Orginal Bid - Addendum No. 3 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/30/2013
Original Bid - Addendum No. 2 Plans and Constract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/19/2013
PO-104 Meeting Presentation (PDF)MEETING PRESENTATION7/17/2013
Geotechnical Data Report Bayou Bonfouca Borrow Area Sediment Sampling (PDF)GEOTECHNICAL REPORT7/16/2013
Original Bild - Addendum 01 to Plans and Contract Documents for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS7/12/2013
2013 Annual Inspection Report for North Lake Mechant Landbridge Restoration Project (TE-44) (PDF)Inspection Report7/10/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
2013 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1 and 2, 3 and 4) (PDF)OM&M Report7/2/2013
BA-39 Monitoring Plan (PDF)OMM Plan7/1/2013
TE-48 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2013
2013 Annual Inspection Report for Little Lake Shoreline Protection/Dedicated Dredging Near Round Lake (BA-37) (PDF)Inspection Report7/1/2013
State of Louisiana Coastal Protection and Restoration Authority Cole's Bayou Marsh Creation and Hydrological Restoration (TV-0063) Magnetometer Survey Marsh Creation and Borrow Areas, Vermilion Parish, Louisiana (PDF)SURVEY REPORT6/26/2013
BA-68 Appendix C (PDF)BID DOCUMENTS6/26/2013
TV-15 2012/2013 Annual Inspection Report (PDF)Inspection Report6/14/2013
CS-22 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-24 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-30 2012/2013 Annual Inspection Report (PDF)Inspection Report6/13/2013
CS-11b 2012/2013 Annual Inspection (PDF)Inspection Report6/12/2013
ME-09 2012/2013 Annual Inspection Report (PDF)Inspection Report6/12/2013
CS-31 2013 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2013
2013 Operations, Maintenance, and Monitoring Report for East Marsh Island Marsh Creation (TV-21) (PDF)OM&M Report6/1/2013
Non-Rock Alternatives To Shoreline Protection Demonstration Permit U S Army Corps of Engineers (PDF)PERMITS5/23/2013
TV-14 2012/2013 Annual Inspection Report (PDF)Inspection Report5/12/2013
2014 Annual Inspection Report for GIWW/Clovelly Hydrologic Restoration (PDF)Inspection Report5/6/2013
2013 Annual Inspection Report for Brady Canal Hydrologic Restoration Project (TE-28) (PDF)Inspection Report5/6/2013
Non-Rock Alternatives to Shoreline Protection Demonstration As Builts (PDF)AS-BUILT5/1/2013
TV-18 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
TV-03 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
TV-12 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
ME-14 2012/2013 Annual Inspection Report (PDF)Inspection Report4/17/2013
Lost Lake Marsh Creation and Hydrologic Restoration Department of Environmental Quality Water Quality Certification WQC 13031-01/AI 186530/CER 20130001 (PDF)PERMITS4/17/2013
Joint Public Notice (PDF)PERMITS4/15/2013
TV-14 2012/2013 Annual Inspection Report (PDF)Inspection Report3/26/2013
CS-27 2012/2013 Annual Inspection Report (PDF)Inspection Report3/20/2013
Grand Liard Marsh and Ridge Restoration Permit Modifications #2 (03/19/2013) (PDF)PERMITS3/19/2013
CS-21 2012/2013 Annual Inspection Report (PDF)Inspection Report3/7/2013
PO-33 Monitoring Plan (PDF)OMM Plan3/1/2013
2013 Operations, Maintenance and Monitoring Report for Humble Canal Hydrologic Restoration (ME-11) (PDF)OM&M Report3/1/2013
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS3/1/2013
Re-Bid - Bid Package Plans and Specifications for Mississippi River Long Distance Sediment Pipeline (BA-43 EB) and Bayou Dupont Marsh and Ridge Creation (BA-48) (PDF)BID DOCUMENTS3/1/2013
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Water Quality Certification WQC 121129-02?AI 185272/CER 20130001 (PDF)PERMITS2/28/2013
BA-164 General Project Fact Sheet (PDF)General Project Fact Sheet2/25/2013
BA-164 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/25/2013
CS-28-1 Meeting Presentation (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Southwest Louisiana Projects Update January 22, 2013 (PDF)MEETING PRESENTATION1/22/2013
Non-Rock Alternatives To Shoreline Protection Demonstration Coastal Use Permit, Coastal Zone Consistency (PDF)PERMITS1/17/2013
BA-68 Appendix A (PDF)BID DOCUMENTS1/4/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
Joint Permit Application and Amendments (PDF)PERMITS1/1/2013
TE-53 Final Report (PDF)EA or EIS and Ecological Review12/19/2012
TE-53 - Final Report (PDF)Project Report12/19/2012
AT-02 2012 Biennial Inspection Report (PDF)Inspection Report12/15/2012
AT-03 2012 Biennial Inspection Report (PDF)Inspection Report12/15/2012
ME-16 2012/2013 Annual Inspection Report (PDF)Inspection Report12/13/2012
CS-17 2012/2013 Annual Inspection Report (PDF)Inspection Report12/12/2012
TV-13A 2012/2013 Annual Inspection Report (PDF)Inspection Report12/11/2012
TE-46 2012 Monitoring Plan (PDF)OMM Plan12/1/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
Private Aids to Navigation Application (PDF)PERMITS11/29/2012
BS-11 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/12/2012
CS-32 2012/2013 Annual Inspection Report (PDF)Inspection Report10/11/2012
BA-27d 2012 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report10/10/2012
Operation, Maintenance, and Rehabilitation Plan for the BA-27d - Barataria Land Bridge Shoreline Protection Phase 4 (Construction Unit No. 6) (PDF)OMM Plan10/10/2012
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Report Project Completion Report (PDF)Project Completion Report10/5/2012
Lost Lake Marsh Creation and Hydrologic Restoration 95% Design Report (PDF)DESIGN REPORT10/1/2012
Notice to Proceed Racoon Island - Phase B (PDF)BID DOCUMENTS9/27/2012
TE-46 Operation, Maintenance, and Rehabilitation Plan (PDF)OMM Plan9/25/2012
BA-37 2012 Annual Inspection Report (PDF)Inspection Report9/5/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Bayou Bonfouca Marsh Creation Geotechnical Report (PDF)GEOTECHNICAL REPORT8/24/2012
Acceptance of Offer and Notice of Award (PDF)BID DOCUMENTS8/20/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B As-Builts (PDF)AS-BUILT8/12/2012
MR-06 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2012
West Lake Boudreaux Shoreline Protection and Marsh Creation As-Built (PDF)AS-BUILT7/27/2012
BA-39 Investigation of Potential Mississippi River Borrow Areas (PDF)Contract Studies/Data Collection Report7/24/2012
TE-48 Bids (PDF)BID DOCUMENTS7/23/2012
Penchant Basin Natural Resources Plan, Increment 1 Project Completion Report (PDF)Project Completion Report7/19/2012
TE-28 2012 Annual Inspection Report (PDF)Inspection Report7/15/2012
TE-44 2012 Annual Inspection Report (PDF)Inspection Report7/10/2012
CS-32 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-25 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2012
TE-26 2012 Annual Inspection Report (PDF)Inspection Report7/1/2012
Great Lak Dredge & Dock Plaquemines Parish Government Construction Permit (PDF)PERMITS7/1/2012
CS-20 2011/2012 Annual Inspection Report (PDF)Inspection Report6/29/2012
ME-22 2011/2012 Annual Inspection Report (PDF)Inspection Report6/19/2012
TE-22 2012 Annual Inspection Report (PDF)Inspection Report6/15/2012
ME-14 2011/2012 Annual Inspection Report (PDF)Inspection Report6/13/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase B Bid Package (PDF)BID DOCUMENTS6/8/2012
South Lake Decade Freshwater Introduction Project Completion Report (PDF)Project Completion Report6/5/2012
Lost Lake Marsh Creation and Hydrologic Restoration 30% Design Report (PDF)DESIGN REPORT6/1/2012
BA-68 Environmental Assessment (PDF)Environmental Assessment6/1/2012
TV-15 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-27 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
PO-06 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
ME-16 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
BA-37 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-22 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
CS-30 2012 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2012
TV-04 2011/2012 Annual Inspection Report (PDF)Inspection Report5/30/2012
TV-17 2011/2012 Annual Inspection Report (PDF)Inspection Report5/29/2012
CS-24 2011/2012 Annual Inspection Report (PDF)Inspection Report5/24/2012
ME-19 2011/2012 Annual Inspection Report (PDF)Inspection Report5/17/2012
TV-09 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
ME-04 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
ME-13 2011/2012 Annual Inspection Report (PDF)Inspection Report5/16/2012
BA-02 2012 Annual Inspection Report (PDF)Inspection Report5/14/2012
Lake Chapeau Sediment Input and Hydrologic Restoration, Point Au Fer Island (TE-26), Structure 3 Demolition Project Completion Report (PDF)Project Completion Report5/9/2012
LA-08 2012 Operations, Maintenance, and Monitoring Plan (PDF)OMM Plan5/7/2012
CS-32 Monitoring Plan 2012 (PDF)OMM Plan5/4/2012
TE-46 CU#2 Project Completion Report (PDF)Project Completion Report5/4/2012
TE-46 Project Completion Report (PDF)Project Completion Report5/3/2012
West Lake Boudreaux Shoreline Protection and Marsh Creation Project Completion Report (PDF)Project Completion Report5/3/2012
Brady Canal Hydrologic Restoration 2012 Maintenance Project (TE-28) Terrebonne Parish, Louisiana (PDF)AS-BUILT4/16/2012
TV-03 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
TV-18 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
TV-12 2011/2012 Annual Inspection Report (PDF)Inspection Report4/12/2012
Raccoon Island Shoreline Protection and Marsh Creation Phase A Project Completion Report (PDF)Project Completion Report4/9/2012
LA-08 Project Completion Report (PDF)Project Completion Report4/2/2012
Bayou Bonfouca Marsh Creation 30% Design Report (PDF)DESIGN REPORT4/1/2012
CS-11b 2011/2012 Annual Inspection Report (PDF)Inspection Report3/28/2012
ME-09 2011/2012 Annual Inspection Report (PDF)Inspection Report3/28/2012
TV-04 2012 Project Completion Report (PDF)Project Completion Report3/20/2012
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 Project Completion Report (BA-27) (PDF)Project Completion Report3/16/2012
TV-14 2011/2012 Annual Inspection Report (PDF)Inspection Report3/14/2012
TV-21 2011/2012 Annual Inspection Report (PDF)Inspection Report3/13/2012
DOTD Highway 23 Permit Extension (PDF)PERMITS3/13/2012
CS-59 General Project Fact Sheet (PDF)General Project Fact Sheet3/5/2012
CS-59 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/5/2012
TV-04 As-Built Drawings - Contruction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION3/2/2012
CS-23 2012 Monitoring Plan (PDF)OMM Plan3/1/2012
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF)BID DOCUMENTS2/29/2012
Raccoon Island Shoreline Protection and Marsh Creation Plans and Specs Phase B (PDF)BID DOCUMENTS2/29/2012
CS-21 2011/2012 Annual Inspection Report (PDF)Inspection Report2/23/2012
BA-30 Projects Under Construction Update February 15, 2012 (PDF)MEETING PRESENTATION2/15/2012
PO-133 General Project Fact Sheet (PDF)General Project Fact Sheet2/10/2012
PO-133 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/10/2012
BA-125 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2012
BA-125 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2012
TV-63 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2012
TV-63 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2012
SOP Manual for CRMS-Wetlands 2012 (PDF)Project Report1/27/2012
BS-11 2011 Annual Inspection Report (PDF)Inspection Report1/12/2012
MR-09 2011 Annual Inspection Report (PDF)Inspection Report1/12/2012
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2011 Post-Construction Survey;Monitoring Report (PDF)SURVEY REPORT1/1/2012
BA-68 Appendix D (PDF)BID DOCUMENTS12/28/2011
CS-31 As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/28/2011
CS-31 Segment Lengths for As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/28/2011
ME-16 As-Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/22/2011
CS-31 2011/2012 Annual Inspection Report (PDF)Inspection Report12/21/2011
CS-23 As-Built Drawings (PDF)AS-BUILT DRAWINGS - CONSTRUCTION12/20/2011
BA-33 Myrtle Grove Delta Building Diversion Modeling Effort in Support of the LCA Medium Diversion at Myrtle Grove with Dedicated Dredging Project (PDF)Contract Studies/Data Collection Report12/12/2011
CS-23 2011/2012 Annual Inspection Report (PDF)Inspection Report12/1/2011
ME-16 2011 Project Completion Report (PDF)Project Completion Report12/1/2011
CS-21 2010 Operations, Maintenance, and Monitoring Plan (PDF)OMM Plan12/1/2011
TE-40 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
ME-13 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
BA-03C 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
PO-17 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
TE-28 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2011
Lake Hermitage Marsh Creation Bid Package (PDF)BID DOCUMENTS11/15/2011
BA-68 Ecological Review (PDF)EA or EIS and Ecological Review11/14/2011
BA-20 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/1/2011
TV-13a 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/1/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
Bayou Bonfouca Marsh Creation Survey Report (PDF)SURVEY REPORT10/27/2011
CS-17 2011/2012 Annual Inspection Report (PDF)Inspection Report10/20/2011
TV-21 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan (PDF)OMM Plan10/1/2011
BA-68 Final Design Report (PDF)FINAL DESIGN REPORT10/1/2011
BA-23 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2011
TV-18 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report10/1/2011
South Lake Decade Freshwater Introduction As-Built Plans (PDF)AS-BUILT9/22/2011
CS-04a Meeting Presentation (PDF)MEETING PRESENTATION9/21/2011
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 Project Completion Report (PDF)Project Completion Report9/1/2011
BS-03A 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2011
TE-44 2011 Annual Inspection Report (PDF)Inspection Report8/30/2011
Penchant Basin Natural Resources Plan, Increment 1 As Builts (PDF)AS-BUILT8/29/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Lost Lake Marsh Creation and Hydrologic Restoration Geotechnical Report (PDF)GEOTECHNICAL REPORT8/8/2011
Department of the Army Consent to Cross U.S. Government Easement at Empire to Gulf Waterway Project (PDF)PERMITS8/6/2011
Geotech Permits (PDF)PERMITS8/5/2011
Geotech Permits (PDF)PERMITS8/5/2011
Geotech Permits (PDF)PERMITS8/5/2011
BA-02 2011 Annual Inspection Report (PDF)Inspection Report8/1/2011
TE-41 2011 Closeout Report For Mandalay Bank Protection Demonstration (TE-41) Project (PDF)Project Completion Report8/1/2011
TE-26 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2011
TV-14 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2011
BA-37 2011 Annual Inspection Report (PDF)Inspection Report7/30/2011
Non-Rock Alternatives to Shoreline Protection Demonstration Geotechnical Engineering Services (PDF)GEOTECHNICAL REPORT7/7/2011
BA-39 2011 Annual Inspection Report (PDF)Inspection Report7/1/2011
CS-24 2011 Operations, Maintenance, and Monitoriing Report (PDF)OM&M Report7/1/2011
TE-22 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
TV-04 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
CS-28-1 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2011
Geotechnical Design Report Chenier Ronquille Restoration Plaquemines Parish, Louisiana (PDF)GEOTECHNICAL REPORT6/30/2011
TV-17 2010/2011 Annual Inspection Report (PDF)Inspection Report6/26/2011
ME-14 2010/2011 Annual Inspection Report (PDF)Inspection Report6/10/2011
ME-04 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2011
CS-11b 2011 Operations, Maintenance, and Monitoring (PDF)OM&M Report6/1/2011
PO-22 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2011
BA-39 Project Completion Report (PDF)Project Completion Report5/24/2011
CS-27 2010/2011 Annual Inspection Report (PDF)Inspection Report5/4/2011
BS-03a Analysis of Fisheries-Independent Data (PDF)Contract Studies/Data Collection Report5/1/2011
ME-19 2011 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
Lost Lake Marsh Creation and Hydrologic Restoration Survey Report (PDF)SURVEY REPORT5/1/2011
CS-30 2010/2011 Annual Inspection Report (PDF)Inspection Report4/14/2011
TV-09 2010/2011 Annual Inspection Report (PDF)Inspection Report4/12/2011
ME-13 2010/2011 Annual Inspection Report (PDF)Inspection Report4/12/2011
Water Quality Certification (PDF)PERMITS4/11/2011
TV-15 2010/2011 Annual Inspection Report (PDF)Inspection Report4/5/2011
Operation, Maintenance, and Rehabilitation Plan for North Lake Mechant Landbridge Restoration Project TE-0044 (PDF)OMM Plan4/5/2011
TE-44 2011 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report4/5/2011
ME-11 2011/2012 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-22 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-11 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
ME-09 2010/2011 Annual Inspection Report (PDF)Inspection Report3/24/2011
Mississippi River Sediment Delivery System - Bayou Dupont Final Construction Fact Sheet (PDF)FACT SHEET3/21/2011
CS-20 Project Completion Report (PDF)Project Completion Report3/16/2011
LA-05 Monitoring and Comprehensive Project FINAL REPORT (PDF)Comprehensive Monitoring Report3/9/2011
TV-21 Completion Report (PDF)Project Completion Report3/1/2011
TV-21 As Built Drawings - Construction (PDF)AS-BUILT DRAWINGS - CONSTRUCTION3/1/2011
GIWW To Clovelly Hydrologic Restoration 2010 Maintenance Project As Built (PDF)AS-BUILT3/1/2011
LDWF Permit Application for Dredging (PDF)PERMITS3/1/2011
LDWF Permit Application for Dredging (PDF)PERMITS3/1/2011
TV-12 2010/2011 Annual Inspection Report (PDF)Inspection Report2/22/2011
TV-03 2010/2011 Annual Inspection Report (PDF)Inspection Report2/22/2011
CS-21 2010/2011 Annual Inspection Report (PDF)Inspection Report2/9/2011
CS-54 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
CS-54 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
TE-83 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
TE-83 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
PO-104 General Project Fact Sheet (PDF)General Project Fact Sheet2/8/2011
PO-104 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/8/2011
CS-20 2010/2011 Annual Inspection Report (PDF)Inspection Report2/7/2011
BA-40 Permit Plat (PDF)PERMITS2/3/2011
Riverine Sand Mining/Scofield Island Restoration Project (BA-40) Project Narrative (PDF)PERMITS2/1/2011
TE-45 2011 Annual Inspection Report (PDF)Inspection Report2/1/2011
BA-48 Environmental Assessment (PDF)Environmental Assessment2/1/2011
East Grand Terre Survey Report January 21, 2011 (PDF)SURVEY REPORT1/21/2011
CS-23 2010/2011 Annual Inspection Report (PDF)Inspection Report1/20/2011
BA-30 Project Completion Report (PDF)Project Completion Report1/20/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
Scofield Construction Bid Documents (PDF)BID DOCUMENTS1/5/2011
CS-53 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2011
CS-53 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2011
LA-39 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2011
LA-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2011
Bio-Engineered Oyster Reef Demonstration Bid Package (PDF)BID DOCUMENTS1/1/2011
TE-28 2010 Annual Inspection Report (PDF)Inspection Report12/28/2010
Raccoon Island Shoreline Protection Marsh Creation Coastal Zone Consistency Permit C20070631 (PDF)PERMITS12/24/2010
CS-17 2010/2011 Annual Inspection Report (PDF)Inspection Report12/9/2010
BA-02 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
CS-31 2010 Operations, Maintenance, and Monitoring Plan (PDF)OM&M Report12/1/2010
CS-20 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
ME-11 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/1/2010
PO-24 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report11/29/2010
CS-31 2010/2011 Annual Inspection Report (PDF)Inspection Report10/27/2010
TE-22 2010 Annual Inspection Report (PDF)Inspection Report10/27/2010
BA-48 Ecological Review (PDF)EA or EIS and Ecological Review10/27/2010
PO-29 Assessment of an Alternative Siphon System Intake (PDF)Contract Studies/Data Collection Report10/20/2010
PO-29 Assessment of an Alternative Siphon System Intake - Figures (PDF)Contract Studies/Data Collection Report10/20/2010
MR-09 2010 Annual Inspection Report (PDF)Inspection Report10/7/2010
CS-32 2010/2011 Annual Inspection Report (PDF)Inspection Report10/6/2010
Ba-48 95% Design Report (PDF)95% DESIGN REPORT10/1/2010
TE-52 Water Quality Certification (PDF)PERMITS9/29/2010
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Project Completion Report (PDF)Project Completion Report9/1/2010
BA-37 2010 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2010
Bio-Engineered Oyster Reef Demonstration Coastal Use Permit/Consistency Determination (PDF)PERMITS8/25/2010
Little Lake Shoreline Protection & Marsh Creation Project (BA-37) 2010 Post-Construction Survey Monitoring Report (PDF)SURVEY REPORT8/1/2010
TE-44 Lake Mechant Project Completion Report (PDF)Project Completion Report8/1/2010
TE-52 Environmental Assessment (PDF)Environmental Assessment8/1/2010
CRMS Fact Sheet (PDF)General Project Fact Sheet8/1/2010
GIWW Bank Restoration of Critical Areas in Terrebonne USACE Permit Extension MVN-2004-04534-WY (PDF)PERMITS7/22/2010
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 5 As Build Drawings (PDF)AS-BUILT7/20/2010
TE-48 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report7/1/2010
LA-03b Nutria Harvest and Distribution 2009-2010 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2010 (PDF)OM&M Report6/30/2010
PO-75 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
PO-75 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/16/2010
TE-72 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
TE-72 General Project Fact Sheet (PDF)General Project Fact Sheet6/16/2010
BA-76 General Project Fact Sheet (PDF)General Project Fact Sheet6/14/2010
BA-76 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/14/2010
ME-31 General Project Fact Sheet (PDF)General Project Fact Sheet6/9/2010
ME-31 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/9/2010
Bio-Engineered Oyster Reef Demonstration Category II Programmatic General Permit (PDF)PERMITS6/7/2010
Operation, Maintenance, and Rehabilitation Plan for the Terrebonne Bay Shore Protection and Demonstration Project State Project No. TE-45 (PDF)OMM Plan6/1/2010
TE-45 2010 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report6/1/2010
TE-26 2010 Annual Inspection Report (PDF)Inspection Report6/1/2010
TE-45 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report6/1/2010
BA-35 Project Completion Report (PDF)Project Completion Report6/1/2010
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management 95% Design Report (PDF)DESIGN REPORT5/7/2010
Lake Borgne Shoreline Protection Project Completion Report (PDF)Project Completion Report4/14/2010
CS-17 2009/2010 Annual Inspection Report (PDF)Inspection Report4/6/2010
AT-02 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report3/20/2010
AT-03 2010 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report3/20/2010
CS-18 2009/2010 Annual Inspection Report (PDF)Inspection Report3/18/2010
BA-40 Ecological Review (PDF)EA or EIS and Ecological Review3/16/2010
MR-03 West Bay Sediment Diversion EIS- Record of Decision (PDF)Project Report3/11/2010
CS-32 2009/2010 Annual Inspection Report (PDF)Inspection Report3/11/2010
BS-15 General Project Fact Sheet (PDF)General Project Fact Sheet3/10/2010
BS-15 General Project Fact Sheet High Qulaity (PDF)General Project Fact Sheet3/10/2010
BS-18 General Project Fact Sheet (PDF)General Project Fact Sheet3/10/2010
BS-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet3/10/2010
TE-50 Project Completion Report (PDF)Project Completion Report3/1/2010
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Increment 2 (PDF)BID DOCUMENTS2/23/2010
CS-04a Project Completion Report - Levee Erosion Work (PDF)Project Completion Report2/15/2010
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans Increment 2 (PDF)BID DOCUMENTS2/10/2010
CS-04a Project Completion Report - As Built 2010 (PDF)Project Completion Report2/1/2010
North Lake Boudreaux Basin Freshwater Introduction and Hydrologic Management Subsoil Investigation (PDF)GEOTECHNICAL REPORT1/27/2010
LA-09 General Project Fact Sheet (PDF)General Project Fact Sheet1/22/2010
LA-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/22/2010
BS-16 General Project Fact Sheet (PDF)General Project Fact Sheet1/19/2010
BS-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/19/2010
CS-49 General Project Fact Sheet (PDF)General Project Fact Sheet1/19/2010
CS-49 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/19/2010
TV-09 2009/2010 Annual Inspection Report (PDF)Inspection Report1/14/2010
TV-13a 2009/2010 Annual Inspection Report (PDF)Inspection Report1/14/2010
BA-48 General Project Fact Sheet (PDF)General Project Fact Sheet1/7/2010
BA-48 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/7/2010
BA-68 General Project Fact Sheet (PDF)General Project Fact Sheet1/7/2010
BA-68 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/7/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix A - Mississippi River Borrow Area Geophysical Survey (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix B: Mississippi River Borrow Area Geotechnical Survey (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix C: Mississippi River Borrow Area Sediment Analyses (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix D: Mississippi River One-Dimensional Modeling Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix E: Mississippi River Borrow Area Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix F: Conveyance Corridor Survey Report - Upland Segment (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 1-10 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 11-20 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix G: Conveyance Cooridor Survey Report Open Water Segment 21-32 (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix H: Environmental Mapping of the Conveyance Corridor and Scofield Island (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix I: Conveyance Corridor Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix J: Scofield Offshore Borrow Areas Design Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix K: SI Back-Barrier Geotechnical Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix L: Scofield Island Native Beach Sediment Analysis (PDF)95% DESIGN REPORT1/1/2010
BA-40 Riverine Sand Mining/Scofield Island Restoration Preliminary Design Report Appendix M: Scofield Island Restoration Area Design Analysis (PDF)95% DESIGN REPORT1/1/2010
TV-14 2009/2010 Annual Inspection Report (PDF)Inspection Report12/3/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 1 of 6 Overview (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 2 of 6 Uncertainty (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 3 of 6 Data Collection (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 4 of 6 Geomorphic Assessment (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 5 of 6 1-Dimensional Modeling (PowerPoint Presentation)Project Report12/1/2009
MR-03 Special Technical Committee Meeting Dec. 1 2009 - Presentations 6 of 6 Multi-Dimensional Modeling (PowerPoint Presentation)Project Report12/1/2009
MR-03 ERDC Work Plan Report - DRAFT West Bay Sediment Diversion Effects (PDF)Project Report11/25/2009
MR-03 Appendices A through M (PDF)Project Report11/25/2009
MR-03 Aerial and Bathymetric Spatial Change Analysis of the West Bay Sediment Diversion Receiving Area, Louisiana for U.S. Army Engineer District, New Orleans (MVN) (PDF)Project Report11/24/2009
North Lake Mechant Landbridge Restoration Water Quality Certification WQC 080424-01/AI 117287/CER 20090002 (PDF)PERMITS11/18/2009
LA-16 General Project Fact Sheet (PDF)General Project Fact Sheet11/16/2009
LA-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet11/16/2009
MR-09 2009 Annual Inspection Report (PDF)Inspection Report11/16/2009
BA-47 General Project Fact Sheet (PDF)General Project Fact Sheet11/12/2009
BA-47 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet11/12/2009
CS-21 2009/2010 Annual Inspection Report (PDF)Inspection Report11/12/2009
ME-11 2009/2010 Annual Inspection Report (PDF)Inspection Report11/6/2009
ME-20 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2009
BA-37 2009 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report11/1/2009
Operation, Maintenance, and Rehabilitation Plan for the Little Lake Shoreline Protection / Dedicated Dredging Project BA-37 (PDF)OMM Plan11/1/2009
West Bay Sediment Diversion Effects. (PDF)CONTRACTED STUDY11/1/2009
MR-03 20 Oct 09 Peer Review Meeting Presentations (PDF)Project Report10/27/2009
TE-66 General Project Fact Sheet (PDF)General Project Fact Sheet10/20/2009
TE-66 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/20/2009
CS-31 2009/2010 Annual Inspection Report (PDF)Inspection Report10/20/2009
CS-23 2009/2010 Annual Inspection Report (PDF)Inspection Report10/20/2009
TE-52 Monitoring Plan (PDF)OMM Plan10/15/2009
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 4 As Built (BA-27) (PDF)AS-BUILT10/6/2009
North Lake Mechant Landbridge Restoration Coast Zone Consistency Use Permit C20040642 (PDF)PERMITS10/6/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Lake Decade Freshwater Introduction Bid Documents (PDF)BID DOCUMENTS10/1/2009
South Grand Chenier Marsh Creation Final Design Report (PDF)DESIGN REPORT10/1/2009
CS-23 Project Completion Report (As Built) (PDF)Project Completion Report9/25/2009
CS-23 2009 Project Completion Report (PDF)Project Completion Report9/23/2009
BA-37 Summer 2009 Post Construction Monitoring Report (PDF)OM&M Report9/20/2009
TV-13a 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2009
BS-03a 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report9/1/2009
BS-03a 2009 Annual Inspection Report (PDF)Inspection Report8/5/2009
MR-09 2009 Operations, Maintenance & Monitoring Report (PDF)Monitoring Report8/1/2009
PO-34 General Project Fact Sheet (PDF)General Project Fact Sheet8/1/2009
PO-34 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet8/1/2009
2009 Operations, Maintenance and Monitoring Report for Delta Wide Crevasses (MR-09) (PDF)OM&M Report8/1/2009
Goose Point/Point Platte Marsh Creation AS Built Survey (PDF)AS-BUILT8/1/2009
PO-33 Project Completion Report (As Constructed) (PDF)Project Completion Report8/1/2009
Bayou Penchant Basin (TE-34) Construction Specifications (PDF)DESIGN REPORT8/1/2009
BA-38 2009 Operations, Maintenance & Monitoring Report (PDF)Monitoring Report7/20/2009
BA-03c 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-06 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-24 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-26 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-38 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-23 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-16 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
PO-18 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
BA-20 2008 Annual Inspection Report (PDF)Inspection Report7/13/2009
MR-03 USACE West Bay Fact Sheet 07 July 2009 (PDF)Project Report7/7/2009
MR-03 7 Jul 09 Peer Review Meeting Presentation (PDF)Project Report7/7/2009
PO-22 2008 Annual Inspection Report (PDF)Inspection Report7/1/2009
PO-06 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
PO-24 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-26 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-23 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-38 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
BA-37 2009 Annual Inspection Report (PDF)Inspection Report7/1/2009
South Grand Chenier Marsh Creation 30% Design Report (PDF)DESIGN REPORT7/1/2009
LA-03b Nutria Harvest and Distribution 2008-2009 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2009 (PDF)OM&M Report6/30/2009
TE-28 2009 Annual Inspection Report (PDF)Inspection Report6/30/2009
BA-02 2009 Annual Inspection Report (PDF)Inspection Report6/30/2009
CS-28-2 General Project Fact Sheet (PDF)General Project Fact Sheet6/23/2009
CS-28-2 General Project Fact Sheet High quality (PDF)General Project Fact Sheet6/23/2009
ME-24 General Project Fact Sheet (PDF)General Project Fact Sheet6/18/2009
ME-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/18/2009
TV-17 2008/2009 Annual Inspection Report (PDF)Inspection Report6/17/2009
PO-33 Project Completion Report (PDF)Project Completion Report6/10/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Pelican Island Issued Permits (PDF)PERMITS6/5/2009
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF)BID DOCUMENTS6/3/2009
Whiskey Island Back Barrier Marsh Creation Vegetative Planting Bid Documents (PDF)BID DOCUMENTS6/3/2009
TE-26 2009 Annual Inspection Report (PDF)Inspection Report6/1/2009
TE-22 2009 Annual Inspection Report (PDF)Inspection Report6/1/2009
CS-23 As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION6/1/2009
CS-24 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2009
TV-09 2009 Operations, Maintenance, and Mointoring Report (PDF)OM&M Report6/1/2009
ME-14 2009 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2009
LA-08 General Project Fact Sheet (PDF)General Project Fact Sheet5/27/2009
LA-08 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/27/2009
TV-14 2008/2009 Annual Inspection Report (PDF)Inspection Report5/5/2009
TE-40 Habitat Mapping and Change Analysis: 2005 to 2006 Final Report (PDF)Contract Studies/Data Collection Report4/8/2009
ME-16 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-30 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-27 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report4/1/2009
CS-04a As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION4/1/2009
TE-43 Breach Closures along the GIWW As-Built Drawings (PDF)AS-BUILT3/31/2009
BA-20 2009 Annual Inspection Report (PDF)Inspection Report3/23/2009
BA-03c 2009 Annual Inspection Report (PDF)Inspection Report3/20/2009
Lake Borgne Shoreline Protection As Built (PDF)AS-BUILT3/1/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CHRONOLOGY OF THE HISTORY OF THE DEVELOPMENT - Broussard (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations CWPPRA Tech Com Meet Feb 09--Henville (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations Kj0_West Bay (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (2) (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WESTBAY 27 Feb 09 Price (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBay_Padgett_27FEB09 (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations West-Bay-CWPPRA-meeting_multi-D-modeling-022709 - Brown (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations WestBayrGeomorphicAssessment1DModeling (PDF)Project Report2/27/2009
MR-03 27 Feb 09 Technical Committee Special Workgroup Meeting/2009 Work Plan Presentations (All files zipped) (Zipped file)Project Report2/27/2009
CS-20 As-Built Drawings (PDF)AS-BUILT DRAWINGS - CONSTRUCTION2/9/2009
CS-20 As-Built Bid Package (PDF)AS-BUILT DRAWINGS - CONSTRUCTION2/1/2009
AT-02 Louisiana BICM Volume 2, Parts 1-4 (PDF)Contract Studies/Data Collection Report2/1/2009
AT-02 Louisiana BICM Volume 2, Appendices A-C (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 1 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 3 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 5: Habitat Mapping and Change Analysis 1996 to 2005 Part: 4 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 3 (PDF)Contract Studies/Data Collection Report2/1/2009
BA-39 Environmental Assessment (PDF)EA or EIS and Ecological Review1/2/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
Louisiana BICM Volume 1, Part 1: 2005 Post Hurricanes Katrina and Rita Photography (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 2: 2006/2007 Aerial Survey Photography (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 4: Historic Photo-Pairs/Time Series (PDF)Contract Studies/Data Collection Report1/1/2009
AT-02 Louisiana BICM Volume 1, Part 5: 2006/2007 Aerial Video Survey (PDF)Contract Studies/Data Collection Report1/1/2009
BA-28 Louisiana BICM Volume 3: Bathymetry and Historical Seafloor Change 1869-2007 Part 1 (PDF)Contract Studies/Data Collection Report1/1/2009
TE-24 2008 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report12/1/2008
TV-21 Environmental Assessment (PDF)EA or EIS and Ecological Review11/18/2008
Mississippi River Sediment Delivery System - Bayou Dupont Bid Specifications Addendum 04 (PDF)BID DOCUMENTS11/6/2008
TV-21 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2008
BA-42 Ecological Review (PDF)EA or EIS and Ecological Review11/3/2008
PO-17 2008 Operations, Maintenance and Monitoring Report (PDF)OM&M Report11/1/2008
TV-13a 2008/2009 Annual Inspection Report (PDF)Inspection Report10/30/2008
ME-22 2008/2009 Annual Inspection Report (PDF)Inspection Report10/29/2008
CS-31 2008/2009 Annual Inspection Report (PDF)Inspection Report10/20/2008
CS-20 2008/2009 Annual Inspection Report (PDF)Inspection Report10/20/2008
BA-37 Final Spring 2008 Post Construction Monitoring Report (PDF)OM&M Report10/20/2008
BA-33 Alternative Modeling (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices A-H (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices I-R (PDF)Contract Studies/Data Collection Report10/16/2008
BA-33 Alternative Modeling - Appendices S-W (PDF)Contract Studies/Data Collection Report10/16/2008
CS-21 2008/2009 Annual Inspection Report (PDF)Inspection Report10/14/2008
TV-18 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
ME-13 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
ME-04 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
TV-12 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
TV-03 2008/2009 Annual Inspection Report (PDF)Inspection Report10/9/2008
CS-24 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-30 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-27 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
CS-22 2008/2009 Annual Inspection Report (PDF)Inspection Report10/2/2008
ME-11 2008/2009 Annual Inspection Report (PDF)Inspection Report10/1/2008
CS-11b 2008/2009 Annual Inspection Report (PDF)Inspection Report10/1/2008
BA-42 Final Design Report (PDF)FINAL DESIGN REPORT10/1/2008
TV-15 2008/2009 Annual Inspection Report (PDF)Inspection Report9/30/2008
TV-04 2008/2009 Annual Inspection Report (PDF)Inspection Report9/30/2008
SOP Manual for CRMS-Wetlands 2008 (PDF)Project Report9/18/2008
TE-50 Whiskey Island Back Barrier Marsh Creation As-Built Drawings (PDF)AS-BUILT9/1/2008
West Belle Pass Headland Restoration (TE-52): Phase I Investigations (PDF)GEOTECHNICAL REPORT9/1/2008
Whiskey Island Back Barrier Marsh Creation Bid Package (PDF)BID DOCUMENTS8/29/2008
Mississippi River Sediment Delivery System - Bayou Dupont Bid Plans (PDF)BID DOCUMENTS8/11/2008
TE-22 2008 Annual Inspection Report (PDF)Inspection Report8/1/2008
TE-44 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
TE-20 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
BA-03c 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2008
AT-02 Louisiana BICM Volume 1, Part 3: 2005-2007 Photo-Pairs (PDF)Contract Studies/Data Collection Report8/1/2008
AT-03 2008 Biennial Inspection Report (PDF)Inspection Report7/31/2008
CS-04a Project Completion Report - Repair of Breaches (PDF)Project Completion Report7/24/2008
CS-04A Project Completion Report - As Built Drawings 2006 (PDF)Project Completion Report7/24/2008
AT-02 2008 Biennial Inspection Report (PDF)Inspection Report7/21/2008
TE-45 Transect Survey Report (PDF)Project Completion Report7/16/2008
TE-45 Terrebonne Bay Shore Protection Demonstration Project TE-45 Survey Report (PDF)Project Completion Report7/16/2008
PO-22 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
CS-23 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
TV-18 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/1/2008
LA-03b Nutria Harvest Distribution 2007-2008 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2008 (PDF)OM&M Report6/30/2008
Raccoon Island Shoreline Protection Marsh Creation Permits MVN-2008-0143 CQ (PDF)PERMITS6/18/2008
TV-12 2007/2008 Annual Inspection Report (PDF)Inspection Report6/6/2008
Whiskey Island Back Barrier Marsh Creation U S Army Corps of Engineers Permit MVN 2008-226-CY (PDF)PERMITS6/2/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 1 (PDF)Contract Studies/Data Collection Report6/1/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 2 (PDF)Contract Studies/Data Collection Report6/1/2008
BA-28 Louisiana BICM Volume 4: Louisiana Lidar Part: 3 (PDF)Contract Studies/Data Collection Report6/1/2008
MR-06 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF)SURVEY REPORT5/30/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) Final Report (PDF)SURVEY REPORT5/30/2008
Topographic and Bathymetric Survey Atchafalaya Sediment Delivery (AT-02) Big Island Mining (AT-03) (PDF)SURVEY REPORT5/30/2008
ME-22 2007/2008 Annual Inspection Report (PDF)Inspection Report5/28/2008
CS-04a Project Completion Report - Levee Breaches (PDF)Project Completion Report5/21/2008
TE-26 2008 Annual Inspection Report (PDF)Inspection Report5/16/2008
CS-11b 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
ME-11 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
TE-28 2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
ME-09 2007/2008 Annual Inspection Report (PDF)Inspection Report5/1/2008
TE-27 2008 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/1/2008
TV-09 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
ME-13 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
ME-04 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
TV-03 2007/2008 Annual Inspection Report (PDF)Inspection Report4/24/2008
TE-45 Project Completion Report (PDF)Project Completion Report4/16/2008
BS-11 2008 Annual Inspection Report (PDF)Inspection Report4/15/2008
TV-17 2007/2008 Annual Inspection Report (PDF)Inspection Report4/15/2008
BA-02 2008 Annual Inspection Report (PDF)Inspection Report4/9/2008
ME-19 2007/2008 Annual Inspection Report (PDF)Inspection Report4/4/2008
TV-15 2007/2008 Annual Inspection Report (PDF)Inspection Report4/1/2008
ME-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2008
ME-17 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2008
MR-09 2008 Annual Inspection Report (PDF)Inspection Report3/12/2008
CS-20 2007/2008 Annual Inspection Report (PDF)Inspection Report3/11/2008
ME-14 2007/2008 Annual Inspection Report (PDF)Inspection Report3/6/2008
BS-03a 2008 Annual Inspection Report (PDF)Inspection Report3/4/2008
TV-14 2007-2008 Annual Inspection Report (PDF)Inspection Report2/28/2008
Whiskey Island Back Barrier Marsh Creation Coastal Zone Consistency C20070623 (PDF)PERMITS2/18/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
2005 Operations, Maintenance, and Monitoring Report for Barataria Basin Landbridge Shoreline Protection Project (Phases 1, 2, 3, and 4)(BA-27, BA-27c, BA-27d) (PDF)Monitoring Report2/13/2008
CS-21 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report2/13/2008
CS-21 2007/2008 Annual Inspection Report (PDF)Inspection Report2/12/2008
TE-51 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/4/2008
TE-52 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/4/2008
TE-51 General Project Fact Sheet (PDF)General Project Fact Sheet2/4/2008
TE-52 General Project Fact Sheet (PDF)General Project Fact Sheet2/4/2008
TE-53 General Project Fact Sheet (PDF)General Project Fact Sheet1/1/2008
TE-53 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet1/1/2008
TV-04 2008 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
North Lake Mechant Landbridge Restoration Bid Package (PDF)BID DOCUMENTS1/1/2008
TE-44 North Lake Mechant Landbridge Restoration As-Builts (PDF)AS-BUILT1/1/2008
TE-48 Phase B Ecological Review (PDF)EA or EIS and Ecological Review12/19/2007
PO-06 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report12/13/2007
CS-17 2007/2008 Annual Inspection Report (PDF)Inspection Report12/12/2007
BA-41 Ecological Review (PDF)EA or EIS and Ecological Review12/12/2007
TV-04 2001 Project Completion Report - As Built Drawings (PDF)Project Completion Report12/11/2007
CS-18 2007/2008 Annual Inspection Report (PDF)Inspection Report12/6/2007
TV-04 2007 Project Completion Report (PDF)Project Completion Report12/1/2007
BA-33 Modeling Relationships between the Abundance of Fishery Species, Coastal Wetland Landscapes, and Salinity in the Barataria Basin, Louisiana (PDF)General Programmatic Document12/1/2007
CS-22 2007/2008 Annual Inspection Report (PDF)Inspection Report11/27/2007
BA-39 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2007
TE-50 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2007
BA-23 2007 Project Completion Report (PDF)Project Completion Report11/6/2007
TE-50 Monitoring Plan (PDF)OMM Plan11/5/2007
ME-09 2006/2007 Annual Inspection Report (PDF)Inspection Report11/2/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
ME-04 ME-13 TV-11 TV-03 2005 Project Completion Report (PDF)Project Completion Report11/1/2007
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report (PDF)DESIGN REPORT11/1/2007
Mississippi River Sediment Delivery System - Bayou Dupont 95% Engineering and Design Report Appendices (PDF)DESIGN REPORT11/1/2007
CS-31 2007/2008 Annual Inspection Report (PDF)Inspection Report10/30/2007
CS-28-3 Project Completion Report (PDF)Project Completion Report10/19/2007
CS-28-3 2007 Project Completion Report (PDF)Project Completion Report10/19/2007
BA-39 Review (Contracted Study Report) (PDF)Contract Studies/Data Collection Report10/17/2007
TE-37 Project Completion Report 1 of 7 (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 2 of 7 Apdx A (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 3 of 7 Apdx B (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 4 of 7 Apdx C (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 5 of 7 Apdx D (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 6 of 7 Apdx E (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report 7 of 7 Apdx F (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix A (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix B (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix C (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix D (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix E (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report Appendix F (PDF)Project Completion Report10/5/2007
TE-37 Project Completion Report (PDF)Project Completion Report10/5/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix A (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix B (PDF)GEOTECHNICAL REPORT10/1/2007
Lake Hermitage Marsh Creation Geotechnical Investigation Report Appendix C (PDF)GEOTECHNICAL REPORT10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Bid Package (PDF)BID DOCUMENTS10/1/2007
TE-23 Project Completion Report As-Built Drawings (PDF)Project Completion Report9/27/2007
BA-37 Post Construction Survey Report (PDF)OM&M Report8/20/2007
PO-24 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/14/2007
BA-02 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/6/2007
ME-19 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-31 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
ME-11 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-21 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TE-41 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TV-14 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TV-03 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-20 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
ME-04 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
TE-28 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-17 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
CS-28 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report8/1/2007
BA-37 Project Completion Report (PDF)Project Completion Report8/1/2007
Raccoon Island Shoreline Protection and Marsh Creation 30% Design Report (PDF)DESIGN REPORT8/1/2007
BA-20 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/30/2007
TE-37 Vegetative Plantings (As-built) (PDF)Project Completion Report7/24/2007
PO-27 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report7/19/2007
PO-18 2006/2007 Annual Inspection Report (PDF)Inspection Report7/19/2007
BA-03c 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
BS-03a 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
PO-22 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
BA-26 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
PO-16 2006/2007 Annual Inspection Report (PDF)Inspection Report7/18/2007
TE-22 2006/2007 Annual Inspection Report (PDF)Inspection Report7/1/2007
Geotechnical Investigation Data Report Mississippi River Sediment Delivery System - Bayou Dupont (PDF)GEOTECHNICAL REPORT7/1/2007
Mississippi River Sediment Delivery System - Bayou Soil Borings (PDF)GEOTECHNICAL REPORT7/1/2007
LA-03b Nutria Harvest Distribution 2006-2007 and A Survey of Nutria Herbivory Damage in Coastal Louisiana in 2007 (PDF)OM&M Report6/30/2007
TE-40 Monitoring Plan (PDF)OMM Plan6/25/2007
TV-15 2006/2007 Annual Inspection Report (PDF)Inspection Report6/22/2007
TV-04 2006/2007 Annual Inspection Report (PDF)Inspection Report6/22/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
BA-27, BA-27c, BA-27d 2006/2007 Annual Inspection Report (PDF)Inspection Report6/21/2007
CS-24 2006/2007 Annual Inspection Report (PDF)Inspection Report6/20/2007
CS-30 2006/2007 Annual Inspection Report (PDF)Inspection Report6/20/2007
TV-17 2006/2007 Annual Inspection Report (PDF)Inspection Report6/19/2007
ME-14 2006/2007 Annual Inspection Report (PDF)Inspection Report6/19/2007
ME-16 2007 Project Completion Report (PDF)Project Completion Report6/18/2007
TE-26 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/15/2007
Chaland Headland Restoration (BA-38-2) CWPPRA Project Completion Report Short Version (PDF)Project Completion Report6/4/2007
BA-23 2007 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2007
BS-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
MR-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
BS-13 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
MR-15 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
TV-21 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2007
TV-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2007
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/30/2007
MR-09 2004 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report5/30/2007
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF)Monitoring Report5/1/2007
BA-03c and BA-26 2004 Operations, Maintenance and Monitoring Report (PDF)Monitoring Report5/1/2007
TV-13a 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
TV-09 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
ME-13 2006/2007 Annual Inspection Report (PDF)Inspection Report5/1/2007
TV-14 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2007
BA-37 Project Completion Report (As-Built Plans) (PDF)Project Completion Report5/1/2007
BA-38 Project Completion Report As-Built Drawings (PDF)Project Completion Report4/13/2007
BA-03c 2006 Annual Inspection Report (PDF)Inspection Report4/5/2007
CS-28-3 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2007
ME-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2007
CS-28-3 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2007
ME-16 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2007
TE-37 Project Completion Report As-Built Drawings (PDF)Project Completion Report3/28/2007
CS-20 Comprehensive Monitoring Report 2 (PDF)Comprehensive Monitoring Report3/26/2007
CS-18 2006/2007 Annual Inspection Report (PDF)Inspection Report3/22/2007
CS-23 2006/2007 Annual Inspection Report (PDF)Inspection Report3/22/2007
TE-39 Environmental Assessment (PDF)Environmental Assessment3/19/2007
TV-18 2006/2007 Annual Inspection Report (PDF)Inspection Report3/6/2007
TV-12 2006/2007 Annual Inspection Report (PDF)Inspection Report3/6/2007
PO-29 Hydraulic Feasibility Study 1 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 2 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 3 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 4 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 5 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 6 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
PO-29 Hydraulic Feasibility Study 7 of 7 (PDF)Contract Studies/Data Collection Report3/1/2007
BA-35 Environmental Assessment (PDF)Environmental Assessment3/1/2007
BA-35 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2007
LA-05 Monitoring Report 1 of 2 (PDF)OM&M Report2/5/2007
LA-05 Monitoring Report 2 of 2 (PDF)OM&M Report2/5/2007
Lake Borgne Shoreline Protection Bid Documents (PDF)BID DOCUMENTS2/1/2007
Lake Borgne Shoreline Protection Bid Documents (PDF)BID DOCUMENTS2/1/2007
TE-45 Terrebonne Bay Shoreline Protection Demonstration As-Built Drawings (PDF)Inspection Report2/1/2007
CS-31 As-Built Sand Fence Repairs (PDF)Project Completion Report1/18/2007
BS-11 Project Completion Report (PDF)Project Completion Report1/4/2007
GIWW To Clovelly Hydrologic Restoration Timber Pile Cluster and Navigational Aid Replacement (PDF)Project Completion Report1/4/2007
CS-31 2006 Project Completion Report (PDF)Project Completion Report12/4/2006
CS-11b 2005/2006 Annual Inspection Report (PDF)Inspection Report11/13/2006
LA-05 Annual Report 2005-2006 (PDF)OM&M Report11/12/2006
PO-32 Ecological Review (PDF)EA or EIS and Ecological Review11/8/2006
CS-22 2006/2007 Annual Inspection Report (PDF)Inspection Report11/8/2006
CS-11b 2006/2007 Annual Inspection Report (PDF)Inspection Report11/2/2006
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF)Inspection Report10/18/2006
2005/2006 Annual Inspection Report for Barataria Landbridge Shoreline Protection Project-Construction Units No. 1, 2 & 3 (PDF)Inspection Report10/18/2006
TE-26 2005/2006 Annual Inspection Report (PDF)Inspection Report9/30/2006
ME-22 Project Completion Report (PDF)Project Completion Report9/25/2006
ME-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet9/1/2006
ME-23 General Project Fact Sheet (PDF)General Project Fact Sheet9/1/2006
BA-27d Project Completion Report (As-Built) (PDF)Project Completion Report8/31/2006
Barataria Basin Landbridge Shoreline Protection Construction Unit No. 6 As Built Drawings (BA-27) (PDF)AS-BUILT8/31/2006
TE-28 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
BA-27 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
TE-22 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
BA-02 2005/2006 Annual Inspection Report (PDF)Inspection Report8/17/2006
PO-16 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
PO-18 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
PO-22 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
BA-20 2006 Annual Inspection Report (PDF)Inspection Report8/15/2006
PO-24 2006 Annual Inspection Report (PDF)Inspection Report8/14/2006
PO-06 2006 Annual Inspection Report (PDF)Inspection Report8/14/2006
BA-23 2006 Annual Inspection Report (PDF)Inspection Report8/10/2006
BA-26 2006 Annual Inspection Report (PDF)Inspection Report8/10/2006
TE-18 Comprehensive Monitoring Report No. 1 (PDF)OM&M Report8/1/2006
TE-46 Environmental Assemment (PDF)EA or EIS and Ecological Review7/1/2006
BA-27 Environmental Assessment (PDF)Environmental Assessment6/16/2006
TE-40 Timbalier Island Vegetative Plantings - Phase II (As-built) (PDF)Project Completion Report6/13/2006
TE-40 2006 Project Completion Report (PDF)Project Completion Report6/1/2006
Pass Chaland to Grand Gayou Pass Barrier Shoreline Restoration Permit MVN 2005-4406-EBB (PDF)OM&M Report5/28/2006
BA-02 Hydrodynamic and Salinity Modeling (PDF)Contract Studies/Data Collection Report5/10/2006
ME-18 Environmental Assessment with Memos (PDF)Environmental Assessment5/1/2006
ME-18 Environmental Assessment (PDF)EA or EIS and Ecological Review5/1/2006
Louisiana Department of Natural Resources Report of Geotechnical Investigation Goose Point/Point Platte (PO-0033), St. Tammany Parish, Louisiana (PDF)GEOTECHNICAL REPORT4/20/2006
ME-17 Hydrodynamic Modeling 1 of 2 (PDF)Contract Studies/Data Collection Report4/19/2006
ME-17 Hydrodynamic Modeling 2 of 2 (PDF)Contract Studies/Data Collection Report4/19/2006
BA-42 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2006
BA-41 General Project Fact Sheet (PDF)General Project Fact Sheet4/1/2006
BA-41 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2006
BA-42 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet4/1/2006
BA-26 2006 Project Completion Report (PDF)Project Completion Report3/30/2006
BA-23 2006 Project Completion Report (PDF)Project Completion Report3/30/2006
Lake Borgne Shoreline Protection Coastal Use Permit (PDF)PERMITS3/28/2006
BA-27 Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
BA-27c Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
BA-27d Ecological Review (PDF)EA or EIS and Ecological Review3/15/2006
ME-22 2006 Environmental Assessment (PDF)Environmental Assessment3/7/2006
AT-04 Environmental Assessment (PDF)Environmental Assessment3/1/2006
BA-25b Final Phase 2 Design Report part 1 of 6 (PDF)Contract Studies/Data Collection Report3/1/2006
BA-25 Phase 2 Design Report (PDF)Contract Studies/Data Collection Report3/1/2006
ME-04 2006 Completion Report Maintenance/Repair (PDF)Project Completion Report3/1/2006
Rockefeller Refuge Gulf Shoreline Stabilization Final Design Report (PDF)DESIGN REPORT2/15/2006
TV-04 and TV-17 Repair and Maintenance - As Built Drawings (PDF)Project Completion Report2/1/2006
ME-20 Hydrodynamic Modeling 1 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 2 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 3 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
ME-20 Hydrodynamic Modeling 4 of 4 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 1 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 2 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
BA-04c Hydrodynamic Modeling 3 of 3 (PDF)Contract Studies/Data Collection Report1/24/2006
GIWW Bank Restoration of Critical Areas in Terrebonne UASCE Permit MVN 2004-4534 CY (PDF)PERMITS1/18/2006
AT-02 2005 Bi-Annual Inspection Report (PDF)Inspection Report12/30/2005
2005 Bi-Annual Inspection Report for Big Island Mining (PDF)Inspection Report12/30/2005
AT-02 Monitoring Plan (PDF)Monitoring Plan12/27/2005
BA-27 Monitoring Plan (PDF)Monitoring Plan12/27/2005
BA-25b Phase 1 Design Report Cover Pages (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Executive Summary (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Table of Contents (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 1 - Introduction (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 2 - Overview of Alternatives Development (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 3 - Conveyance Evaluation (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 4 - Diversion Structures (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 5 - Infrastructure, Utility, and Site Modifications (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 6 - Dredging, Disposal, and Beneficial Reuse Analysis (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 7 - Comparison of Alternatives (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 8 - Recommended Alternatives for the 30 Percent Design Evaluation (PDF)Project Report12/15/2005
BA-25b Phase 1 Design Report Section 9 - LDNR and U.S. EPA Review (PDF)Project Report12/15/2005
GIWW Bank Restoration of Critical Areas in Terrebonne Coastal Zone Consistency Permit (PDF)PERMITS12/7/2005
TE-47 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
LA-05 Project Plan and Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
PO-30 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2005
TE-23 Comprehensive Monitoring Report 1 (PDF)OM&M Report12/1/2005
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration 95% Design Report (PDF)DESIGN REPORT12/1/2005
BA-30 Ecological Review (PDF)EA or EIS and Ecological Review11/30/2005
BA-30 Ecological Review (PDF)EA or EIS and Ecological Review11/30/2005
PO-30 Ecological Review (PDF)EA or EIS and Ecological Review11/22/2005
TE-46 Ecological Review (PDF)EA or EIS and Ecological Review11/22/2005
BS-03a 2006 Annual Inspection Report (PDF)Inspection Report11/17/2005
TE-23 2005 Operation, Maintenance, Repair, Replacement, and Rehabilitation Plan (PDF)Project Report11/14/2005
Operation, Maintenance, and Rehabilitation Plan for the West Belle Pass Headland Restoration Project (TE - 23 / PTE - 27) (PDF)OMM Plan11/14/2005
BA-35 Ecological Review (PDF)EA or EIS and Ecological Review11/7/2005
CS-20 2005/2006 Annual Inspection Report (PDF)Inspection Report11/3/2005
CRMS - Wetlands, Status Report for the CWPPRA Task Force (PDF)Project Report11/3/2005
BA-25b Phase 1 Design Report part 1 of 5 (PDF)Contract Studies/Data Collection Report11/1/2005
BA-25 Phase 1 Design Report (PDF)Contract Studies/Data Collection Report11/1/2005
BA-36 Environmental Assessment (PDF)EA or EIS and Ecological Review11/1/2005
Lake Borgne Shoreline Protection 95% Design Report (PDF)DESIGN REPORT11/1/2005
AT-04 Ecological Review (PDF)EA or EIS and Ecological Review10/27/2005
CS-18 2005/2006 Annual Inspection Report (PDF)Inspection Report10/27/2005
West Lake Boudreaux Shoreline Protection and Marsh Creation 95% Design Report (PDF)DESIGN REPORT10/26/2005
CS-17 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
CS-21 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
CS-31 2005/2006 Annual Inspection Report (PDF)Inspection Report10/24/2005
ME-09 2005/2006 Annual Inspection Report (PDF)Inspection Report10/21/2005
ME-14 2005/2006 Annual Inspection Report (PDF)Inspection Report10/20/2005
TV-17 2005/2006 Annual Inspection Report (PDF)Inspection Report10/20/2005
ME-11 2005/2006 Annual Inspection Report (PDF)Inspection Report10/19/2005
CS-23 2005/2006 Annual Inspection Report (PDF)Inspection Report10/13/2005
ME-19 2005/2006 Annual Inspection Report (PDF)Inspection Report10/12/2005
TE-47 Ecological Review (PDF)EA or EIS and Ecological Review10/12/2005
TV-15 2005/2006 Annual Inspection Report (PDF)Inspection Report10/11/2005
TV-04 2005/2006 Annual Inspection Report (PDF)Inspection Report10/11/2005
TV-14 2005/2006 Annual Inspection Report (PDF)Inspection Report10/10/2005
ME-13 2005/2006 Annual Inspection Report (PDF)Inspection Report10/7/2005
ME-04 2005/2006 Annual Inspection Report (PDF)Inspection Report10/7/2005
CS-24 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
CS-27 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
CS-30 2005/2006 Annual Inspection Report (PDF)Inspection Report10/6/2005
TV-18 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-09 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-13a 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-12 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TV-03 2005/2006 Annual Inspection Report (PDF)Inspection Report10/4/2005
TE-22 Breach Repairs (As-Built) (PDF)Project Completion Report10/4/2005
ME-18 Ecological Review (PDF)EA or EIS and Ecological Review9/20/2005
GIWW Bank Restoration of Critical Areas in Terrebonne Water Quality Certification (PDF)PERMITS9/20/2005
ME-18 Environmental Assessment (PDF)EA or EIS and Ecological Review9/20/2005
TE-45 Monitoring Plan (PDF)OMM Plan9/12/2005
TE-22 Project Completion Report (PDF)Project Completion Report9/1/2005
TE-48 Monitoring Plan (PDF)OMM Plan8/24/2005
BA-37 Monitoring Plan (PDF)OMM Plan8/16/2005
MR-09 Final Report (PDF)Project Completion Report8/8/2005
TE-22 2005 Operations, Maintenance, and Monitoring Report (PDF)Monitoring Report8/1/2005
Raccoon Island Shoreline Protection and Marsh Creation Offshore Geophysical and Preliminary Geotechnical Survey Report (PDF)GEOTECHNICAL REPORT7/15/2005
PO-32 Ecological Review (PDF)EA or EIS and Ecological Review7/12/2005
TE-48 Ecological Review (PDF)EA or EIS and Ecological Review7/6/2005
Lake Borgne Shoreline Protection Preliminary Design Report (PDF)DESIGN REPORT7/1/2005
LA-03b Nutria Harvest Distribution 2004-2005 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2005 (PDF)OM&M Report6/30/2005
MR-09 Project Completion Report (PDF)Project Completion Report6/28/2005
MR-09 Project Completion Report - Hydro Consultants, Inc. (PDF)Project Completion Report6/28/2005
TE-36 Close Out Report (PDF)Close Out Report6/27/2005
TE-40 Timbalier Island Vegetative Plantings - Phase I (As-built) (PDF)Project Completion Report6/23/2005
LA-05 Monitoring Plan (PDF)OMM Plan6/13/2005
TV-15 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-16 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-17 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-25 and TE-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TE-28 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-09 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
PO-22 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-11 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-13 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
ME-09 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-28-1 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-30 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-17 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-18 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-23 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-24 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-22 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-11b 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-03 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-14 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
TV-18 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
BA-03c 2005 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/1/2005
CS-20 2005 Comprehensive Monitoring Report (PDF)OM&M Report5/20/2005
ME-22 Monitoring Plan (PDF)OMM Plan5/16/2005
BS-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet5/12/2005
BS-12 General Project Fact Sheet (PDF)General Project Fact Sheet5/12/2005
ME-21 Monitoring Plan (PDF)OMM Plan5/10/2005
ME-16 Monitoring Plan (PDF)OMM Plan5/10/2005
Rockefeller Refuge Gulf Shoreline Stabilization 95% Design Report (PDF)DESIGN REPORT5/2/2005
TE-48 Raccoon Island Shoreline Protection and Marsh Creation (Phase A) As-Built Drawings (PDF)AS-BUILT5/1/2005
BA-03c Project Completion Report (PDF)Project Completion Report4/13/2005
PO-24 2005 Project Completion Report (PDF)Project Completion Report4/4/2005
TE-40 Project Completion Report As-Built Drawings (PDF)Project Completion Report3/29/2005
Coastwide Reference Monitoring System - Wetlands, Status Report for the CWPPRA Technical Committee, March 15, 2005 (PowerPoint Presentation)Project Report3/15/2005
TE-40 2005 Project Completion Report (PDF)Project Completion Report3/1/2005
TE-36 Final Report (PDF)OM&M Report3/1/2005
TE-48 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2005
ME-16 Environmental Assessment (PDF)EA or EIS and Ecological Review3/1/2005
TV-11b Monitoring Plan (PDF)OMM Plan2/3/2005
BA-40 General Project Fact Sheet (PDF)General Project Fact Sheet2/1/2005
BA-40 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet2/1/2005
CS-23 2005 Project Completion Report (PDF)Project Completion Report1/27/2005
TV-17 Project Completion Report (PDF)Project Completion Report1/25/2005
CS-17 Draft 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report1/24/2005
TV-15 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/14/2005
PO-24 Project Completion Report (PDF)Project Completion Report1/12/2005
TV-15 Monitoring Plan (PDF)OMM Plan1/5/2005
ME-19 Project Completion Report (PDF)Project Completion Report1/3/2005
TV-15 Project Completion Report (PDF)Project Completion Report1/1/2005
TE-17 Project Completion Report As-Built Drawings (PDF)Project Completion Report12/16/2004
PO-30 Environmental Assessment (PDF)EA or EIS and Ecological Review12/16/2004
Lake Chapeau Warning Buoy Replacement (TE-26) Terrebonne Parish, LA DNR Contract No. 2503-03-18 Survey and Engineering Services (PDF)Project Completion Report12/1/2004
CS-32 Environmental Assessment (PDF)EA or EIS and Ecological Review11/1/2004
ME-22 Ecological Review (PDF)EA or EIS and Ecological Review9/17/2004
TE-48 Phase A Ecological Review (PDF)EA or EIS and Ecological Review9/16/2004
ME-21 Ecological Review (PDF)EA or EIS and Ecological Review9/14/2004
ME-22 Finding of No Significant Impact (PDF)EA or EIS and Ecological Review9/13/2004
ME-22 2004 Environmental Assessment (PDF)Environmental Assessment9/13/2004
TE-43 Ecological Review (PDF)EA or EIS and Ecological Review9/9/2004
TE-39 Ecological Review (PDF)EA or EIS and Ecological Review9/2/2004
ME-22 Wetland Value Assessment (PDF)WVA Pre-Design8/31/2004
TE-44 Construction Unit 2 Ecological Review (PDF)EA or EIS and Ecological Review8/26/2004
TE-44 Ecological Review (PDF)EA or EIS and Ecological Review8/26/2004
ME-16 Ecological Review (PDF)EA or EIS and Ecological Review8/25/2004
Freshwater Introduction South of Highway 82 Geotechnical Report (PDF)GEOTECHNICAL REPORT8/12/2004
BA-36 Ecological Review (PDF)EA or EIS and Ecological Review8/12/2004
GEOTECHNICAL STUDY TEST SECTIONS ROCKEFELLER REFUGE GULF SHORELINE STABILIZATION PROJECT, CAMERON PARISH, LOUISIANA (PDF)GEOTECHNICAL REPORT8/12/2004
TE-41 Monitoring Plan (PDF)OMM Plan8/5/2004
TE-41 2004 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report8/1/2004
Operation, Maintenance, and Rehabilitation Plan for the Mandalay Bank Protection Demonstration State Project No. TE-0041 (PDF)OMM Plan8/1/2004
North Lake Mechant Landbridge Restoration 95% Design Report (PDF)DESIGN REPORT8/1/2004
TV-18 Monitoring Plan (PDF)OMM Plan7/19/2004
TV-17 Monitoring Plan (PDF)OMM Plan7/15/2004
BA-02 2003 Operations, Maintenance and Monitoring Report (PDF)OM&M Report7/8/2004
TE-17 Project Completion Report (PDF)Project Completion Report7/1/2004
LA-03b Nutria Harvest Distribution 2003-2004 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2004 (PDF)OM&M Report6/30/2004
Task 3 from Request For Proposal - Project Specific Station Coordinates (Zipped file)Raw Data6/29/2004
TE-28 2003 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report6/14/2004
Task 3 from Request For Proposal - Project Specific Station Location Maps (PDF)Project Report6/2/2004
ME-22 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
LA-06 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-49 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TV-20 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
LA-05 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-33 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-32 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
PO-30 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-39 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-25b General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-34-2 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-37 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
MR-14 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-40 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
TE-50 General Project Fact Sheet (PDF)General Project Fact Sheet6/1/2004
BA-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
LA-05 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
LA-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
BA-25b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
BA-34-2 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
ME-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
MR-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
PO-33 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-49 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-50 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TV-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
TE-40 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet6/1/2004
AT-03 Monitoring Report (PDF)Monitoring Report5/5/2004
AT-03 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report5/5/2004
AT-02 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report5/5/2004
BA-23 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-22 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-17 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-09 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-28 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
BS-03a 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-17 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-09 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
MR-06 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-16 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-22 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-13 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
PO-06 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-21 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-31 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-12 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
BA-28 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-11b 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-18 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-23 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-24 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-28-1 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
CS-30 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-11 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
ME-14 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-20 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-24 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-26 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-27 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-41 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TE-44 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-03 2004 Operations, Maintenance, and Monitoring Report (PDF)OM&M Report5/1/2004
TV-18 Project Completion Report As Built Drawings (PDF)Project Completion Report4/22/2004
TE-22 Comprehensive Monitoring Report Part 1 of 2 (PDF)Comprehensive Monitoring Report4/5/2004
TE-22 Comprehensive Monitoring Report Part 2 of 2 (PDF)Comprehensive Monitoring Report4/5/2004
ME-21 Environmental Assessment (PDF)EA or EIS and Ecological Review4/2/2004
TV-18 Project Completion Report (PDF)Project Completion Report4/1/2004
Biological Monitoring Section Standard Operating Procedures (PDF)Project Report3/15/2004
BA-38 Environmental Assessment 2004 (PDF)Environmental Assessment3/1/2004
Barataria Barrier Island Complex: Pelican Island and Pass La Mer to Chaland Pass Restoration Environmental Protection (BA-0038) (PDF)BID DOCUMENTS2/6/2004
TE-41 Project Completion Report (As-Built) (PDF)Project Completion Report2/5/2004
TE-41 Project Completion Report (PDF)Project Completion Report2/1/2004
BA-27d Environmental Assessment (PDF)EA or EIS and Ecological Review2/1/2004
TE-28 Brady Canal Maintenance Project Levee Refurbishment along the West Bank of Jug Lake (PDF)Project Completion Report1/28/2004
ME-09 Summary Data and Graphics (PDF)Summary Data and Graphics1/27/2004
TV-11b Ecological Review (PDF)EA or EIS and Ecological Review1/22/2004
BA-27d Wetland Value Assessment (PDF)WVA Pre-Design1/7/2004
Pass Chaland to Grand Bayou Pass Barrier Shoreline Restoration Geotechnical Investigation (PDF)GEOTECHNICAL REPORT12/23/2003
BA-38 Environmental Assessment 2003 (PDF)Environmental Assessment12/22/2003
BA-20 Project Completion Report (Construction Unit 3) (PDF)Project Completion Report12/16/2003
BA-38 Wetland Value Assessment (PDF)WVA Pre-Design12/8/2003
CS-27 Summary Data and Graphics (PDF)OM&M Report12/8/2003
BA-38 Ecological Review (PDF)EA or EIS and Ecological Review12/3/2003
BS-03a Annual Report 2003 (PDF)OM&M Report12/1/2003
BA-20 Project Completion Report As-Built Plans (PDF)Project Completion Report12/1/2003
CS-17 Comprehensive Monitoring Report (PDF)OM&M Report12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
Timbalier Island Dune and Marsh Creation Bid Package (PDF)BID DOCUMENTS12/1/2003
TV-16 Summary Data and Graphics (PDF)OM&M Report11/18/2003
CS-22 Summary Data and Graphics (PDF)OM&M Report11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
Pelican Island Bid Documents and Appendices (PDF)BID DOCUMENTS11/18/2003
TE-28 Summary Data and Graphics part 1 of 3 (PDF)Summary Data and Graphics11/10/2003
TE-28 Summary Data and Graphics part 2 of 3 (PDF)Summary Data and Graphics11/10/2003
TE-28 Summary Data and Graphics part 3 of 3 (PDF)Summary Data and Graphics11/10/2003
Chaland Headland 95% Plans (PDF)DESIGN REPORT11/7/2003
Pelican 95% Plans (PDF)DESIGN REPORT11/7/2003
CS-11b Summary Data and Graphics (PDF)OM&M Report11/3/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
BA-38 Draft Bid Documents for Vegetative Plantings (PDF)BID DOCUMENTS11/1/2003
Report of Geotechnical Investigation Barataria Barrier Island Restoration Complex Project BA-38 Chaland and Pelican Headlands (PDF)GEOTECHNICAL REPORT10/30/2003
TE-45 Ecological Review (PDF)EA or EIS and Ecological Review10/28/2003
Pecan Island Terracing Geotechnical Report (PDF)GEOTECHNICAL REPORT10/28/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Pelican Island Bid Documents (PDF)BID DOCUMENTS10/18/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
Chaland Headland Issued Permits (PDF)PERMITS10/13/2003
TV-18 Ecological Review (PDF)EA or EIS and Ecological Review10/9/2003
CS-23 Summary Data and Graphics (PDF)OM&M Report10/1/2003
BA-37 Environmental Assessment (PDF)EA or EIS and Ecological Review10/1/2003
ME-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
ME-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-12 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
MR-13 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-32a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-34 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-39 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-41 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-43 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-44 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-45 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-11b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-15 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TV-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
PO-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
AT-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-03c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-04c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-27c General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BA-33 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-03a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-10 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
BS-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
CS-32 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
LA-03a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
ME-11 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2003
TE-41 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-43 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-44 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-45 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-39 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-32a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-34 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TV-11b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
TE-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
MR-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-27c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-33 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-03c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-04c General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
AT-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
PO-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
ME-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-32 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
LA-03a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-03a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-10 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BS-11 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
CS-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2003
BA-37 Ecological Review (PDF)EA or EIS and Ecological Review9/25/2003
CS-18 Summary Data and Graphics (PDF)OM&M Report9/25/2003
BA-20 Summary Data and Graphics (PDF)OM&M Report9/22/2003
CS-30 Summary Data and Graphics (PDF)OM&M Report9/8/2003
BA-03c Summary Data and Graphics (PDF)Summary Data and Graphics9/8/2003
Brady Canal Hydrologic Restoration (TE-28) Modifications As-Built Drawings (PDF)AS-BUILT9/4/2003
BS-03a Annual Report 2002 (PDF)OM&M Report9/1/2003
TE-29 Supplemental Monitoring (PDF)Contract Studies/Data Collection Report9/1/2003
ME-14 Project Completion Report As-Built Drawings (PDF)Project Completion Report9/1/2003
ME-13 Summary Data and Graphics (PDF)OM&M Report8/26/2003
CS-31 Summary Data and Graphics (PDF)Summary Data and Graphics8/26/2003
BS-11 Monitoring Plan (PDF)OMM Plan8/20/2003
ME-09 Summary Data and Graphics (PDF)OM&M Report8/20/2003
MR-03 Monitoring Plan (PDF)OMM Plan8/20/2003
MR-06 Monitoring Plan (PDF)OMM Plan8/14/2003
MR-09 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-16 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-06 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-11 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-09 Monitoring Plan (PDF)OMM Plan8/14/2003
ME-13 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-17 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-18 Monitoring Plan (PDF)OMM Plan8/14/2003
PO-22 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-22 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-23 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-26 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-28 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-04 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-09 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-14 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-12 Monitoring Plan (PDF)OMM Plan8/14/2003
TV-16 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-17 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-11b Monitoring Plan (PDF)OMM Plan8/14/2003
CS-09 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-18 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-20 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-30 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-27 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-28-1 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-23 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-22 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-24 Monitoring Plan (PDF)OMM Plan8/14/2003
CS-25 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-20 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-28 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-22 Monitoring Plan (PDF)OMM Plan8/14/2003
BS-03a Monitoring Plan (PDF)OMM Plan8/14/2003
AT-03 Monitoring Plan (PDF)OMM Plan8/14/2003
BA-02 Monitoring Plan (PDF)OMM Plan8/14/2003
TE-28 2003 Project Completion Report (PDF)Project Completion Report8/12/2003
ME-11 Project Completion Report (PDF)Project Completion Report8/12/2003
ME-19 Monitoring Plan (PDF)OMM Plan8/7/2003
MR-09 Summary Data and Graphics Part 1 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 2 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 3 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 4 of 5 (PDF)Summary Data and Graphics8/4/2003
MR-09 Summary Data and Graphics Part 5 of 5 (PDF)Summary Data and Graphics8/4/2003
BA-19 Monitoring Plan (PDF)OMM Plan8/1/2003
BA-23 Monitoring Plan (PDF)OMM Plan8/1/2003
CS-32 Ecological Review (PDF)EA or EIS and Ecological Review7/11/2003
CS-29 Ecological Review (PDF)EA or EIS and Ecological Review7/9/2003
BA-23 2001 Project Completion Report (PDF)Project Completion Report7/1/2003
BA-27 Project Completion Report (PDF)Project Completion Report7/1/2003
PO-06 2005 Project Completion Report (PDF)Project Completion Report7/1/2003
TV-15 Environmental Assessment (PDF)Environmental Assessment7/1/2003
TE-45 Environmental Assessment (PDF)EA or EIS and Ecological Review7/1/2003
PO-24 Environmental Assessment (PDF)EA or EIS and Ecological Review7/1/2003
PO-24 Project Completion Report As-Built Drawings (PDF)Project Completion Report7/1/2003
LA-03b Nutria Harvest Distribution 2002-2003 and a Survey of Nutria Herbivory Damage in Coastal Louisiana in 2003 (PDF)OM&M Report6/30/2003
BA-04c Summary Data and Graphics (PDF)Summary Data and Graphics6/25/2003
PO-22 Summary Data and Graphics (PDF)OM&M Report6/23/2003
CS-31 Monitoring Plan (PDF)Monitoring Plan6/11/2003
BA-23 Summary Data and Graphics (PDF)Summary Data and Graphics6/3/2003
PO-27 Summary Data and Graphics (PDF)OM&M Report6/3/2003
PO-06 Summary Data and Graphics (PDF)OM&M Report6/3/2003
PO-29 Ecosystem Health of the Maurepas Swamp: Feasibility and Projected Benefits of a Freshwater Diversion (PDF)Feasibility Study Report6/1/2003
A Contractor's Guide to Minimum Standards Required by the Louisiana Department of Natural Resources, Coastal Restoration Division (PDF)Project Report6/1/2003
Pelican Island 30% Design Report and Appendices (Zipped file)DESIGN REPORT6/1/2003
Caminada Headlands 30% Design Report and Appendices (PDF)DESIGN REPORT6/1/2003
PO-17 Summary Data and Graphics (PDF)OM&M Report5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
West Lake Boudreaux Shoreline Protection and Marsh Creation Geotechnical Investigation (PDF)GEOTECHNICAL REPORT5/23/2003
MR-06 Summary Data and Graphics (PDF)OM&M Report5/5/2003
Plans of Proposed TE-26 Lake Chapeau Warning Buoy Replacement (PDF)AS-BUILT5/1/2003
Office of Coastal Restoration and Management Quality Management Plan: 2008 (PDF)Project Report4/30/2003
TV-12 Project Completion Report (PDF)OM&M Report4/28/2003
BA-37 Geotechnical Investigation Part 2 of 2 (PDF)Contract Studies/Data Collection Report4/4/2003
BA-37 Geotechnical Investigation - Part 1 of 2 (PDF)Contract Studies/Data Collection Report4/4/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
Barataria/Plaquemines Barrier Shoreline Restoration Project Geotechnical Investigation and Analysis (PDF)GEOTECHNICAL REPORT4/1/2003
ME-19 Ecological Review (PDF)EA or EIS and Ecological Review3/11/2003
TV-18 Environmental Assessment (PDF)Environmental Assessment3/1/2003
TE-40 Ecological Review (PDF)EA or EIS and Ecological Review2/17/2003
ME-04 Progress Report 5 (PDF)OM&M Report1/22/2003
BA-27 CU2 Project Completion Report (PDF)Project Completion Report1/8/2003
BS-03a Project Completion Report (PDF)Project Completion Report1/8/2003
BA-27c (CU2) Project Completion Report (PDF)Project Completion Report1/8/2003
Geotechnical Study (Part II of II) Gulf Shoreline Stabilization Project Rockefeller Refuge, Cameron Parish, Louisiana (PDF)GEOTECHNICAL REPORT1/7/2003
BS-11 Ecological Assessment (PDF)EA or EIS and Ecological Review1/1/2003
BS-11 Environmental Assessment (PDF)Environmental Assessment1/1/2003
A Proposed Coast-Wide Reference Monitoring System for Evaluating Wetland Restoration Trajectories in Louisiana (PDF)Project Report1/1/2003
CWPPRA Adaptive Management: Assessment of Five Barrier Island Restoration Projects in Louisiana (PDF)General Programmatic Document1/1/2003
Chaland Headland and Pelican Island Barrier Shoreline Restoration - Borrow Area Impact Analysis (PDF)DESIGN REPORT1/1/2003
CS-24 Summary Data and Graphics (PDF)OM&M Report12/30/2002
ME-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
CS-20 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-28 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
PO-17 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
AT-02 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-26 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
BA-15 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-04 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
ME-09 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TV-03 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
CS-22 AMR Workshop Presentation (PDF)Adaptive Management Review Workshop Presentation12/23/2002
TE-40 Environmental Assessment (PDF)EA or EIS and Ecological Review12/21/2002
TE-28 Adaptive Management Review Final Report (PDF)Adaptive Management Review12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
CWPPRA Adaptive Management Review Final Report (PDF)General Programmatic Document12/20/2002
BA-27c (CU2) Project Completion Report (As-Built) (PDF)Project Completion Report12/2/2002
TV-04 Summary Data and Graphics Part 1 of 2 (PDF)Summary Data and Graphics12/2/2002
TV-04 Summary Data and Graphics Part 2 of 2 (PDF)Summary Data and Graphics12/2/2002
TE-43 Environmental Assessment (PDF)EA or EIS and Ecological Review12/1/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
Lake Borgne Shoreline Protection Project Geotech Borings and Logs (PDF)GEOTECHNICAL REPORT11/12/2002
North Lake Mechant Landbridge Restoration Geotechnical Investigation (PDF)GEOTECHNICAL REPORT10/31/2002
TV-13a Project Completion Report (PDF)Project Completion Report10/1/2002
AT-02 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
AT-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-02 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-15 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-27d General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-35 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-36 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-37 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
BA-38 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-04a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-11b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-21 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-25 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-31 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
LA-03b General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-13 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-14 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
ME-21 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
MR-06 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-06 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-16 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-19 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
PO-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-20 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-22 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-23 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-24 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-25 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-26 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-27 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-28 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-29 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-30 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-36 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-46 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-47 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TE-48 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-03 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-04 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-09 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-12 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-13a General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-14 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-16 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-17 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
TV-18 General Project Fact Sheet (PDF)General Project Fact Sheet10/1/2002
CS-20 General Programmatic Document (PDF)Project Report10/1/2002
ME-04 General Programmatic Document (PDF)Project Report10/1/2002
ME-09 General Programmatic Document (PDF)Project Report10/1/2002
TE-26 General Programmatic Document (PDF)Project Report10/1/2002
CS-11b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-25 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
LA-03b General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-04a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
CS-31 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-13 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
AT-02 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
AT-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-02 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-15 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-27d General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-35 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-36 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-37 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-38 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
ME-21 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
MR-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-06 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-19 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-20 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-22 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-23 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-24 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-25 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-26 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-27 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-28 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-30 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-12 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-13a General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-14 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-03 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-04 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-09 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-16 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-17 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TV-18 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
PO-29 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-36 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-46 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-47 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
TE-48 General Project Fact Sheet High Quality (PDF)General Project Fact Sheet10/1/2002
BA-03 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/23/2002
BA-04 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/23/2002
LA-03b Monitoring Plan (PDF)OMM Plan9/10/2002
TV-03 Adaptive Management Review Final Report (PDF)Adaptive Management Review9/5/2002
LA-03b Environmental Assessment (PDF)EA or EIS and Ecological Review9/1/2002
CS-31 Monitoring Plan (2013 Update) (PDF)Monitoring Plan8/28/2002
BA-19 General Programmatic Document (PDF)Project Report8/15/2002
Geotechnical Study (Part I of II) Gulf Shoreline Stabilization Project Rockefeller Refuge, Cameron Parish, Louisiana (PDF)GEOTECHNICAL REPORT8/13/2002
TE-26 Operations and Maintenance Plan 2002 (PDF)Project Report8/8/2002
BA-15 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report8/8/2002
TE-26 Monitoring Report (PDF)Monitoring Report8/8/2002
TE-26 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report8/8/2002
BA-03c Contracted Study Report (PDF)Contract Studies/Data Collection Report8/7/2002
LA-03b Ecological Review (PDF)EA or EIS and Ecological Review8/1/2002
BA-27c Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report7/31/2002
BA-27 2002 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report7/31/2002
Operation, Maintenance, and Rehabilitation Plan for the BA-27 - Barataria Land Bridge Shoreline Protection Phase 1 & 2 (Construction Unit No. 1) (PDF)OMM Plan7/31/2002
BA-02 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report7/30/2002
BA-02 Project Completion Report (PDF)Project Completion Report7/26/2002
TV-03 Adaptive Management Review (PDF)General Programmatic Document7/25/2002
TV-04 Adaptive Management Review - Shoreline Component (PDF)General Programmatic Document7/23/2002
TE-26 Adaptive Management Review (PDF)General Programmatic Document7/23/2002
AT-02 Adaptive Management Review (PDF)General Programmatic Document7/23/2002
TE-28 Adaptive Management Review (PDF)General Programmatic Document7/22/2002
ME-09 Adaptive Management Review Final Report (PDF)General Programmatic Document7/19/2002
TV-04 Adaptive Management Review - Hydrologic Restoration component (PDF)General Programmatic Document7/19/2002
BA-15 Adaptive Management Review Final Report (PDF)General Programmatic Document7/19/2002
PO-17 Adaptive Management Review Final Report (PDF)General Programmatic Document7/9/2002
CS-20 Adaptive Management Review Final Report (PDF)General Programmatic Document7/8/2002
TV-16 Project Completion Report (PDF)Project Completion Report7/5/2002
CS-22 Adaptive Management Review Final Report (PDF)General Programmatic Document7/2/2002
CS-19 Close-Out Report (PDF)OM&M Report7/1/2002
TE-41 Ecological Review (PDF)EA or EIS and Ecological Review7/1/2002
ME-04 Adaptive Management Review (PDF)General Programmatic Document7/1/2002
ME-04 TV-11 2002 Project Completion Report (PDF)Project Completion Report6/20/2002
ME-04 2002 Completion Report for Maintenance/Repair (PDF)Project Completion Report6/20/2002
TE-44 Construction Unit 1 Ecological Review (PDF)EA or EIS and Ecological Review6/1/2002
CS-28-1 Project Completion Report (PDF)Project Completion Report5/8/2002
CS-28-1 2008 Project Completion Report (PDF)Project Completion Report5/8/2002
TE-22 Monitoring Report (PDF)Monitoring Report4/24/2002
TE-22 Operations and Maintenance Plan 2002 (PDF)Project Report4/24/2002
TE-22 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report4/24/2002
BA-23 Project Completion Report As-Built Drawings (PDF)Project Completion Report4/8/2002
CS-09 Hydrodynamic Modeling (PDF)Contract Studies/Data Collection Report3/1/2002
TE-28 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report2/14/2002
TE-28 Operation, Maintenance, and Rehabilitation Plan (PDF)OM&M Report2/14/2002
TE-28 2002 Operation, Maintenance, and Rehabilitation Plan (PDF)Project Report2/14/2002
Operation, Maintenance, and Rehabilitation Plan for the Brady Canal Hydrologic Restoration Project TE-28 (PDF)OM&M Report2/14/2002
ME-09 Comprehensive Monitoring Report 2 (PDF)OM&M Report2/1/2002
BA-15 Comprehensive Monitoring Report 1 (PDF)OM&M Report2/1/2002
CS-27 Project Completion Report (PDF)Project Completion Report1/28/2002
CS-27 2006/2007 Annual Inspection Report (PDF)Inspection Report1/28/2002
ME-14 Environmental Assessment (PDF)Environmental Assessment1/1/2002
TV-14 Project Completion Report (PDF)Project Completion Report12/19/2001
BA-27c Project Completion Report (PDF)Project Completion Report11/30/2001
BA-02 CU2 Project Completion Report - As-Built Drawings (PDF)Project Completion Report11/28/2001
BA-20 Project Completion Report (PDF)Project Completion Report11/9/2001
BA-38-2 Project Completion Report (PDF)Project Completion Report11/1/2001
BA-37 Wetland Value Assessment (PDF)WVA Pre-Design10/1/2001
BA-27c (CU1) Project Completion Report (As-Built) (PDF)Project Completion Report9/28/2001
BA-26 Project Completion Report (AS-BUILT) (PDF)Project Completion Report9/28/2001
BA-26 2001 Project Completion Report (PDF)Project Completion Report9/26/2001
BS-11 Ecological Review (PDF)EA or EIS and Ecological Review9/1/2001
TV-04 2001 Project Completion Report (PDF)Project Completion Report8/14/2001
CS-18 Comprehensive Monitoring Report 2 (PDF)OM&M Report8/1/2001
PO-06 2001 Project Completion Report (PDF)Project Completion Report6/27/2001
CS-22 Comprehensive Monitoring Report (PDF)OM&M Report6/1/2001
PO-29 Report on Maurepas Restoration Project Report on Maurepas Restoration Project (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment A - Draft Project Development Plan January 6, 2000 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment B - Site maps (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment C Draft Hydrologic Modeling May 30, 2001 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment D Cost Estimates (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment E Draft Swamp Ecology (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment F Draft Water Quality Analysis (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Attachment G WVA Revised Project Information Sheet May 2001 (PDF)Project Report6/1/2001
PO-29 Report on Maurepas Restoration Project Wetland Value Assessment Community Model (PDF)Project Report6/1/2001
TE-37 Monitoring Plan (PDF)OMM Plan5/29/2001
TE-28 2001 Project Completion Report (PDF)Project Completion Report5/16/2001
CS-11b Project Completion Report (PDF)Project Completion Report5/16/2001
BA-19 Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report5/1/2001
PO-27 Monitoring Plan (PDF)OMM Plan4/4/2001
Monitoring Progress Report No. 1, For the Period February 14, 1998 to August 25, 1999 Whiskey Island Restoration (PDF)OM&M Report4/1/2001
PO-25 Feasibility Study Report Part 1 of 2 (PDF)Feasibility Study Report4/1/2001
PO-25 Feasibility Study Report Part 2 of 2 (PDF)Feasibility Study Report4/1/2001
AT-02 Progress Report No. 1 (PDF)Progress Report3/1/2001
PO-22 Project Completion Report (PDF)Project Completion Report1/22/2001
TE-37 Environmental Assessment (PDF)EA or EIS and Ecological Review1/10/2001
CS-19 Comprehensive Monitoring Report 2 (PDF)Monitoring Report1/1/2001
CS-19 Close-Out Monitoring Report (PDF)OM&M Report1/1/2001
TE-37 Ecological Review (PDF)EA or EIS and Ecological Review12/1/2000
PO-28 Ecological Review (PDF)EA or EIS and Ecological Review12/1/2000
TE-18 Progress Report 6 (PDF)OM&M Report12/1/2000
BA-20 Wetland Value Assessment (PDF)WVA Pre-Design11/2/2000
CS-27 Environmental Assessment (PDF)Environmental Assessment11/1/2000
Black Bayou Hydrologic Restoration Environmental Assessment (PDF)Environmental Assessment11/1/2000
Brady Canal Hydrologic Restoration Construction Unit 2 As-Builts (PDF)AS-BUILT10/24/2000
BS-11 Wetland Value Assessment (PDF)WVA Pre-Design10/3/2000
Quality management plan for Coastal Wetlands Planning, Protection, and Restoration Act monitoring program (PDF)Project Report6/1/2000
TE-17 Comprehensive Monitoring Report (PDF)OM&M Report6/1/2000
TE-10 Monitoring Plan (PDF)OMM Plan5/23/2000
CS-20 2000 Comprehensive Monitoring Report (PDF)OM&M Report5/1/2000
CS-20 Progress Report 4 (PDF)OM&M Report5/1/2000
BA-04c Progress Report 3 (PDF)Progress Report5/1/2000
TE-23 Project Completion Report (PDF)Project Completion Report3/15/2000
TE-36 Progress Report 1 (PDF)OM&M Report3/1/2000
BA-15 Progress Report 1 (PDF)OM&M Report3/1/2000
BA-03c Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report2/24/2000
BA-03c Progress Report 2 (PDF)Progress Report2/24/2000
TE-25 and TE-30 Project Completion Report (PDF)Project Completion Report2/1/2000
TE-25 and TE-30 Project Completion Report (PDF)Project Completion Report2/1/2000
TE-25 and 30 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/15/2000
TE-25 and 30 Project Completion Report As-Built Drawings (PDF)Project Completion Report1/15/2000
ME-13 Progress Report 1 (PDF)OM&M Report1/11/2000
MR-06 Progress Report 1 (PDF)OM&M Report12/1/1999
ME-19 Wetland Value Assessment (PDF)WVA Pre-Design10/4/1999
TE-29 Progress Report 1 (PDF)OM&M Report8/1/1999
TE-22 Phase 3 Environmental Assessment (PDF)Environmental Assessment8/1/1999
BA-03c / BA-26 Monitoring Plan (PDF)Monitoring Plan6/16/1999
BA-03c / BA-26 Monitoring Plan (PDF)Monitoring Plan6/16/1999
PO-17 Progress Report 5 (PDF)OM&M Report4/1/1999
Whiskey Island Restoration Vegetation Plantings As-Built (PDF)AS-BUILT4/1/1999
TE-36 Monitoring Plan (PDF)OMM Plan3/1/1999
TV-12 Project Completion Report (PDF)Project Completion Report1/1/1999
TE-28 CU1 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report1/1/1999
TE-28 CU2 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report1/1/1999
A Survey of Nutria Herbivory Damage in Coastal Louisiana in 1998 (PDF)Program Report12/31/1998
TE-20 and TE-24 As-Built Drawings (PDF)Project Completion Report12/16/1998
TE-20 and TE-24 As-Built Drawings (PDF)Project Completion Report12/16/1998
AT-02 Engineering Closure Report (PDF)General Programmatic Document12/1/1998
AT-02 Engineering Closure Report (PDF)General Programmatic Document12/1/1998
TE-29 Wave Height Measurements - September 1998 (PDF)Contract Studies/Data Collection Report11/20/1998
TE-29 Wave Height Measurements - July 1998 (PDF)Contract Studies/Data Collection Report9/25/1998
TE-27 Project Completion Report (As-Built) (PDF)Project Completion Report9/15/1998
TV-09 Comprehensive Monitoring Report (PDF)OM&M Report9/1/1998
BA-25 Evaluation Report Part 2 (PDF)Evaluation Report9/1/1998
BA-25 Evaluation Report Part 1 (PDF)Evaluation Report9/1/1998
TV-09 Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report9/1/1998
TV-12 Environmental Assessment (PDF)Environmental Assessment8/1/1998
Whiskey Island Restoration Vegetation Plantings (PDF)BID DOCUMENTS8/1/1998
TE-29 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-30 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-27 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-24 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-20 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-18 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-17 Monitoring Plan (PDF)OMM Plan7/23/1998
PO-20 Monitoring Plan (PDF)OMM Plan7/23/1998
MR-08 Monitoring Plan (PDF)OMM Plan7/23/1998
ME-12 Monitoring Plan (PDF)OMM Plan7/23/1998
BA-15 Monitoring Plan (PDF)OMM Plan7/23/1998
CS-21 Monitoring Plan (PDF)OMM Plan7/23/1998
CS-19 Monitoring Plan (PDF)OMM Plan7/23/1998
TE-25 Monitoring Plan (PDF)OMM Plan7/15/1998
BA-19 Progress Report 2 (PDF)Progress Report7/14/1998
CS-20 Progress Report 3 (PDF)OM&M Report6/15/1998
TE-18 Progress Report 5 (PDF)OM&M Report6/10/1998
CS-26 Monitoring Plan (PDF)OMM Plan6/8/1998
PO-18 Progress Report 1 (PDF)OM&M Report6/1/1998
ME-12 Closeout Monitoring Report (PDF)OM&M Report6/1/1998
LA-03a Monitoring Plan (PDF)OMM Plan5/6/1998
TE-25 Environmental Assessment (PDF)EA or EIS and Ecological Review5/1/1998
TE-22 Progress Report 1 (PDF)OM&M Report4/29/1998
TE-23 Project Completion Report Maintenance Dredging As-Built Drawings (PDF)Project Completion Report4/17/1998
TE-27 Geotechnical Report (PDF)Contract Studies/Data Collection Report4/14/1998
PO-16 Progress Report 3 (PDF)OM&M Report4/8/1998
PO-17 Comprehensive Monitoring Report (PDF)OM&M Report4/1/1998
TE-29 Wave Height Measurements - March 1998 (PDF)Contract Studies/Data Collection Report4/1/1998
BA-04c Comprehensive Monitoring Report (PDF)Comprehensive Monitoring Report4/1/1998
Whiskey Island Restoration Vegetation Plantings Plan Set (PDF)BID DOCUMENTS3/30/1998
CS-22 Progress Report 1 (PDF)OM&M Report3/5/1998
TE-25 and TE-30 Pre-Construction Plans (PDF)Project Completion Report2/26/1998
TE-25 and TE-30 Pre-Construction Plans (PDF)Project Completion Report2/26/1998
TV-03 Progress Report 3 (PDF)OM&M Report2/16/1998
ME-04 Progress Report 4 (PDF)OM&M Report1/28/1998
CS-17 Progress Report 1 (PDF)OM&M Report1/24/1998
TE-27 Pre-Construction Plans (PDF)Project Completion Report1/7/1998
BA-19 Progress Report 1 (PDF)Progress Report1/6/1998
CS-18 Comprehensive Monitoring Report 1 Part 1 (PDF)OM&M Report1/1/1998
CS-18 Comprehensive Monitoring Report 1 Whole report (PDF)Comprehensive Monitoring Report1/1/1998
CS-18 Comprehensive Monitoring Report 1 Part 2 (PDF)Comprehensive Monitoring Report1/1/1998
BA-27 Wetland Value Assessment (PDF)Wetland Value Assessment12/19/1997
BA-27c Wetland Value Assessment (PDF)WVA Pre-Design12/19/1997
BA-02 Project Completion Report - As-Built Plans (PDF)Project Completion Report12/15/1997
CS-19 Comprehensive Monitoring Report 1 (PDF)OM&M Report12/1/1997
TE-26 Environmental Assessment (PDF)Environmental Assessment12/1/1997
BA-28 Wetland Value Assessment (PDF)WVA Pre-Design11/1/1997
TE-29 Contracted Study Report - October 1997 (PDF)Contract Studies/Data Collection Report10/25/1997
TE-26 Coring and Sediment Analysis (PDF)Contract Studies/Data Collection Report9/12/1997
TE-20 and TE-24 Project Completion Report (Pre-Construction Plans) (PDF)Project Completion Report9/8/1997
TE-27 Addendum to the Environmental Assessment (PDF)EA or EIS and Ecological Review8/19/1997
TV-09 Progress Report 4 (PDF)OM&M Report8/13/1997
ME-09 Comprehensive Monitoring Report 1 (PDF)OM&M Report7/1/1997
CS-20 Progress Report 2 (PDF)OM&M Report6/23/1997
ME-09 Progress Report 3 (PDF)OM&M Report6/13/1997
TE-18 Progress Report 4 (PDF)OM&M Report6/8/1997
BA-15 Phase 2 Environmental Assessment (PDF)Environmental Assessment6/1/1997
ME-12 Progress Report 2 (PDF)OM&M Report5/21/1997
PO-16 Progress Report 2 (PDF)OM&M Report5/5/1997
TV-09 Progress Report 3 (PDF)OM&M Report4/22/1997
PO-17 Progress Report 4 (PDF)OM&M Report4/17/1997
CS-19 Progress Report 4 (PDF)OM&M Report4/1/1997
CS-31 Preliminary Feasibility Report (PDF)Feasibility Study Report4/1/1997
CS-22 Project Completion Report (PDF)Project Completion Report3/18/1997
TV-03 Progress Report 2 (PDF)OM&M Report3/4/1997
ME-04 Progress Report 3 (PDF)OM&M Report2/12/1997
ME-12 Progress Report 1 (PDF)OM&M Report12/30/1996
PO-16 Progress Report 1 (PDF)OM&M Report12/19/1996
CS-20 Progress Report 1 (PDF)OM&M Report12/16/1996
CS-19 Progress Report 3 (PDF)OM&M Report12/9/1996
TE-18 Progress Report 3 (PDF)OM&M Report11/26/1996
TV-03 Progress Report 1 (PDF)OM&M Report11/26/1996
ME-08 Comprehensive Monitoring Report No. 1 (PDF)OM&M Report11/1/1996
TE-29 Project Completion Report - As-Built Plans (PDF)Project Completion Report11/1/1996
PO-17 Progress Report 3 (PDF)OM&M Report10/17/1996
BA-02 Wetland Value Assessment (PDF)WVA Pre-Design8/28/1996
TE-26 Geotechnical Investigation (PDF)Contract Studies/Data Collection Report7/9/1996
BA-15 Phase 1 Environmental Assessment (PDF)Environmental Assessment7/1/1996
CS-19 Progress Report 2 (PDF)OM&M Report6/26/1996
ME-04 Progress Report 2 (PDF)OM&M Report6/24/1996
CS-18 Progress Report 3 (PDF)OM&M Report6/18/1996
TE-18 Progress Report 2 (PDF)OM&M Report6/3/1996
AT-02 Environmental Assessment (PDF)Environmental Assessment6/1/1996
AT-03 Environmental Assessment (PDF)Environmental Assessment6/1/1996
BA-04c Monitoring Plan (PDF)Monitoring Plan5/15/1996
ME-09 Progress Report 2 (PDF)OM&M Report5/8/1996
PO-17 Progress Report 2 (PDF)OM&M Report5/6/1996
BA-04c Progress Report 2 (PDF)Progress Report4/25/1996
TV-09 Progress Report 2 (PDF)OM&M Report3/27/1996
CS-17 Wetland Value Assessment (PDF)WVA Pre-Design2/27/1996
TV-03 Project Completion Report (PDF)Project Completion Report2/13/1996
TE-28 Environmental Assessment (PDF)EA or EIS and Ecological Review2/1/1996
CS-18 Progress Report 4 (PDF)OM&M Report1/27/1996
CS-18 Progress Report 2 (PDF)OM&M Report1/11/1996
Soil Borings and Laboratory Tests Sand Source Borings Isle Dernieres Restoration Project East and Trinity Islands (PDF)GEOTECHNICAL REPORT1/8/1996
Soil Borings and Laboratory Tests Sand Source Borings Isle Dernieres Restoration Project East and Trinity Islands (PDF)GEOTECHNICAL REPORT1/8/1996
TV-09 Project Completion Report (PDF)Project Completion Report1/1/1996
BA-04c Monitoring Report (PDF)Monitoring Report1/1/1996
PO-17 Progress Report 1 (PDF)OM&M Report10/24/1995
TV-09 Progress Report 1 (PDF)OM&M Report10/17/1995
ME-04 Progress Report 1 (PDF)OM&M Report10/9/1995
BA-03c Progress Report 1 (PDF)Progress Report10/4/1995
CS-18 Progress Report 1 (PDF)OM&M Report9/21/1995
BA-04c Progress Report 1 (PDF)Progress Report9/21/1995
ME-08 Progress Report 1 (PDF)OM&M Report9/19/1995
TE-18 Progress Report 1 (PDF)OM&M Report9/19/1995
ME-09 Progress Report 1 (PDF)OM&M Report9/18/1995
CS-19 Progress Report 1 (PDF)OM&M Report9/18/1995
CS-11b WVA Pre-Design (PDF)WVA Pre-Design9/7/1995
Coastal Protection and Restoration Authority Bid Plans for Queen Bess (BA-0019) (PDF)BID DOCUMENTS6/15/1995
ME-04 Project Completion Report (PDF)Project Completion Report4/27/1995
TE-22 Phase 1 Environmental Assessment (PDF)Environmental Assessment3/1/1995
BA-23 Wetland Value Assessment Pre-Design (PDF)WVA Pre-Design1/17/1995
ME-08 Monitoring Plan (PDF)OMM Plan9/12/1994
TE-29 WVA Pre-Design (PDF)WVA Pre-Design8/8/1994
BA-03C Wetland Value Assessment (PDF)Wetland Value Assessment7/6/1994
PO-17 Project Completion Report (PDF)Project Completion Report4/29/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
Final Engineering Report for Isles Dernieres Restoration Project: Phase 0 - Eastern Isle Dernieres and Phase 1 - Trinity Island (PDF)DESIGN REPORT3/31/1994
TE-28 WVA Pre-Design (PDF)WVA Pre-Design1/1/1994
Subsoil Investigation Isle Dernieres Restoration Eastern Isle Derniere and Trinity Island (PDF)GEOTECHNICAL REPORT11/24/1993
Subsoil Investigation Isle Dernieres Restoration Eastern Isle Derniere and Trinity Island (PDF)GEOTECHNICAL REPORT11/24/1993
BA-02 Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report11/1/1993
TE-32a (TE-07) Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report10/19/1993
CS-04a WVA Pre-Design (PDF)WVA Pre-Design9/8/1993
PO-17 (PO-03a) Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report6/5/1993
BA-04 Vegetative Delineation Report (PDF)Contract Studies/Data Collection Report3/30/1993
PO-17 Executive Summary (PDF)General Programmatic Document1/1/1993
BS-04a Feasibility Report (PDF)Feasibility Study Report12/31/1992
CS-11b Feasibility Study (PDF)Feasibility Study Report10/1/1992
CS-21 WVA Pre-Design (PDF)WVA Pre-Design9/11/1992
CS-21 Wetland Value Assessment (PDF)Wetland Value Assessment9/11/1992
CS-22 WVA Pre-Design (PDF)WVA Pre-Design8/28/1992
BS-03A WVA Pre-Design (PDF)WVA Pre-Design8/18/1992
CS-20 WVA Pre-Design (PDF)WVA Pre-Design8/12/1992
AT-03 WVA Pre-Design (PDF)WVA Pre-Design6/29/1992
AT-02 WVA Pre-Design (PDF)WVA Pre-Design6/29/1992
BS-03A Feasibility Report (PDF)Feasibility Study Report5/1/1992
PO-17 Feasibility Report- Draft (PDF)Feasibility Study Report2/3/1992
CS-18 WVA Pre-Design (PDF)WVA Pre-Design11/14/1991
BA-02 Feasibility Report (PDF)Feasibility Study Report9/30/1991
BA-19 WVA Pre-Design (PDF)WVA Pre-Design9/30/1991
PO-17 (PO-3a) Project Plan Update (PDF)General Programmatic Document7/10/1991
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Geotechnical Data Report Overview of Island Study Isles Dernieres Stabilization Project (PDF)GEOTECHNICAL REPORT12/23/1987
Grand Lake Shoreline Protection Tebo Point Bid Package (PDF)BID DOCUMENTS1/1/1900
Grand Lake Shoreline Protection Tebo Point Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Cameron-Creole Watershed Grand Bayou Marsh Creation Project (CS-0054) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Sign Replacement (BA-0002 & TE-0022 ) Timber Cap Replacement (TE-0026) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Rockefeller Refuge Gulf Shoreline Stabilization Project (ME-0018) Bid Package (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Hydrologic Restoration and Vegetative Planting in the Des Allemands Swamp (BA-34-2) (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Maintenance/Construction Feature Removal Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Raccoon Island Breakwater Rehabilitation Project (TE-0048) Bid Package (PDF)BID DOCUMENTS1/1/1900
Brady Canal Hydrologic Restoration Construction Unit 1 (PDF)AS-BUILT1/1/1900
TE-34 Floating Debris Barrier Brady Canal and Superior Canal As-Builts (PDF)AS-BUILT1/1/1900
River Reintroduction into Maurepas Swamp Project (PO-0029) Preliminary Operations, Maintenance, Monitoring, and Adaptive Management Plan (PDF)OMM Plan1/1/1900
PO-104 Change Order #1 (PDF)BID DOCUMENTS1/1/1900
Lost Lake Marsh Creation and Hydrologic Restoration (TE-72) Pre-Bid Meeting Sign In Sheet (PDF)BID DOCUMENTS1/1/1900